Recent procurements of other electrical installation work in Ireland
2023-08-17Iontas Theatre Heating Upgrade (Castleblayney Arts and Community Development CLG)
Air quality system to class 9, ISO Clean Room standard tested on completion to achieve independent certification documents verifying all aspects of the tender have been achieved and delivered. Class 9 clean room standard required, to include a bespoke integrated building management system to deliver a perfectly clean and comfortable environment in this theatre for both the audience and the entertainers. Scope of works includes Ventilation, Extraction, Filtration, Heating, Cooling, Air handling, and …
View the procurement »
2023-08-15SC 07/23 - Derrygreenagh Power 400/220 kV Substation (Bord na MĂłna PLC)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the services comprise of the design, procurement, installation, and commissioning of the electrical engineering works in relation to the Derrygreenagh Power TSO substations.
View the procurement »
2022-11-23Provision of a Framework Agreement for Electrical Works Balance of Plant (EBOP) to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from suitably qualified candidates for inclusion on a Framework Agreement for Electrical works balance of plant (EBOP) for a significant pipeline of wind development projects. Please find attached our expression of interest document (in PDF and Word format) which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-11-16EV Supply and installation of Chargers for Ringsend and Harristown Depots REF OJEU 15.2022 (Dublin Bus / Bus Atha Cliath)
Dublin Bus is seeking to select a shortlist of suitably qualified providers to undertake a Design & Build contract for the design, supply, installation, and maintenance of charging equipment for battery-electric and hybrid vehicles. Dublin Bus requires a turnkey solution (design and build) to provide in-depot charging equipment and associated infrastructure necessary to facilitate plug-in charging of its planned battery-electric bus fleet. Due to the phased arrival of all-electric vehicles into the …
View the procurement » Mentioned suppliers:Hitachi Energy Ireland Limited
2022-07-28Energy Meter Data Capture and Meter Data Processing Solution with Support and Maintenance (EirGrid plc)
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading …
View the procurement »
2022-04-13Drogheda Urban Animation - Myths and Legends Trail (Louth County Council)
Louth County Council (LCC) has been successful in a funding application to Fáilte Ireland for an urban animation for The Project for Drogheda Co. Louth. The proposed lighting contract comprises of the animated lighting of 5 key legends of the River Boyne in lighting installations to landmark structures along the river in Drogheda.
Landmark buildings and structures in the historic landscape will be used as the setting for animated lighting installations of legends that will extend story telling from the …
View the procurement »
2022-03-29Kilbride School Campus Electrical Works (Kildare and Wicklow Education and Training Board)
Expressions of Interest are invited from suitably qualified Electrical Contractors who wish to be considered for the construction of a new educational campus and a new link road that will serve the school campus which will include the provision of two school buildings. Gaelscoil an Inbhir Mhóir a two-storey, 16 classrooms primary school with special needs rooms. Gaelchólaiste na Mara a three-story, post primary school with special needs rooms. Proposed site works to include the construction of new hard …
View the procurement »
2022-01-17Powered Gates and Shutters (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing Powered Gates, Shutters, Doors and Barriers. The requirements under this contract will include; planned preventative maintenance, unplanned repair works, installation of new and certificate submissions to IE Sharepoint document library.
View the procurement »
2021-02-05Electrical Balance of Plant Services — Derryadd Wind Farm (Bord Na Mona)
Bord na MĂłna Powergen Ltd intends to procure design and build services for the Derryadd wind farm grid connection works.
The scope of works for the proposed contract shall include design, procurement, construction, testing, and commissioning pertaining to the grid connection works as outlined in the below list. It should be noted the below list is non-exhaustive and detailed scope of work will be issued at tender stage.
• civil works for 110 kV contestable substation and IPP MV substation;
• civil works …
View the procurement »
2020-12-18Schools Remediation Programme 3 (Department of Education)
The Minister for Education and Skills (the Contracting Authority), intends to establish a multi-party framework, of suitably qualified and experienced MEP services contractors to deliver works contracts for the MEP remediation and associated works. Remediation works shall be carried out at existing schools across the Republic of Ireland. Applicants should note that further/fewer projects may be carried out under the framework at the discretion of the contracting authority.
View the procurement » Mentioned suppliers:CJK Electrical LtdSensori Facilities Management Ltd
2020-05-27Electrical Installation and Maintenance Services (Cork Institute of Technology)
This request for tender (RFT) invites suitably qualified service provider to deliver electrical maintenance services to Cork Institute of Technology (CIT). It is anticipated that the contract will start in Q3 2020 and run for an initial period of 3 years, with options to extend for a further two 1-year periods.
View the procurement » Mentioned suppliers:Dornan
2020-05-27Provision of LED Lighting Services to LIT (Limerick Institute of Technology)
Tenders are invited from suitably qualified companies for the delivery of an LED Light Upgrade project. It is anticipated that the duration of the project will be 2 months approximately. The successful tenderer will be required to complete the project during the months of July and August 2020.
View the procurement »
2020-04-23Supply and Install Solar PV Solutions (Electricity Supply Board (ESB))
The contracting entity intends to procure a single supplier framework for the supply and install solar PV solutions, and related services, to commercial and industrial customers.
The scope of the service design, procure, supply, install, commission and maintain all elements of ground-mounted and roof-mounted solar PV projects. The projects will be located in the Republic of Ireland on commercial premises. Applicants must be able to provide the full scope of services of a solar EPC contractor, including …
View the procurement » Mentioned suppliers:Grange Solar
2019-12-06Medium Voltage Switchgear, Generator Protection and Synchroniser Replacement (Electricity Supply Board (ESB))
The contracting entity intends to procure frameworks for the design, supply, installation and commissioning of the equipment in each of the following lots
Lot 1: Design, Manufacture, Delivery, Installation and Commissioning of Medium Voltage Switchgear;
Lot 2: Design, Manufacture, Delivery, Installation and Commissioning of Generator Protection and Synchroniser Panels.
Delivery of the equipment will be to ESB Power Station(s) located in the republic of Ireland. The appointed framework agreement providers …
View the procurement » Mentioned suppliers:Hitachi Energy IrelandNeoDyne
2019-11-25Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
Oweninny Power 2 DAC, the contracting entity, is a joint venture company formed between Bord na MĂłna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The contracting entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project.
Oweninny Phase 2 wind farm is an 83 MW project located adjacent to the existing 89 MW Oweninny Phase 1 …
View the procurement » Mentioned suppliers:H&MV Engineering Ltd
2019-09-06Samuel Beckett Civic Campus Phase 2: Electrical Services (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line.
Phase 1 included a sports and community building, sports pitches and surface car parks.
Phase 2 will expand on phase 1 and will include the following:
A. The change of use of the Phase 1 sports and community building to a library and community building;
B. Refurbishment of the existing sports building to create a new library;
C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s …
View the procurement »