2017-06-23Capital Dredging Works at Dublin Port — 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 m³ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month …
View the procurement »
2017-06-23Establishment of a framework to provide a comprehensive facilities management service, on both a planned and... (The Digital Hub Development Agency)
A single party framework will be established to provide a comprehensive facilities management service, on both a planned and reactive basis, to the Digital Hub Development Agency's (DHDA) premises at the Digital Hub Campus, Dublin 8 for a period of up to seven (7) years duration.
The framework will include both scheduled services and call out cover in the event of system failures/urgent requirements. Critical events or equipment failure will demand a four (4) hour maximum response time. It will be an …
View the procurement » Mentioned suppliers:CBRE
2017-06-16Ecological Consultancy Services (Electricity Supply Board ( ESB ))
ESB Group has a requirement for external support to the in-house team, in the form of specialist Ecological Consultancy Services, in order to manage ecological aspects of its own activities and the provision of services to its clients, mainly in the Republic of Ireland, Northern Ireland and Great Britain.
ESB Group activities and services relate primarily to the development and operation of generating stations (thermal, hydro, wind farm, solar and biomass) and the building and maintenance of the …
View the procurement »
2017-06-09Enabling Works Contract, Smooth Point, Killybegs Fishery Harbour Centre (Department of Agriculture, Food and the Marine)
The works will comprise the following:
Environmental dredging of approximately 24 500 cubic metres of contaminated marine sediments.
Stabilisation of the dredge material within the Fishery Harbour Centre.
Removal of the stabilised material from site for re-use or disposal.
Removal of an existing stockpile of inert clay (circa 13 000 cubic metres) from the harbour.
Putting in place all necessary waste permits, licences or permissions required to lawfully stabilise the dredged material and remove it from …
View the procurement » Mentioned suppliers:ABCO Marine (IRL) Ltd
2017-06-08Integrated Facilities Management (Electricity Supply Board ( ESB ))
ESB intends to enter in to a framework agreement with 1 or more service providers to provide integrated facilities management services. ESB requires the provision of these facilities management services to support certain of its operations in Ireland and may also include ESB locations in the UK.
It is currently envisaged that the services will be supplied to the majority of ESB office properties and ESB Networks depots and may be extended to include the provision of selected or all services to other ESB …
View the procurement » Mentioned suppliers:AramarkNoonan Services Group Ltd
2017-06-02National waste statistics collection, validation and compilation support (Environmental Protection Agency)
The Environmental Protection Agency (EPA) intends to establish a multi-operator framework for 4 years. The initial contract, and subsequent contracts will be for the provision of an on-site resource (one contractor) within the EPA Headquarters in Wexford, Ireland, to support and assist the EPA's Waste Statistics Team in carrying out tasks related to the EPA's responsibilities for national waste reporting under 6 statutory reporting obligations (Waste Statistics Regulation, Waste Electrical and Electronic …
View the procurement »
2017-06-01Single Supplier Framework Contract for the provision of Cleaning, Catering and Hospitality to the buildings of the... (The Office of Government Procurement)
In summary, the Services comprise:
1) Cleaning (including minor repair and maintenance) at the following locations:
a) The Merrion Campus, which consists of 3 buildings at the following addresses: 7-9 Merrion Row, Dublin 2 (all 7 floors), South and North Block, Government Buildings, Merrion Street (all 5 floors) and 14 - 16 Merrion Street, Dublin 2 (all 5 floors).
b) St Stephen's Green House, Earlsfort Terrace, Dublin 2 (3rd and 4th Floors only).
c) 12 Clare Street, Dublin 2 (4 Floors).
d) Office of the …
View the procurement »
2017-05-30Multiparty Framework Agreement for the Disposal of Repatriated Waste from Northern Ireland (Dublin City Council)
Since 2000, thousands of tonnes of waste were illegally deposited at various sites in Northern Ireland which had origins in the Republic of Ireland. An agreement was reached between the 2 jurisdictions for the repatriation of this waste. Dublin City Council, as the competent authority for the Republic of Ireland, requires a service for the disposal of this waste from up to 5 of these sites to an authorised facility in the Republic of Ireland. This competition will involve the appointment of a number of …
View the procurement »
2017-04-26Trinity Technology Enterprise Campus (The University of Dublin Trinity College)
Trinity is Ireland's leading university and is committed to delivering excellence in education, research and innovation. Trinity must continue to focus on the recruitment of world-class faculty and students; compete globally for research funding at scale and develop strong partnerships with the innovation and enterprise sector which can maximise the transfer of knowledge to enable social and economic benefit. To this end, Trinity proposes to develop our Trinity Technology Enterprise Campus (TTEC). The …
View the procurement » Mentioned suppliers:Perkins+Will
2017-04-24Contract for the Design and Delivery of a Sustainable Integrated Mixed Tenure Housing Development at Kilcarbery, Dublin 22 (South Dublin County Council)
The project is for the development of a site at Kilcarbery, Dublin 22 for a sustainable, mixed tenure housing development in accordance with the Kilcarbery Grange Preliminary Masterplan (‘Masterplan’), the South Dublin County Council Development Plan 2016-2022, Rebuilding Ireland, an Action Plan for Housing and Homelessness and planning legislation. The development site has an estimated capacity for 892 units (subject to planning permission), with the exact number to be explored during the dialogue …
View the procurement »
2017-04-06Louth County Council — Municipal Waste Management & Disposal Services (Bulky Waste) (Louth County Council)
This public procurement competition proposes to engage in a competitive process for the establishment of framework agreements for the provision of Municipal Waste management and disposal (bulky waste) services for the Contracting Authority. Each contract will be awarded as a separate lot. Tenderers may bid for one or all Lots.
