2021-01-20   Multi-party Framework Agreement for Building Maintenance Services at Maynooth University (Maynooth University)
Maynooth University wishes to establish a multi-operator framework agreement for the provision of building maintenance services on its campus. View the procurement »
Mentioned suppliers: H&J Martin Asset Management Services IMAC Facilities Management IRL Kelbuild Ltd McDBS Ltd t/a McDermott Building Services McKeon Group Murcom building services
2020-12-19   Rubrics Building and Chief Steward’s House Main Contractor Works for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the works contract (including other services). The project concerns the construction works located at the University’s city centre campus. The contracting authority intends to invite 5 candidates to tender, please note that the contracting authority reserves the right to invite at least 5, subject to the number qualifying. View the procurement »
Mentioned suppliers: Clancy Project Management Limited
2020-10-30   PQQ-Single Party Framework for the Provision Kitchen Repairs and Maintenance Services (Bus Eireann/Irish Bus)
Bus Éireann (BE) is looking for a service provider to manage kitchen repairs services at our depot nationwide. The company operates from 17 regional depots. The tender is divided into two lots. View the procurement »
2020-10-07   Extension (E01) and Partial Refurbishment Block (B) (IT Sligo)
The works comprise an new four-storey Extension (E01) to Block (B) together with partial refurbishment of the existing building. The proposed extension will be circa 3 950 m with refurbishment involving approximately 430 m. Accommodation will comprise mixed teaching and research facilities including undergraduate and postgraduate science laboratories, clean room, PC laboratories, project rooms, classrooms, research facilities, online leaning facilities together with staff and ancillary accommodation and … View the procurement »
Mentioned suppliers: Tracey Brothers Ltd
2020-10-03   Reserved Specialists for Lot 1 Dental Cabinetry Installations and Lot 2 Clinical Skills Equipment Storage Systems... (University College Cork (UCC))
UCC is inviting expressions of interests for reserved specialists for dental cabinetry and clinical skills storage systems. The project consists of the construction of a new circa 9 480 m, Dental education and research building. The building will be primarily used as a dental school with ancillary education, research and innovation facilities including a central sterile services department, roof top plant enclosure and support service areas. Lot 1: Comprises installation of Dental Cabinetry comprising … View the procurement »
2020-07-31   Supply, Installation and Commissioning of 3D Studio/Workshop Equipment for Technological University Dublin (Technological University Dublin (TU Dublin))
3D studio/Workshop equipment to be supplied, installed and commissioned at TU Dublin Grangegorman in the East Quad building in Oct 2020 (indicative timeline). The School of Creative Arts is in the process of relocating from their current bases to the East Quad building in Grangegorman. As part of this move, new equipment is required to enhance and improve design and fabrication capacity and capabilities at the School of Creative Arts 3D Studios and Create Lab. View the procurement »
Mentioned suppliers: Central Technology Supplies Ltd FGIR Machinery Ltd Ronayne Hire and Hardware
2020-06-16   Building and Carpentry Services (COPE Foundation)
Building and carpentry services for cope foundation. View the procurement »
Mentioned suppliers: SouthCoast Homes & Construction
2020-06-05   Establishment of a Multi-supplier Framework in Two No Lots for Works Contractors for Small and Minor Works Projects (University College Cork (UCC))
UCC invites responses from suitably qualified works contractors for the provision of works in two number individual lots as follows: • Lot 1: EUR 5 000-EUR 250 000 exclusive of VAT for Small Works; • Lot 2: EUR 250 000-EUR 1 450 000 exclusive of VAT for Minor Works. The projects will vary in costs, complexity and programme duration. Tenderers are permitted to apply for one lot only. This competition is to establish a multi supplier framework with a maximum of six tenderers for each lot (‘Framework’) to … View the procurement »
Mentioned suppliers: Profix Maintenance Services Ltd Summerhill Construction Ltd
2020-06-03   Multi Supplier Framework Agreement for Unplanned Building Maintenance Services (Bus Eireann/Irish Bus)
Bus Éireann proposes establishing a new framework agreement for the provision of unplanned building maintenance services to a number of sites, accommodation units and facilities located throughout the Republic of Ireland for a four (4) year period. Bus Éireann has a requirement for the following eight service disciplines on an on-demand basis: • building maintenance works, • mechanical and electrical services, • painting and decorating, • GAS services, • roofing specialist, • heating and ventilation … View the procurement »
2020-04-30   Supply of Storage Infrastructure and Professional Advice Regarding Efficient Storage Infrastructure Solutions,... (National Museum of Ireland)
