14/024 - Cork Lower Harbour Main Drainage Project, Wastewater Treatment Plant Design, Build and Operate Contract for Irish Water
Bord Gais Eireann
Irish Water are undertaking the Cork Lower Harbour Main Drainage Project to
provide wastewater treatment for the catchment area which includes the towns of
Cobh, Passage West, Monkstown, Ringaskiddy, and Carrigaline and adjoining
areas. The wastewater treatment plant will be constructed on a greenfield site
near Shanbally, Co. Cork. General project information is contained on the public
consultation website www.corklh.com
The time limit for receipt of tenders was 2014-04-30. The procurement was published on 2014-03-28.
Who? What?- โข Construction work for pipelines, communication and power lines โบ Construction work for water and sewage pipelines
- โข Construction works for sewage treatment plants, purification plants and refuse incineration plants โบ Sewage-treatment plant construction work
- โข Sewer construction work โบ Sewage work โบ Sewage pumping stations construction work
- โข Sewerage management services โบ Operation of a sewage plant
- โข รire/Ireland
Procurement history
| Date | Document |
|---|---|
| 2014-03-28 | Contract notice |
Contract notice (2014-03-28)
Object
Scope of the procurement
Title: Sewage-treatment plant construction work
Quantity or scope:
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Sewage-treatment plant construction work ๐ฆ
Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
Contracting authority
Identity
Country: Ireland ๐ฎ๐ช
Awarding authority type: Utilities entity
Awarding authority name: Bord Gรกis รireann
Postal address: Gasworks Road
Postal town: Cork
Contact
Internet address: http://www.bordgais.ie ๐
E-mail: rahern@bge.ie ๐ง
Phone: +353 214239030 ๐
Reference
Dates
Date dispatched: 2014-03-28 ๐
Submission deadline: 2014-04-30 ๐
Publication date: 2014-04-02 ๐
Identifiers
Notice number: 2014/S 065-111653
OJ-S issue: 65
Additional information
Object
Scope of the procurement
Short description:
Quantity or scope:
Reference number: 14/024
Legal, economic, financial and technical information
Conditions for participation
Suitability to pursue the professional activity:
Deposits and guarantees required: As per contract documents
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them: As per contract documents
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
Procedure
Languages
Language: English ๐ฃ๏ธ
Other languages: Gaelige
Contracting authority
Contact
Contact point: Shared Services Procurement Department
The Shared Services Procurement Manager
Complementary information
Review body
Name: The High Court
Postal address: High Court Central Office, Four Courts, Inns Quay
Postal town: Dublin
Postal code: 1
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie ๐ง
Phone: +353 18886000 ๐
Internet address: http://www.courts.ie ๐
Fax: +353 18886125 ๐
Information about review deadlines:
Object
Scope of the procurement
Title: Sewage-treatment plant construction work
Quantity or scope:
Design Build WorksThe Wastewater Treatment Plant Contract consists of the design, construction and commissioning and testing of a new wastewater treatment plant on a greenfield site with an ultimate capacity of 80,000 PE, upgrade of Church Road Pumping Station (PS), mechanical and electrical installation at the Monkstown PS, pumping station at Shanbally, gravity sewers and rising mains and other associated works of a similar nature.The works will be phased to align with the connection of flows and population growth. The Contractor will connect flows from Carrigaline and Shanbally under the contract. Remaining flows will be connected as the seperate network contracts complete. Full details of the phasing will be detailed in the Invitation To Tender (ITT).Operation and Maintenance WorksThe operation and maintenance Contract shall be carried out in accordance with Performance Management System (PMS) as published by the Water Services Training Group. The operation and maintenance will include the operation and maintenance of the wastewater treatment plant and may include the operation of outlying pumping stations at Church Road, Carrigaline and/or Monkstown and any associated maintenance. The duration of the operate phase of the contract is not yet determined but it is envisaged that it will be of the order of 7 to 20 years with options to opt out at defined periods and options to extend the period. Full details will be provided in the ITT.Independent testing of the main influent, effluent and sludge parameters, odour, noise and other parameters as detailed in the ITT documents will be required as part of the Design, Build and Operate (DBO) Contract.
