Transport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to:
โ the construction of a number of new structures (including over the railway),
โ new road links including all earthworks,
โ drainage and pavement,
โ signage and lining,
โ landscaping,
โ environmental mitigation,
โ culverts,
โ roundabouts,
โ pedestrian and cycle facilities, and
โ traffic management, all in close proximity to live traffic, the railway, Cork Harbour SPA and various large industrial facilities.
Deadline
The time limit for receipt of tenders was 2019-10-14.
The procurement was published on 2019-09-02.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title: Dunkettle Interchange Upgrade Scheme Works
TII222
Products/services: Motorway construction works๐ฆ
Short description:
โTransport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange...โ
Short description
Transport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to:
โ the construction of a number of new structures (including over the railway),
โ new road links including all earthworks,
โ drainage and pavement,
โ signage and lining,
โ landscaping,
โ environmental mitigation,
โ culverts,
โ roundabouts,
โ pedestrian and cycle facilities, and
โ traffic management, all in close proximity to live traffic, the railway, Cork Harbour SPA and various large industrial facilities.
Show more
Estimated value excluding VAT: EUR 120 000 000 ๐ฐ
This procurement (TII222) is for the Design and Construction of the Dunkettle Interchange Upgrade Scheme. The existing Dunkettle Interchange is located approximately 6 km to the east of Cork City, where the M8/N8 road from Dublin to Cork intersects with the N25 road from Waterford to Cork, via the existing interchange, just north of the Jack Lynch Tunnel.
The existing interchange comprises a signalised roundabout, which includes a free flow overpass for traffic travelling along the N25 from the east to Cork, in the west and vice versa. Traffic using the interchange other than for this movement must negotiate the existing circulatory carriageway (roundabout) which is controlled via traffic signals.
The works comprises the reconfiguration of the existing Dunkettle Interchange to a free flowing interchange in so far as practicable, i.e. an interchange whereby traffic movements are not conflicted by opposing traffic movements either by yielding or stopping at traffic signals, as is the case with the existing interchange. The Works includes the following elements of infrastructure:
โ a series of direct road links between the N8, the N25 and the N40 and links to the R623 Regional Road in Little Island and Burys Bridge in Dunkettle,
โ 1 grade separated junction arrangement at the existing N25 to the east of the existing Dunkettle Interchange,
โ 43 major structures of various forms including railway structures,
โ several culverts where the scheme crosses watercourses or intertidal areas,
โ utility diversions,
โ associated intelligent transportation systems (ITS) Provision and pedestrian and cyclist facilities. Significant traffic management will be required as the interchange will need to remain open to traffic during the Works. Various environmental mitigation is also required as per the planning consents,
โ any other associated works.
Further details available from the tender documents.
Show more Award criteria
Cost criterion (name): Price
Cost criterion (weighting): 100
Scope of the procurement
Estimated total value excluding VAT: EUR 120 000 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 72
Information about the limits on the number of candidates to be invited
Envisaged number of candidates: 5
Objective criteria for choosing the limited number of candidates:
โSee SAQ documents Section 3.4 that states the objective criteria for limiting the number of applicants.โ Description
Additional information:
โTenderers will need to register on the etenders government website to download the tender documents.โ
Legal, economic, financial and technical information Conditions for participation
List and brief description of conditions: See ESPD/selection stage documents.
Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2019-10-14
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tender must be valid until: 2021-05-12 ๐
Complementary information Additional information
โTII will be the contracting authority for this TII222 contract.
TII will not be liable for any participantโs costs arising in connection with participating...โ
TII will be the contracting authority for this TII222 contract.
TII will not be liable for any participantโs costs arising in connection with participating in the competition, irrespective of the outcome of the competition, or if the competition is cancelled or postponed.
โ TII have the right at any time and without notice to:
(i) terminate the competition (or part of it);
(ii) change the competitionโs basis or procedures;
(iii) procure the contract by other means,
(iv) negotiate with one or more parties at any time;
(v) reject any or all, of the applications/tenders;
(vi) not furnish a candidate or tenderer with additional information.
Or to do any combination of the foregoing or anything else deemed appropriate. In no instance will TII be required to give any reason for any alteration or termination of the process.
โ if any past or future contracts or other documents are summarised or described in this document, or in other information given to Candidates, the summary or description must not be taken as comprehensive, or as a substitute for reading the contract or other document itself when it becomes available,
โ award of contract will be subject to the approval of statutory bodies,
โ award of contract may be subject to successful interview,
โ interested parties are advised that TII are subject to the Freedom of Information Act 2014 (together with other legislation governing access to information). If a candidate/tenderer considers that any information supplied as part of this procurement procedure should not be disclosed because of its commercial sensitivity, confidentiality or otherwise, they must, when providing this information, clearly identify the specific information they do not wish to be disclosed and clearly specify the reasons for its sensitivity. Please note, it is not sufficient to include a statement of confidentiality encompassing all the information provided in the response.
The 120 000 000 EUR (excluding VAT) is an estimate only and is based on July 2019 prices. TII does not commit to any amount, any retainer and all projects are subject to approval by the appropriate authorities.