NMI requires a specialist storage infrastructure supplier offering a wide range of storage solutions such as shelving, racking, cabinets, drawers and other options to meet its storage requirements. Due to the complex nature of the NMIs storage requirements, we require services from storage infrastructure providers to ensure cost-effective and readily-available solutions can be provided. View the procurement »
Mentioned suppliers: Storage Systems Ltd
2020-01-28   Establishment of a Multi-Party Framework Agreement for Building Maintenance Services at Maynooth University (Maynooth University)
Maynooth University wishes to establish a multi-operator framework agreement for the provision of building maintenance services on its campus. View the procurement »
2020-01-22   Multi Party Framework Agreement for the Provision of Energy Efficiency Retrofitting in Dublin City Council Housing... (Dublin City Council)
Dublin City Council (DCC) is seeking to establish a multi-party framework agreement for the procurement of works contractors for term maintenance and refurbishment work associated with the energy efficiency retrofit to Dublin City Councils housing units in the Dublin City Council Areas marked out as Lots 1 to 12. Tenderers can apply for inclusion in one, some, or all lots. Each lot is allocated 2 000 000 EUR for 2 years. It is envisaged that each lot will involve the allocation of an average of 40 houses … View the procurement »
Mentioned suppliers: Bayview Contracts Ltd Bluebuild Energy Ltd Complete Insulations & Energy Upgrades Limited Complete Insulations and Energy Upgrades Ltd Damien Ryan Contracts Ltd Derchil Ltd Energy Action Ltd Hometherm Insulation Ltd National Retrofit and Construction Services Ltd Retrofit Design Ltd Weslin Construction Weslin Construction Ltd Weslin Construction Ltd,
2019-12-11   Works Contractor for Cork University Dental School and Hospital at CSIP, Curraheen, Bishopstown, Co. Cork (University College Cork (UCC))
UCC is seeking expressions of interest from works contractors for Cork University Dental School and Hospital. The project consists of the construction of a new circa 8 975 m, dental education and research building. The building will be primarily used as a dental school with ancillary education, research and innovation facilities including a central sterile services department, roof top plant enclosure and support service areas. View the procurement »
2019-09-06   Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: A. the change of use of the Phase 1 sports and community building to a library and community building; B. refurbishment of the existing sports building to create a new library; C. the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-09-06   Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: (a) the change of use of the Phase 1 sports and community building to a library and community building; (b) refurbishment of the existing sports building to create a new library; (c) the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-09-02   GMIT Multi-Party Framework for Supply, Delivery and Installation of Bespoke Furniture in Capital Projects Fit-Out Areas (Galway Mayo Institute of Technology)
GMIT intends to establish a multi-party framework furniture for the supply, delivery and installation for GMIT capital projects with different design specification for new-build fit-out areas. The maximum duration of the framework agreement will be four (4) years subject to satisfactory annual review of performance. Please refer to the tender documents for more details. View the procurement »
Mentioned suppliers: Complete Business Interiors Ltd
2019-08-29   Mechanical, Electrical and Building Services Maintenance Panel for the GRETB (Galway Roscommon Education and Training Board)
The GRETB intends to establish multi-supplier framework agreements for professional specialist mechanical, electrical and building maintenance services across their property portfolio. The framework agreement will be divided into the following three (3) lots: — Lot 1: Mechanical Services, — Lot 2: Electrical Services; and — Lot 3: Building Maintenance Services. View the procurement »
Mentioned suppliers: ACM Roofing Teo C&N Heating Services Ltd Christopher Mullins Electrical Services Ltd Cosier Homes Ltd Dotoole Electrical DWS Facility Services. FES Fusion Engineering Services Ltd Finna Construction Ltd FVG Construction and Maintenance Ltd Kellman Developments Ltd Martin Fahy Heating and Plumbing Neylons Facility Management
2019-07-05   Reactive Repairs and Maintenance Works for Residential Properties Tender (Cluid Housing Association)
Clúid Housing are seeking to establish single party Framework Agreements for the provision of reactive repairs and maintenance works in 3 Lots to cover the full geographic area of the Republic of Ireland. View the procurement »
Mentioned suppliers: Bayview Contracts Ltd FVG Construction and Maintenance Ltd
2019-04-01   Multi Party Framework Agreement for replacement of Doors and Windows in Local Authority Housing with an Initial... (South Dublin County Council)
