2026-02-23   Foynes to Limerick Road (including Adare Bypass) – Adare to Attyflin Construction Contract (Limerick City and County Council_103432)
Limerick City and County Council in partnership with Transport Infrastructure Ireland (TII) is seeking tenders for the Foynes to Limerick Road (including Adare Bypass) - Adare to Attyflin Construction Contract, which will be procured under the NEC4 Option C form of Contract. The Adare to Attyflin Construction Contract includes but is not limited to: - approximately 3.5km of new M21 motorway from Adare to Attyflin which will involve approximately 1.5km of offline works and approximately 2km of online … View the procurement »
2025-07-01   Contract for the Construction of the National Cricket Centre - Contract One (Sport Ireland)
Construction of the National Cricket Centre, Contract 1, which consists of the following elements: (1) Civil works including the Cricket Oval including the Wicket, 4,240 permanent seating bowl, bulk earthworks, boreholes and irrigation system, site infrastructure, utility services (2) Ancillary buildings comprising, Energy Centre (313m2), Maintenance building (536m2) and 2 WC blocks of 214m2 each (3) Landscaping works including grasscrete around the pitch hard standing to the concourse and soft … View the procurement »
2025-01-10   Contract for Building Works at Port Centre for Dublin Port Company (Dublin Port Company_411)
The work will include the appointment of a contractor to carry out: - Fire Cert and associated works. - DAC and associated works. - New alterations to the ground floor, reception, and mezzanine. - Essential repair works to the fifth floor to improve insulation and resolve water ingress issues. - Upgrade the fifth floor by removing and raising the existing roof, replacing the external façade with a new louvred façade allowing the floor plate to extend out to the perimeter - Upgrade building fabric and … View the procurement »
2024-07-10   Islandbridge Commemorative Bridge- Main Contractor (Office of Public Works (OPW))
It has been agreed with the Heritage properties to undertake works to the Commemorative bridge at Island Bridge, Dublin 8. The proposed pedestrian/cycle bridge comprises: • A new pedestrian and cycle bridge which will span the River Liffey and connect to an existing cycle way running along Chapelizod Road; • A formal entrance at Chapelizod Road; • An open plaza linking the entrance and bridge, to be located at the National Wat Memorial Gardens and at lands to north of River Liffey, Chapelizod Road, … View the procurement »
2020-05-15   Demolition and Enabling Works Package (Limerick Twenty Thirty Strategic Development DAC)
The opera Site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place. This demolition and enabling works package includes installation of hoarding, site clearance, temporary works, building demolition, surface water management, engagement with local utilities for water, gas and electricity while ensuring that both the conservation buildings on the site and the ecology of the site is protected. View the procurement »
2019-09-02   Dunkettle Interchange Upgrade Scheme Works (Transport Infrastructure Ireland (TII))
Transport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to: — the construction of a number of new structures (including over the railway), — new road links including all earthworks, — drainage and pavement, — signage and lining, — landscaping, — environmental mitigation, — culverts, — … View the procurement »
2019-06-27   Middle Pier Upgrade, Howth Fishery Harbour Centre (FHC), Howth, Co. Dublin (Department of Agriculture, Food and the Marine)
The Department of agriculture, food and the marine is proposing to extend the Middle Pier Quay in Howth Harbour to improve access, maintenance and berthing facilities. This will involve: — the construction of a ~134 m long quay wall at the western face of the pier and associated deck area, road access, hard standing and parking, — dredging works to -4 m Chart Datum at the proposed quay wall face, — the treatment and re-use of the dredge spoil within the structure/reclamation area, — land reclamation at … View the procurement »
2018-08-31   Multi-Party Framework Agreement for Design and Build Contractors to Deliver Residential Developments Through the Use... (Dublin City Council)
