2023-08-30The Common, Lifford Multi-Use Park (Donegal County Council_1193)
Construction of approximately 720m of access road and shared footways/cycleways throughout a greenfield site including recreational pitch construction and associated Earthworks within a sloping site. Access will be constructed onto the existing N14 National Primary Road to accommodate the proposed development. The development will further consist of the following, Wastewater pumping station and associated pipe networks to service proposed developments. Storm-water drainage facilitating potential future …
View the procurement »
2023-07-07Provision of Sludge Removal Services (Dublin Bus / Bus Atha Cliath)
Dublin Bus require a service provider for the removal of sludge and hazardous waste from its fleet maintenance depots. This will involve the cleaning of interceptors and the disposal of waste oil, oil filters, batteries etc. The service will be required in eight Dublin locations. The contract will operate as a Single Party Framework Agreement and run for 36 Months with an option to extend for two further periods of twelve months. The advertised value of the contract was estimated for a five year period.
View the procurement »
2023-03-03Hazardous Waste Disposal Service (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of competent contractors for the provision of Hazardous Waste Disposal Services.
The requirement is split into Lots:
Lot 1 – Container collections by lorry (IBCs, barrels, etc.) also to include contaminated soil removal
Lot 2 – Tanker Truck services which covers:
• Aqueous solution services by tanker truck (coolant, waste oil, oily water from interceptors, tank cleanings) & 24 hour response
• Sewage services by tanker truck (biocycle units, septic tanks, train …
View the procurement »
2023-02-1323/001 - Constructed Wetlands for Wastewater Treatment (Uisce Éireann)
This Framework will facilitate the design and build of Constructed Wetlands Wastewater Treatment Plants (CW WwTPs) across Ireland, consisting of the following scope:
• Construction activities incl. site investigations, groundworks/earthworks, civil, M&E, testing and commissioning works;
• PSCS role;
• Project management, co-ordination and co-operation with PSDP and Consultant Designer/Employer’s Representative;
• Community liaison and communication.
It is intended to appoint 2 Contractors for the …
View the procurement »
2021-09-28Major Civil Engineering Works Contractor Frameworks (Clonburris Infrastructure Ltd)
Clonburris Infrastructure Ltd (The Contracting Authority) is seeking to establish a multi-party framework agreement for Major Civil Engineering Works Contractor Frameworks (Large Works Plus €2million)). The successful framework members will also provide M&E specialist works for wastewater pumping station(s), landscaping specialist works for strategic parks, Traffic signals specialist works, public lighting specialist works and playground specialist works and small building/park pods works
View the procurement »
2019-12-1619/223 — PQQ — Interreg Swell Wastewater Upgrades — Main Works Contract (Irish Water)
The Shared Waters Enhancement and Loughs Legacy (SWELL) project is supported by the European Union’s Interreg VA Programme, managed by the Special EU Programmes Body. The SWELL project’s aim is to improve the water quality, within the shared waters of Carlingford Lough and Lough Foyle. Through strategic catchment investigations and modelling, the SWELL project is planned to deliver optimised, sustainable capital upgrades to wastewater assets.
The works associated with this particular contract PQQ involve …
View the procurement » Mentioned suppliers:BSG Civil Engineering Ltd
2019-09-27Carrigaline Western Relief Road (Cork County Council)
Construction of a single 750 m carriageway road. The CWRR will run along the southern boundary of Nova Court residential estate, before crossing over the Owenboy River, by means of a 32 m reinfroced concrete river bridge. Current land-use within the CPO lands primarily comprises Greenfield lands; however residential properties and brownfield sites are located in the northern portion of the proposed CWRR route. Pedestrian and traffic lights will be placed at the north, south and central junctions to …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2019-08-01Removal of Sludge and Hazardous Waste (Dublin Bus/Bus Atha Cliath)
Dublin bus require a service provider for the removal of sludge and hazardous waste from its fleet maintenance depots.
This will involve the cleaning of interceptors and the disposal of waste oil, oil filters, batteries, etc. The service will be required in eight Dublin locations.
The contract will operate as a single party framework agreement and run for 36 months with an option to extend for 2 further periods of 12 months.
The advertised value of the contract was estimated for a 5-year period.
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-02-15Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document.