It is proposed to undertake the replacement of doors and windows in Social Housing Units in the South Dublin County Council administrative area. Some houses will require all windows and doors to be replaced, while other houses will only have some of the windows or doors replaced. South Dublin County Council intends to establish a Multi-Party framework using the restricted procedure on eTenders to invite expressions of interest for pre-qualification. Works will include, but are not limited to, the … View the procurement »
Mentioned suppliers: Bann Ltd Brian M Durkan and Co. Ltd
2019-02-25   Construction of 12 Houses and Ancillary Works at Bun Daire Estate, Kinnegad, Co. Westmeath, Ireland (Westmeath County Council)
Construction of 12 houses and ancillary works at Bun Daire estate, Kinnegad, Co. Westmeath, Ireland. View the procurement »
2019-02-25   Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM. The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise: Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the … View the procurement »
2019-01-30   Supply of Woodwork Class Materials (Dublin & Dun Laoghaire Education and Training Board)
Woodwork classroom materials for use by students and teachers in woodwork classes at second level schools and technical courses and apprenticeships being provided in further education institutes and training centres under the patronage of DDLETB. View the procurement »
Mentioned suppliers: Strahan Timber
2019-01-15   Oweninny Visitor Centre (Bord Na Mona)
Summary of services for fit out pre-qualification request for tender for the manufacture, provision and installation of visitor centre fit out including welcome reception, cloaks, café including kitchen servery and permanent exhibition works at Oweninny Visitor Centre comprising joinery, metalwork, kitchen equipment, specialist paint and decorative finishes, audio visual hardware and graphics. Insurances: The successful tenderer shall be required to hold for the term of the services contract the … View the procurement »
2018-11-30   Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas. The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in … View the procurement »
2018-08-11   Phase II Works (The Ballinglen Arts Foundation)
Supply and fit of floor finishes (polished concrete), supply and fit passenger lift, Supply and fit of air-to-water heading system, together with other finishes including second fix joinery, painting and decorating and external landscaping works. View the procurement »
2018-06-20   ESS024C-DIT-Wood Manufacturing and Finishing Equipment (Education Procurement Service (EPS))
Lot 1: — surface planer 2 — thicknesser 2 — chisle 4 — round end tenorer 1 — speed sander 1 — veneer guillotine 1 — up cut saw 1 — band re-saw 1 Lot 2: — panel saw 1 — single end teneror 1 — spindle moulder 5 Lot 3: — CNC router 1 View the procurement »
Mentioned suppliers: High Tech Machinery Ltd
2018-02-20   OPW Measured Term Maintenance Contract — Dublin (City & County) (Office of Public Works (OPW))
OPW measured term maintenance contract — Dublin (City & County). View the procurement »
Mentioned suppliers: PJ Hegarty UC
2018-02-01   Building Maintenance CME Locations (Iarnrod Eireann-Irish Rail)
Iarnród Éireann - Irish Rail's Chief Mechanical Engineer's department "CME" has a requirement for Building maintenance services at various workshops in Ireland. The work includes but is not limited to carpentry, small building works, fencing, plumbing painting etc. View the procurement »
Mentioned suppliers: Total Highway Maintenance Ltd
2018-01-31   Testing, maintenance, replacement and support services for Powered Gates, Shutters, Doors and Barriers (Iarnrod Eireann-Irish Rail)
Note: This is 1 of 2 notices that will replace the now cancelled OJEU Notice 2017/S 202-416847 published on 20.10.2017 (Ref: 6966 - Maintenance, repairs and replacement works on existing specialist systems). Iarnród Éireann requires the services of a suitably qualified contractor to enter into a single party contract to undertake nationwide maintenance, repairs and replacement works on existing powered gates, shutters, doors and barriers. The proposed duration of the contract is 3 years with the option … View the procurement »
Mentioned suppliers: Desco Fingal Engineering Ltd
2017-12-15   Redevelopment of Leopardstown Racecourse (Horse Racing Ireland (HRI))
Leopardstown Club Ltd wishes to appoint a contractor for the redevelopment of the following items at Leopardstown Racecourse, Foxrock, Dublin: — Racing hall & street area — Level 0 — Grandstand, — Museum bar and toilet block — Level 1 — Grandstand, — Toilet blocks & terrace – Level 2 — Grandstand, — Window replacement – Level 3 — Grandstand, — Conversion of former Saddling stalls, — Children's play area, — Prize winners podium, — New Saddling stalls and PreParade ring, — New weighroom building, — New … View the procurement »
Mentioned suppliers: Duggan Brothers Contractors Ltd
2017-11-27   City NorthWest Quarter Regeneration (CNWQR), Phase2A, Construction of 47 Dwellings, consisting of 11 nr. 3 storey &... (Cork City Council)
Housing development at: City North West Quarter Regeneration (CNWQR), Phase2A. Comprising of the Construction of 47 Dwellings, in which there are 11 nr. 3 storey houses, 21 nr. 2 storey houses and 15 nr. apartments in 5 blocks, with associated site works, landscaped park area and road upgrading. View the procurement »