LOT 1: Municipal waste management and disposal services contract for Dundalk and Drogheda; and
LOT 2: Municipal waste management and disposal services contract for various source …
View the procurement »
2017-03-29Spatial Data and Evidence Projects (Marine Institute)
The Marine Institute wishes to put a single supplier Framework Agreement in place, for the following specific primary projects, known collectively as the ‘Spatial Data and Evidence Projects’:
Project 1: Data Discovery, Collation and Gap Analysis and Collection.
Project 2: Map and Assess Marine Ecosystems and their Services.
Project 3: Climate Change.
Project 4: Modelling and Support Tools.
View the procurement »
2017-03-24Consultancy Services for Grange Castle (South Dublin County Council)
South Dublin County Council requires the services of a multi-disciplinary Consulting engineer to provide some or all stages including preliminary design, planning, detailed design, tender action, supervision and management of construction and handover stages; including PSDP services for the Management of Grange Castle Business Parks and to advise on engineering decisions / issues that arise in the parks during the duration of the framework.
View the procurement »
2017-03-23Millstreet WWTP Upgrade Contract (Irish Water)
The Contracting Entity intends to appoint a Contractor who will be responsible for the design, construction and operation, for some elements, of major Civil, MEICA and process works (incorporating associated works and services) at Millstreet WWTP and within the wider agglomeration. These works will be part of Irish Water's Capital Investment Plan.
Please refer to the PQQ documents for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-03-14Washroom and Dustmat Services (Bus Eireann/Irish Bus)
The Contracting Authority proposes awarding a Contract for the provision of washroom and dust mat services for a three year period. The Contracting Authority reserves the right to extend this Contract(s) for a further period of 12 or 24 months. The Contracting Authority proposes awarding a Contract for the washroom and dustmat services requirement for a three year period. The Contracting Authority reserves the right to extend this Contract(s) for a further period of 12 or 24 months.
View the procurement » Mentioned suppliers:Berensden
2017-03-07Remediation of Former Steelworks Site Haulbowline Island, Cork Harbour, Ireland (Cork County Council)
The Haulbowline Former Irish Steelworks Factory Site is located in Cork Harbour Ireland and is approximately 11.3ha in size. On the North, South and East it is bordered by the Cork Harbour Waters and on the West it is bordered by lands under the control of the Irish Naval Services. The Haulbowline Island Former Irish Steelworks Factory Site Remediation is to be executed under a Design-Build Contract.
View the procurement »
2017-03-02Timoole unauthorised landfill remediation works (Meath County Council)
The works involve the excavation of waste material at Timoole unauthorised landfill County Meath and the subsequent disposal of the waste at an appropriately authorised facility. The resultant void will be reinstated to be in keeping with the surrounding environment. The waste infill area covers <1 hectare.
View the procurement » Mentioned suppliers:Priority Construction Ltd
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-24Emissions and waste data collection, collation and validation support (Environmental Protection Agency)
The Environmental Protection Agency (EPA) requires the provision of an on-site resource (1 contractor) within the EPA Headquarters in Wexford, Ireland, to support and assist the EPA's Pollutant Release and Transfer Register (PRTR) Team in carrying out tasks related to the EPA's competent authority role under the national PRTR regulations. Key tasks include the collection, collation and validation of data (concerning releases to air, water, waste-water and off-site waste transfers as reported from large …
View the procurement » Mentioned suppliers:Wolfhound Archaeology
2017-02-21Ringsend WwTP Retrofit Contract Stage 1 (Irish Water)
Ringsend Wastewater Treatment Plant (WwTP) treats most of the wastewater arising in the Greater Dublin Area. Irish Water is inviting tenders for a contract which will comprise the upgrading and retrofitting of between 8 and 11 of the upper deck tanks, and an aerobic granular sludge (AGS) biological treatment process (the Works) for which the Contracting Entity has already procured the proprietary Nereda® process.
Please refer to the PQQ for further details.
View the procurement »
2017-02-20Servicing of Recycling Bring Banks throughout Louth County Council Bring Bank Network (Louth County Council)
Provision and installation of receptacles (where receptacles owned by existing service provider) for the collection of coloured segregated glass i.e. clear glass, green glass brown glass and aluminium cans. (Lot 1 only)
Operation, management and maintenance of bring banks for clear glass, green glass, brown glass and aluminium cans. (Lot 1 only)
Operation, management and maintenance of bring banks for the collection of plastic containers. (Lot 2 only).
View the procurement » Mentioned suppliers:Glassco Recycling Ltd.
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-01-18Interceptor Cleaning Service (Dublin Bus / Bus Atha Cliath)
Dublin Bus require a service for the cleaning of interceptors.
The service involves the removal of contaminated sludge, silt, and oily surface films from the interceptors, traps, channels, and grilles at the various locations within our 7 Dublin City Garages as indicated on our service point listings. The interceptors, traps, channels, and grilles are to be serviced at the time intervals indicated on the service point listings.
Removal of all contaminated sludge, silt, and oily surface films collected …
View the procurement » Mentioned suppliers:Rilta Environmental