View the procurement »
2018-11-07Greater Dublin Drainage Project – Wastewater Treatment Plant and Abbotstown Pumping Station DBO Contract (Irish Water)
The WwTP and Abbotstown Pumping Station are the subject of this competition and will be constructed utilising a design, build and operate contract. Within the WwTP site, a second pumping station is required to lift the incoming North Fringe Sewer (NFS) intercepting pipeline to the inlet works. Scope of works for this competition — Detailed design and construction and Operation of a WwTP with an initial capacity of 500 000 PE to treat a Dry Weather Flow (DWF) of 112 500 m/day and a total sludge tonnage of …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Marine Outfall DB Contract (Irish Water)
Scope of Works includes for the design, build, testing and commissioning of the following•Approximately 2 km length of 2 000 mm internal diameter outfall pipeline, installed using tunneling methods and passing beneath Baldoyle Bay to Velvet Strand:
— approximately 4 km length of 2 000 mm internal diameter outfall pipeline, installed using dredging methods from Velvet Strand to approximately 1 km North East of Irelands Eye,
— outfall diffuser,
— dredge crossing/protection works of existing fibre optic …
View the procurement »
2018-07-20Ringsend WwTP — Phosphorus Fixation Contract (Irish Water)
The Ringsend WwTP treats most of the wastewater arising in the Greater Dublin Area. Irish Water is currently planning an upgrade to the Ringsend Treatment Plant based on the application of aerobic granular sludge technology (Nereda®) which will provide for nutrient removal, including Enhanced Biological Phosphorus Removal (EBPR). The introduction of aerobic granular sludge and EBNR will be carried out in phased upgrades of the Ringsend plant, with the aim (inter alia) of reducing the Phosphorus (P) …
View the procurement » Mentioned suppliers:Murphy International Ltd
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Ringsend WwTP Retrofit Contract Stage 1 (Irish Water)
Ringsend Wastewater Treatment Plant (WwTP) treats most of the wastewater arising in the Greater Dublin Area. Irish Water is inviting tenders for a contract which will comprise the upgrading and retrofitting of between 8 and 11 of the upper deck tanks, and an aerobic granular sludge (AGS) biological treatment process (the Works) for which the Contracting Entity has already procured the proprietary Nereda® process.
Please refer to the PQQ for further details.
View the procurement »
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd
2016-06-17Cork Lower Harbour Main Drainage Project, Sewerage Network Contract D — Cobh (Irish Water)
Irish Water proposes to undertake the development of a new and upgraded collection network and transfer system in Cobh as part of the Cork Lower Harbour Drainage Project. This is necessary to ensure compliance Irish National Standards and Regulations relating to transfer and storage of urban waste water. General project information is contained on the website: www.water.ie/corklowerharbour
View the procurement »
2016-06-03Upper Liffey Valley Regional Sewerage Scheme — Phase 3 — Contract 2B — Networks (Irish Water)
The Works comprise the design and construction of infrastructure including the associated testing, commissioning and proving of the installed works comprising of:
— New and upgraded gravity sewers with varying diameters along public roads, and private and public lands for a total distance of approximately 9,4 km;
— New foul sewer rising mains with varying diameters from along public roads, and private and public lands for a total distance of approximately 8,6 km;
— Upgrade of Monread and Clane Pumping …
View the procurement » Mentioned suppliers:Coffey Construction (I) Ltd
2016-03-18Upper Liffey Valley Regional Sewerage Scheme Contract 2A Networks (Ervia)
Irish Water plan to undertake the construction of a new sewerage collection
network from Kilbelin in Newbridge to Osberstown WwTP including gravity
sewers, 3 No new pumping stations, 3 No new storm tanks and rising mains. The
project will convey flows from Newbridge, reducing storm water overflows to the
River Liffey, to Osberstown WwTP.
View the procurement » Mentioned suppliers:Roadbridge Ltd
2016-02-24Dunlavin WwTW and Satellite Plants — Operation and Maintenance Contract (Ervia)
This scheme involves provision of services to areas in West Wicklow. It comprises
4 No wastewater treatment facilities, 2 No pump stations and associated
foul/combined waste water collection network. A drawing showing the location of
the proposed works is included in Appendix 3.
Scope of Works.
The services to be provided by the Contractor include but are not limited to the
following:
— Design-Build: Enabling works at Knockannana, Kiltegan and Rathdangan to
facilitate operation (instrumentation and …
View the procurement »
2016-02-23Blanchardstown Regional Drainage Scheme (BRDS) 9C Sewer Duplication and Storage (Ervia)
— Approximately 3.2 km of pipeline (diameters ranging from approximately
1 500 mm to 1 800 mm) installed using trenchless techniques
— Underground storage tanks with an approximate total capacity of 30 000 m³ to cater for stormwater flows and flow balancing
— New Pump Station to lift flows (approximately 350l/s) from the proposed sewer to the existing sewer
— Stormwater return pumps to return flows from the storage tanks to the existing
9C Sewer (approximately 320/ls)
— Diversion of the existing live 1 …
View the procurement »
2015-12-11Inniscarra Sludge Upgrade Contract (Ervia)
Provision of sludge thickening and dewatering facilities and upgrade of existing sludge treatment facilities at Inniscarra Water Treatment Plant, and the operation and maintenance of only the sludge treatment facilities for 1 year with the option to extend this to 2 years.
View the procurement » Mentioned suppliers:Glan Agua Ltd
2015-09-04Enniscorthy Sewerage Scheme Phase 3: Contract 1 — Wastewater Treatment Plant Upgrade (Ervia)
Irish Water plan to undertake the following works:
— Refurbishment/Upgrade/Expansion of the existing Enniscorthy Wastewater Treatment Plant (WwTP).