Establishment of multi-party framework agreement for design and build contractors to deliver residential developments (comprising apartments and/or houses) through the use of 2D panelised and/or 3D modular or volumetric construction methods at locations throughout the Republic of Ireland. Lot 1 — For projects with an estimated construction value less than 15 million EUR excl. VAT Lot 2 — For projects with an estimated construction value in excess of 15 million EUR excl. VAT View the procurement »
2018-07-19   Specialist office fit-out works for IDA Ireland at Three Park Place,Upper Hatch St, Dublin 2 (IDA Ireland)
The proposed works will comprise the fit-out of circa 5 600 m net (between the 3 and 8 Floors) in Three Park Place, Hatch Street, Dublin 2 (the "Premises") for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.The main building works (shell and core and CAT A works) are complete. The works are to be completed by the end of June 2019 to allow … View the procurement »
2018-02-23   Bridges Term Maintenance Contract Nº 3 (Transport Infrastructure Ireland (TII))
The works are split into 3 separate Lots to undertake routine maintenance of 1 753 single carriageway National Road Bridges in the Republic Of Ireland. The Lots are: 1. North West Bridges Term maintenance contract Nº 3 2. Munster Bridges Term maintenance contract Nº 3 3. Leinster Bridges Term maintenance contract Nº 3 The works contained in each Lot comprise of routine maintenance of bridges phased over 4 years including 2018 (Year 1), 2019 (Year 2), 2020 (Year 3) and 2021 (Year 4), and reactive … View the procurement »
2018-01-11   Design / build rapid build project [accelerated delivery] of 63 unit housing project at St Cuthberts, Clondalkin Dublin 22.24 (South Dublin County Council)
The project comprises 63 x 2-storey units of varying types as detailed in the tender information. Each tendering contractor, on a pass/fail basis to qualify as a tenderer, must be compliant with at least 2 of the following 3 criteria: 1. Has completed a housing contract of similar scope and complexity as St. Cuthbert’s Park. 2. Has completed a € 5 000 000.00 project to an accelerated construction program. 3. Has completed a project using a certified systemised building component comprising at least 10 % … View the procurement »
2017-12-13   Pearse Station Roof Project (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for renovation works to the existing roof at Pearse Railway Station, Dublin 2. Iarnród Éireann (IÉ), a subsidiary of Córas Iompair Éireann (CIÉ) — (a statutory body which provides bus and rail public transport for passengers and rail freight services) will shortly be issuing a tender on a design & build basis for the replacement of the existing supporting structure and roof covering to Pearse Railway Station, Westland Row, Dublin 2, Ireland. Pearse Station is a railway … View the procurement »
2017-04-28   Dunkettle Interchange Upgrade Scheme Works (Transport Infrastructure Ireland (TII))
Transport Infrastructure Ireland (TII), intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade Scheme, comprising the upgrade of the existing interchange to a largely free flow involving, including but not limited to, the construction of a number of new structures (including over the railway); new road links including all earthworks, drainage and pavement; signage and lining; landscaping; environmental mitigation; culverts; roundabouts; … View the procurement »
2016-06-24   16/030 — A Multi-Supplier Framework for the provision of Major Process, MEICA and DBO Works (Incorporating... (Irish Water)
Irish Water is requesting tenders to establish a multi-supplier framework for the provision of all required works and services associated with Major Process, MEICA and DBO Works (incorporating associated civil works) to support the delivery of the Irish Water's capital investment plan. It is envisaged that these works will be carried out in a planned manner where work packages are identified in advance of each call off. Irish Water intends to enter into a framework agreement up to a maximum of 15 … View the procurement »
2015-03-05   University of Limerick Student Residents Refurbishment (University of Limerick)
The University of Limerick and Plassey Campus Centre now wish to establish a Multiple Operator Framework Agreement for main contractors for the Refurbishment Programme for Student Residences at University of Limerick. The establishment of the Multiple Operator Framework Agreement for main contractors will be a single stage process and will be on the basis of the applications submitted in response to this Notice. It is anticipated that the a minimum of 5 and a maximum of 7 main contractors will be … View the procurement »