2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-08-29Realignment of the N26 at Cloongullane (Mayo County Council)
The project includes the realignment of 1,8 km of the N26 at Cloongullane, approximately 3,4 km north-west of Swinford, County Mayo.
The proposed realignment of the N26 at Cloongullane includes the following:
— 1,8 km of Type 2 Single Carriageway Road (predominantly offline),
— a new bridge crossing of the River Moy SAC (downstream of the existing N26 bridge),
— 2 new culverts over tributaries of the River Moy,
— local road realignments,
— accommodation works/farm accesses.
View the procurement » Mentioned suppliers:BAM Civil Ltd
2019-05-22N11 Parallel Service Road (Wicklow County Council)
Construction of a segregated service road on the southbound carraigeway of the N11 Parallel Service Road at Kilmacanoge between Junction 7 (Bray South) and Junction 8 (Kilmacanoge). The works will include carriageway widening into the central reserve by up to 3 m over a distance of 1,7 km, provision of 2 sign gantries, alterations to existing services, replacement of safety barrier and associated traffic management.
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-04-03Replacement of Studio Floors (Raidio Teilifis Eireann (RTE))
RTÉ invites tenders for the replacement of studio floors in 2 separate lots. Lot 1 is the studio 5 floor totalling 223 m and Lot 2 is the studio 4 floor totalling 626 m. The floors will be high-quality TV floors with a surface hardness, levelness and flatness suitable for modern TV studio requirements including ‘in shot’ camera tracking. Currently the Studio 5 works are programmed for August 2019 with the studio available for 3 weeks. Studio 4 works are planned for 2020 subject to internal RTÉ approval.
View the procurement » Mentioned suppliers:MVOHalloran Ltd
2019-03-04Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement » Mentioned suppliers:McGinty and O'Shea Ltd
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2019-02-15Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document.
View the procurement »
2019-01-23Framework for Office Fit Out and Associated Works (Raidio Teilifis Eireann (RTE))
RTE anticipate a requirement for office fit out contractors for furniture supply, painter/decorating, small scale carpentry and fitter and associated works. There exist parallel frameworks for electrical and small builders’ works. The main project work will be works carried out on the RTE Campus in Donnybrook, Dublin 4.
View the procurement »
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.
2018-10-03Maynooth University Refurbishment of Existing Arts Building (Maynooth University)
The Works Contractor contract defined as the Refurbishment of the existing Arts Building of 4 700 m accommodation which may be delivered over 2 phases. Phase 1 is circa 1 390 m which provides for reconfiguration of existing offices into modern teaching spaces and courtyard. Phase 2 is circa 3 310 m which provides reconfiguration of existing toilets, office space into modern teaching spaces. Works also include provision of new courtyard and works to existing mechanical and electrical systems.
View the procurement »
2018-09-21Maynooth University Academic Building New Construction (Maynooth University)
The Works Contractor contract defined as the Academic Building New Construction comprises the new construction of 10,554 m accommodation which may be delivered across a single or 2 phases. Phase 1 is circa 5,287 m which provides for teaching spaces predominantly on ground and first floors with offices, reading and support spaces on second and third floors. Enclosed plant space is located at fourth floor. The main objective of the competition is the Phase 1, with the option to proceed with Phase 2, …
View the procurement » Mentioned suppliers:JJ Rhatigan and Company
2018-08-22LIT Single Operator Framework for Coonagh Internal Fit-Out (Limerick Institute of Technology)
Single Operator Framework for selected works at its new campus located at Coonagh Cross Shopping Centre. The Framework works may include, but are not limited to:
— General Building Works,
— Extensions, Demolitions and Alterations to and of Existing Structures,
— Construction of New Buildings,
— Repair and Refurbishment of Existing Buildings,
— Mechanical and Electrical works through reserved specialist subcontractors,
— Minor Civil Engineering Works,
— Miscellaneous Maintenance Projects.