Mentioned suppliers: Murnane & O'Shea Limited
2017-10-27   Multi Party Framework for the Provision of Unplanned Building Maintenance to Bus Eireann (Bus Eireann/Irish Bus)
The Contracting Authority proposes concluding a Framework Agreement for the provision of unplanned building maintenance services to a number of sites, accommodation units and facilities located throughout the Republic of Ireland Bus Éireann has a requirement for the following six service disciplines on an on-demand basis: Lot 1. Routine building modifications and maintenance Lot 2. Electrical services, supply, installation and maintenance Lot 3. Carpentry and joinery services Lot 4. Building heating and … View the procurement »
2017-10-18   Maintenance, repairs and replacement works on existing specialist systems (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing Specialist systems. The requirements under this contract will include; planned preventative maintenance, unplanned repair works and certificate submissions to IE Share point document library. The current agreement for these services will expire in February 2018. Iarnród Éireann wish to enter into a single party agreement for; — the supply of Specialist Systems and … View the procurement »
2017-08-02   Provision of Building Maintenance Services Carpentry Services & General Maintenance to the University of Limerick (University of Limerick)
The selected Contractor will provide a general building maintenance service for University property in accordance with the schedule of accommodation below. The service will include the maintenance of the building fabric, furniture, fittings and decoration, as directed by the Buildings & Estates Department. The maintenance of mechanical and electrical services will be carried out by other contractors. However, it will be necessary to carry out works in conjunction and liaison with these other contractors, … View the procurement »
Mentioned suppliers: Lenmac Services
2017-07-19   Access Control and Security Systems (University College Dublin (UCD))
The objective of this request for proposals is to form a multi-party framework for UCD of suitably qualified tenderers to design and supply open protocol fully-integrated access control and security systems as outlined in the Technical Specification. It is UCD's intention to procure an open protocol access control solution that can co-exist with the existing systems on campus and allow for integration of future access control and security systems. The initial contract will include a pilot project for … View the procurement »
2017-06-30   Multi-Supplier Loose Furniture Framework Agreement (The University of Dublin Trinity College)
The University of Dublin, Trinity College plans to establish a Multi-supplier framework for Supply, delivery and installation of Loose Furniture to fulfill our furniture requirement. These suppliers shall be capable of providing a broad range of goods under the category of loose furniture. These goods will be procured at various intervals during the academic year by our various departments on campus. Loose furniture may also be procured by departments at our sites adjacent to our city center campus & at … View the procurement »
Mentioned suppliers: Axis Group Ltd Codex Limited Joseph Flanigan & Son Ltd Knightsbridge Furniture Productions Ltd Matrix Furniture
2017-05-28   Facilities Management Services (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IE) operates Rosslare Euro port, located in County Wexford. The site includes a terminal building for passengers, RORO facilities and extensive passenger vehicle and lorry parking facilities. IE are procuring the following services: Carpentry services; Electrical services; Mechanical engineering services; Painting services. View the procurement »
Mentioned suppliers: IMAC Facilities Management Ireland Ltd Irish Sea Contractors
2017-04-26   Electrical re-wire of Coolmine Community School (Coolmine Community School (Clonsilla))
Electrical re-wire of Coolmine community school and associated builders works. View the procurement »
2017-04-11   Remedial works to the external timber doors and windows at the EU Commission buildings in Dunsany, County Meath, Ireland (European Commission, Directorate-General for Health and Food Safety)
The tasks covered by the contract are the repair/replacement of elements of the windows and external doors that are allowing water ingress or draughts into the offices and the crèche building. View the procurement »
Mentioned suppliers: J.M. Stenson Construction Limited J.M. Stenson Construction Ltd
2017-03-27   Installation of Vertical Sorting Frames (An Post)
An Post are seeking installation services for Assembly of Flat Pack VSF Sorting Benches and other operational furniture used at An Post company offices as part of our manual sorting operations. The ideal company will provide a team (or teams) as required that will provide these services at various offices throughout the Republic of Ireland as each office comes online for its ‘operational re-design’. The contractor will need to operate to high safety and health standards, be able to assemble our furniture … View the procurement »