— Refurbishment/Upgrade of the existing infrastructure at St Johns Pumping Station and Promenade Pumping Station.
— Provision of storm-water handling facilities.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Response/Ward and Burke JV
2015-04-28Belmullet DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the construction of a new wastewater treatment plant (2,500 PE) and new marine sea outfall together with modifications and upgrading of the existing wastewater collection system including the construction of two new pumping stations and associated rising mains.
Contract to include for the operation and maintenance of the the works for a period of 2 years post construction.
View the procurement »
2015-04-22Tubbercurry, Grange, Strandhill and Ballinafad Wastewater Treatment Plant Bundle DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the upgrade of the existing Tubbercurry, Grange, Strandhill and Ballinafad wastewater treatment plants (WwTP) and the Strandhill Pumping Station. Other works include the construction of a new combined sewer overflow (CSO) diversion and outfall discharge pipelines in Tubbercurry and associated ancillary works. There will also be a 2 year operational period and it is intended that the works will be implemented under a Design, Build and Operate (“DBO”) Contract.
View the procurement » Mentioned suppliers:Coffey Northumbrian Ltd
2014-10-29Dublin City Water Supply Scheme — Ballymore Eustace Water Treatment Plant — Sludge Treatment — M&E Contract for Irish Water (Ervia)
Irish Water is undertaking the provision of a new sludge treatment facility for the Ballymore Eustace Water Treatment Plant, to cater for the increase in capacity of the upgraded water treatment plant. The Ballymore Eustace plant is the largest Water Treatment Plant in Ireland, and requires Works to provide additional sustainable sludge treatment capacity to meet medium and long term water demands.
Please refer to the Pre-Qualification Questionnaire for full scope.
View the procurement »
2014-05-3014/044 - Cork Lower Harbour Main Drainage Project Network Contract for Irish Water (Bord Gais Eireann)
Irish Water proposes to undertake the development of new network collection and transfer systems in the towns of Cobh, Passage West, Monkstown, Carrigaline and Ringaskiddy in the Cork Lower Harbour area. This is necessary to ensure compliance Irish National Standards and Regulations relating to transfer and storage of urban wastewater. It is intended to divide the Network Contract into Lots.
General project information is contained on the public consultation website
www.corklh.com
View the procurement »
2013-12-1013/113 - The Provision of Major Process and MEICA Works (Incorporating Associated Civil Works) to Irish Water (Bord Gais Eireann)
Irish Water is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Major Process and MEICA Works (Incorporating Associated Civil Works) to support the provision of Water Services (water and wastewater) Capital Investment. It is envisaged that these Major Process and MEICA Works will be carried out in a planned manner where work packages are identified in
advance of each call off.
The works will be sub-divided into two …
View the procurement »
2013-10-2413/101 - Provision of Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to Irish Water (Bord Gais Eireann)
Irish Water wants to establish a multi-supplier framework agreement for the provision of all required works and services associated with Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to support the provision of water services capital investment. It
is envisaged that these Minor MEICA Works will be carried out in a planned manner where work packages are identified in advance of each call off. The works will be sub-divided into five separate lots detailed below.
Lot 1: …
View the procurement »
2013-10-01Enniscorthy Sewerage Scheme Phase 3 – Contract 1: Wastewater treatment plant Upgrade – DBO contract (Wexford County Council)
General Description
Enniscorthy Sewerage Scheme Phase 3 Contract 1: WWTP Upgrade DBO Contract (which is covered by these Pre- qualification documents) involves the following:
— Refurbishment, upgrade, expansion and construction on a Design Build and Operate basis, of the existing Enniscorthy WWTP.
— Refurbishment and taking in charge of the existing infrastructure at St Johns Pumping Station, Promenade Pumping Station and the respective rising/gravity mains to the Enniscorthy WWTP.
Design Build Works
— …
View the procurement »
2013-10-01Enniscorthy Sewerage Scheme Phase 3 – Contract 1: Wastewater Treatment Plant Upgrade (Wexford County Council)
General Description:
Enniscorthy Sewerage Scheme Phase 3 Contract 1: WWTP Upgrade DBO Contract (which is covered by these Pre-qualification documents) involves the following:
— Refurbishment, upgrade, expansion and construction on a Design Build and Operate basis, of the existing Enniscorthy WWTP.
— Refurbishment and taking in charge of the existing infrastructure at St Johns Pumping Station, Promenade Pumping Station and the respective rising/gravity mains to the Enniscorthy WWTP.
Design Build Works:
— …
View the procurement »
2012-12-21Upper Liffey Valley Regional Sewerage Scheme - Contract No 1 - Osberstown WWTP Upgrade (Kildare County Council)
The contract consists of the expansion and upgrade of the
existing Osberstown waste water and sludge treatment
facility from a population equivalent of 80 000 to 130 000
while maintaining the existing operations and treatment
standards.
The Contracting Authority has determined their
requirements in respect of the treatment process and
general site layout. The Contractor will be required to
assume design responsibility for the Contracting Authority's
selected solution, complete the design, and then …
View the procurement »