The works …
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »
2018-07-04New Centre for Radiation Oncology at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8,050 sqm in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:John Paul Construction
2018-06-29Construction of Clare County Library (Clare County Council)
The overall project will comprise construction of a new County Library on a brownfield site. The proposed project when completed will be attached to the existing Glór Theatre and consequently there will be significant works required at the interface of the two buildings including some demolition work. Applicants should note that the works will be carried out in a live environment and safe access to and full use of the Glór Theatre will be required for the duration of the works. The new building measuring …
View the procurement » Mentioned suppliers:L&M Keating Ltd
2018-04-12Local Area Term Maintenance and Refurbishment Works for Dublin City Council (Dublin City Council)
Dublin City Council administers the maintenance and refurbishment of the existing residential stock through the five local areas: Central Area, North Central Area, North West Area, South Central and South East Area. It is now intended to establish six (6) frameworks agreements for each of the 5 areas plus one city-wide area to carry out maintenance and refurbishment works under the terms of the Public Works Term Maintenance and Refurbishment Works Contract and under the direction of the Area Maintenance …
View the procurement »
2018-02-09Multiple Operator Framework Agreement for Minor Works (Dun Laoghaire Institute of Art Design & Technology)
Dun Laoghaire Institute of Art Design and Technology (IADT), together with the Institute of Technology Blanchardstown (ITB) and the Institute of Technology Tallaght (ITT) invites submissions from competent and reputable Contractors to become members of a Framework Agreement for Minor Works.
The works to be carried out under the Framework Agreement will comprise minor works projects including but not limited to:
— internal and external refurbishment works,
— painting and decorating,
— building fabric …
View the procurement »
2017-10-24Provision of Contracted Training Services to Kilkenny and Carlow Education and Training Board(KCETB) (Kilkenny and Carlow ETB)
KCETB invites tenders to the Request for Tender (RFT) from private training providers for the provision of the services as described in Appendix 3-Course Details. The services concerned will primarily be required at various locations in Kilkenny and Carlow but may occasionally be required at other further education and training centres or community settings in Kilkenny and Carlow. The services envisaged by KCETB over the duration of the contract are detailed in the nine (9) lots. Maximum number of …
View the procurement »
2017-10-02The Provision and Installation of Specialist Flooring (Including Repairs as Required) and Internal Wall Cladding (Beaumont Hospital)
Beaumont Hospital intends to establish a single party framework agreement for the provision and installation of specialist flooring and internal wall cladding works in Beaumont Hospital. Additionally, the framework agreement shall be utilised for the carrying out of repairs in respect of all flooring and specialist internal wall cladding in Beaumont Hospital. The works covered under this Framework Agreement are to be carried out throughout the Beaumont Hospital Campus. Areas will include, but are not …
View the procurement » Mentioned suppliers:Advance Flooring Limited
2017-08-21Multi Supplier Framework for the Provision of Groundwater, Drilling, Pump Testing and Remediation Works Associated... (Irish Water)
The Contracting Entity is tendering to establish a Multi-Supplier Framework for the provision of appropriately qualified and experienced individual groundwater drilling contractors to provide expert groundwater drilling services, to the standard specified under EPA Advice Note No 14. (Borehole Construction and Wellhead Protection). The service provider will supply boreholes up to 300 mm diameter, well installation, pump testing, camera surveys, and well rehabilitation works associated with water supply …
View the procurement »
2017-08-18Engineering Design Services for New Metro North (National Transport Authority)
The NTA and TII (see Section VI.3. — Additional Information) seek to appoint a design team to progress the New Metro North Project from the Concept Design stage to construction, inclusive of the obtaining of planning and environmental consents, the tendering of the scheme's construction and (provisional) construction supervision.
NMN is a metro rail project, with an approximate length of about 19 kms, mainly in tunnel, and with (approximately) 14 stations, located in Dublin, Ireland. It will provide a …
View the procurement » Mentioned suppliers:Jacobs Engineering Ireland Limited and...
2017-07-29Cork City Council Social Housing Programme 2017-2019 (Cork City Council)
The CCC Social Housing Programme 2017-19 is a part of CCC's delivery plan for Rebuilding Ireland as approved by Government in July 2016. There are significant targets to be delivered in Cork City and in this regard the Cork City Council Social Housing Programme 2017-19 is a major part of the Council's delivery plan for Rebuilding Ireland.
The Council through a Competitive Dialogue procedure, wishes to identify suitable Candidates to contribute to the delivery of the CCC Social Housing Programme 2017-19. …
View the procurement »
2017-07-24Coonagh Campus Enabling Works (Limerick Institute of Technology)
The works are to enable the fit-out of the unoccupied part of Coonagh Cross Shopping Centre for education use by Limerick Institute of Technology. The works will include repairs and completion of underground services; modifications and completions to roads, paths, and car parks; landscaping works; repair works and modifications to the external envelope, structure and substructure; construction of a walled vehicle yard; construction of a small extension to the Shopping Centre, for future fit-out; and …