Show more
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Sewage-treatment plant construction work ๐ฆ
Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
Contracting authority
Identity
Country: Ireland ๐ฎ๐ช
Awarding authority type: Utilities entity
Awarding authority name: Bord Gรกis รireann
Postal address: Gasworks Road
Postal town: Cork
Contact
Internet address: http://www.bordgais.ie ๐
E-mail: rahern@bge.ie ๐ง
Phone: +353 214239030 ๐
Reference
Dates
Date dispatched: 2014-03-28 ๐
Submission deadline: 2014-04-30 ๐
Publication date: 2014-04-02 ๐
Identifiers
Notice number: 2014/S 065-111653
OJ-S issue: 65
Additional information
A pre-qualification questionnaire will be issued to all candidates who forward an Expression of interest and send via email for the attention of The Shared Services Procurement Manager to rahern@bge.ie
The questionnaire will cover the financial, economic and technical capacity of the candidates. The responses will be used to assist in drawing up a tender list. This process may also include interviews with candidates. The contracting entity will not be responsible for any costs, charges or expenses incurred by candidates or tenderers relating to this contract award procedure. The questionnaire must be completed and returned to the address in I.1. above not later than 17.00hrs Wednesday 30th April 2014.
PLEASE DO NOT REGISTER ON ETENDERS AS YOU WILL NOT RECEIVE ANY DOCUMENTATION.
Show more
Object
Scope of the procurement
Short description:
Irish Water are undertaking the Cork Lower Harbour Main Drainage Project to
provide wastewater treatment for the catchment area which includes the towns of
Cobh, Passage West, Monkstown, Ringaskiddy, and Carrigaline and adjoining
areas. The wastewater treatment plant will be constructed on a greenfield site
near Shanbally, Co. Cork. General project information is contained on the public
consultation website www.corklh.com
Design Build Works
The Wastewater Treatment Plant Contract consists of the design, construction and commissioning and testing of a new wastewater treatment plant on a greenfield site with an ultimate capacity of 80,000 PE, upgrade of Church Road Pumping Station (PS), mechanical and electrical installation at the Monkstown PS, pumping station at Shanbally, gravity sewers and rising mains and other associated works of a similar nature.
Show more
The works will be phased to align with the connection of flows and population growth. The Contractor will connect flows from Carrigaline and Shanbally under the contract. Remaining flows will be connected as the seperate network contracts complete. Full details of the phasing will be detailed in the Invitation To Tender (ITT).
Show more
Operation and Maintenance Works
The operation and maintenance Contract shall be carried out in accordance with Performance Management System (PMS) as published by the Water Services Training Group. The operation and maintenance will include the operation and maintenance of the wastewater treatment plant and may include the operation of outlying pumping stations at Church Road, Carrigaline and/or Monkstown and any associated maintenance. The duration of the operate phase of the contract is not yet determined but it is envisaged that it will be of the order of 7 to 20 years with options to opt out at defined periods and options to extend the period. Full details will be provided in the ITT.
Show more
Independent testing of the main influent, effluent and sludge parameters, odour, noise and other parameters as detailed in the ITT documents will be required as part of the Design, Build and Operate (DBO) Contract.
Legal, economic, financial and technical information
Conditions for participation
Suitability to pursue the professional activity:
If any of the conditions set out in Regulation 53(1) of The European Communities (Award of Public Authorities Contracts) Regulations apply to the applicant, the applicant will be excluded from the competition.
Economic and financial standing:
A full description of candidates' required economic and financial capacity will be set out in the Pre Qualification Questionnaire.
Technical and professional ability:
A full description of candidates' required technical capacity will be set out in the Pre Qualification Questionnaire.
Contract execution
Deposits and guarantees required: As per contract documents
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them: As per contract documents
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
A consortium/joint venture will not be required to convert into a specific legal form in order to submit a Pre-Qualification Submission, but may be required to do so prior to award of the contract. Irish Water may:
i. contract with the prime contractor only;
ii. contract with each member of the consortium/joint venture on the basis of joint and several liabilities;
iii. contract with one member of the consortium/joint venture as prime contractor to whom the other members willbe sub-contractors; or
iv. at its discretion, require the consortium/joint venture to enter into any other contracting arrangement.
Procedure
Languages
Language: English ๐ฃ๏ธ
Other languages: Gaelige
Contracting authority
Contact
Contact point: Shared Services Procurement Department
The Shared Services Procurement Manager
Complementary information
Review body
Name: The High Court
Postal address: High Court Central Office, Four Courts, Inns Quay
Postal town: Dublin
Postal code: 1
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie ๐ง
Phone: +353 18886000 ๐
Internet address: http://www.courts.ie ๐
Fax: +353 18886125 ๐
Information about review deadlines:
Interested parties are referred to Statutory Instrument 131 of 2010, European Communities (Award of Contracts by Utility Undertaking) (Review Procedures) Regulations 2010 (and in particular Regulation 7 and 10(2).
Source: OJS 2014/S 065-111653 (2014-03-28)