Show more Review body
Name: Central Office of the High Court
Postal address: Four Courts
Postal town: Dublin 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886511๐
E-mail: highcourtcentraloffice@courts.ie๐ง
Fax: +353 18886125 ๐
URL: http://www.courts.ie๐
Source: OJS 2019/S 171-416622 (2019-09-02)
Additional information (2019-09-25) Object Scope of the procurement
Short description:
โTransport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange...โ
Short description
Transport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to: the construction of a number of new structures (including over the railway), new road links including all earthworks, drainage and pavement, signage and lining; landscaping, environmental mitigation, culverts, roundabouts, pedestrian and cycle facilities and traffic management, all in close proximity to live traffic, the railway, Cork Harbour SPA and various large industrial facilities.
Complementary information Original notice reference
Notice number in the OJ S: 2019/S 171-416622
Changes Text to be corrected in the original notice
Section number: IV.2.2)
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Old value
Date: 2019-10-14 ๐
Time: 12:00
New value
Date: 2019-10-15 ๐
Time: 12:00
Source: OJS 2019/S 187-453714 (2019-09-25)
Additional information (2019-10-07) Object Scope of the procurement
Short description:
โTransport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange...โ
Short description
Transport Infrastructure Ireland (TII) intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to, the construction of a number of new structures (including over the railway); new road links including all earthworks; drainage and pavement; signage and lining; landscaping; environmental mitigation; culverts; roundabouts; pedestrian and cycle facilities; and traffic management, all in close proximity to live traffic, the railway, Cork Harbour SPA and various large industrial facilities.
Changes Text to be corrected in the original notice
Section number: IV.2.2)
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Old value
Date: 2019-10-15 ๐
Time: 12:00
New value
Date: 2019-10-25 ๐
Time: 12:00
Source: OJS 2019/S 196-475344 (2019-10-07)
Contract award notice (2020-12-21) Object Scope of the procurement
Short description:
โThis is an award notice.Transport Infrastructure Ireland (TII) procured a civil engineering construction contractor to design and construct the Dunkettle...โ
Short description
This is an award notice.Transport Infrastructure Ireland (TII) procured a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade scheme, comprising the upgrade of the existing interchange to a largely freeflow involving, including but not limited to, the construction of a number of new structures (including over the railway); new road links including all earthworks; drainage and pavement; signage and lining; landscaping; environmental mitigation; culverts; roundabouts; pedestrian and cycle facilities; and traffic management, all in close proximity to live traffic, the railway, Cork Harbour SPA and various large industrial facilities.
Show more
Total value of the procurement (excluding VAT): EUR 101 945 982 ๐ฐ
Description
Description of the procurement:
โAWARD Notice only. This procurement (TII222) is for the Design and Construction of the Dunkettle Interchange Upgrade Scheme. The existing Dunkettle...โ
Description of the procurement
AWARD Notice only. This procurement (TII222) is for the Design and Construction of the Dunkettle Interchange Upgrade Scheme. The existing Dunkettle Interchange is located approximately 6km to the east of Cork City, where the M8/N8 road from Dublin to Cork intersects with the N25 road from Waterford to Cork, via the existing interchange, just north of the Jack Lynch Tunnel.
The existing interchange comprises a signalised roundabout, which includes a free flow overpass for traffic travelling along the N25 from the east to Cork, in the west, and vice versa. Traffic using the interchange other than for this movement must negotiate the existing circulatory carriageway (roundabout) which is controlled via traffic signals.
The Works comprises the reconfiguration of the existing Dunkettle Interchange to a free flowing interchange in so far as practicable, i.e. an interchange whereby traffic movements are not conflicted by opposing traffic movements either by yielding or stopping at traffic signals, as is the case with the existing interchange. The Works includes the following elements of infrastructure:
โ a series of direct road links between the N8, the N25 and the N40 and links to the R623 Regional Road in Little Island and Burys Bridge in Dunkettle,
โ 1 grade separated junction arrangement at the existing N25 to the east of the existing Dunkettle Interchange,
โ 43 major structures of various forms including railway structures,
โ several culverts where the scheme crosses watercourses or intertidal areas,
โ utility Diversions,
โ associated intelligent transportation systems (ITS) Provision; and pedestrian and cyclist facilities. Significant traffic management will be required as the interchange will need to remain open to traffic during the Works. Various environmental mitigation is also required as per the planning consents,
โ any other associated works.
Show more
Additional information: Tenderer is now closed.
Procedure Administrative information
Previous publication concerning this procedure: 2019/S 171-416622
Award of contract
1๏ธโฃ
Contract Number: 1
Title: Dunkettle Interchange Upgrade Scheme Works
Date of conclusion of the contract: 2020-11-10 ๐
Information about tenders
Number of tenders received: 2
Number of tenders received by electronic means: 2
Name and address of the contractor
Name: John Sisk and Son (Holdings) Ltd
Postal address: Clondalkin
Postal town: Dublin 22
Country: Ireland ๐ฎ๐ช
Region: รire/Ireland๐๏ธ
The contractor is an SME
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: EUR 101 945 982 ๐ฐ