Mentioned suppliers: IO Systems Ltd
2017-01-06   Multi Party Framework Agreement for Galway County Council Housing Unit (Galway County Council)
Multi Party Framework Agreement for House Construction, Maintenance, Retrofit and Refurbishment Contracts and associated minor works. View the procurement »
2016-12-22   Multi Party Framework Agreement for the Provision of Energy Efficiency Retrofitting in Dublin City Housing Stock (Dublin City Council)
Energy Efficiency Retrofitting will be carried out Dublin City Council owned residential properties. The tender comprises of 5 Lots based on Dublin City Council Administrative Areas. Subject to to there being sufficient responses it is envisaged that up to 10 operators may be appointed for each of the 5 frameworks. Tenderers can apply for inclusion in one, some, or all lots. For further information please refer to tender documentation available to download on www.etenders.gov.ie RFT ID 112562. View the procurement »
Mentioned suppliers: Anzco Ltd Breffni Insulation Ltd Derchil Ltd Energy Action Ltd Retrofit Design Ltd
2016-10-14   Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Specialist Joinery Works Package (Curragh Racecourse Ltd)
The Curragh Racecourse has a number of hospitality areas, based on a tiered system increasing in specification as you ascend through the building from the café bar on the first floor to elite members only and race day only spaces. These are unified with a common language of materiality that ensures a seamless coordination between spaces for an overall continuity of concept for a contemporary international sporting venue. Ground Floor Hospitality Entrance: The Specialist Totes & counters within the Great … View the procurement »
Mentioned suppliers: Glenn Wood Tullamore
2016-10-14   Construction of 31 apartments in St. John's Lane, Dublin 8 (Focus Housing Association)
New 6 floor over basement 31 unit residential development at Johns Lane West, Dublin 8. The residential development will have a BER A3 rating, approximate gross internal floor area of 2 700 m and GSA of approximately 4 300 m View the procurement »
2016-10-14   Construction of 31 apartments in St. John's Lane, Dublin 8 (Focus Housing Association)
New 6 floor over basement 31 unit residential development at Johns Lane West, Dublin 8. The residential development will have a BER A3 rating, approximate gross internal floor area of 2 700 m and GSA of approximately 4 300 m View the procurement »
2016-08-05   Procurement of Works Contractor for UCC Student Hub at University College Cork (University College Cork (UCC))
The development will consist of the construction of a 6 storey Student Hub Building within the university campus adjoining College Road and Gaol Walk, Cork. The building will be used to provide student and administrative services and flexible learning spaces. The gross floor space will be 3 991 m .The proposed works will involve demolitions, alterations and extensions to the existing Windle Building, the removal of some existing car parking spaces and the provision of new hard and soft landscaping and lighting. View the procurement »
Mentioned suppliers: JJ Rhatigan & Co
2016-07-01   Remedial works to the external timber doors and windows at the EU Commission buildings in Dunsany, County Meath, Ireland (European Commission, Directorate-General for Health and Food Safety)
As the building is over 15 years old, the tasks covered by the contract are the repair/replacement of elements of the windows and external doors that are allowing water ingress or drafts into the offices and the crèche building. View the procurement »
2016-03-23   Establishment of a multi supplier framework in 2 no Lots for Works Contractors for Small and Minor Works Projects (University College Cork ( UCC ))
UCC invites responses from suitably qualified Work Contractors for the provision of the works as described in the attached RFT in 2 number individual Lots as follows: — Lot 1 Small Works Projects; — Lot 2 Minor Works Projects. Tenderers are permitted to apply for 1 Lot only. This competition is to establish a multi supplier framework with a maximum of 6. Tenderers for each Lot (‘Framework’) to whom specific assignments may be awarded in due course based on the terms of a contract (‘Framework Agreement’), … View the procurement »
Mentioned suppliers: Murnane & O'Shea Ltd + rest of framework Summerhill Construction
2016-01-22   Design, Manufacture, Supply, Delivery and Installation of Furniture Package for Meath Co. Council (Meath County Council)
Tenders are invited for the Completion of the design to working drawings stage, the Supply and Installation of the components forming the Furniture Package, within the parameters set by the performance specification and drawings provided by the architect. The elements which constitute the contract work comprise any/all of the following, as applicable: — Supply, delivery and installation of furniture package; — Testing/certification; — Samples/mock ups. The successful tenderer will be required to carry … View the procurement »
Mentioned suppliers: Bushell Interiors Ltd