Energy Meter Data Capture and Meter Data Processing Solution with Support and Maintenance

EirGrid plc

The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading and Settlement Code. EirGrid and SONI currently use different energy meter data capture and data processing solutions. The scope of the project will include replacing the EirGrid system. It may include replacing the SONI system. This replacement may be done in parallel with the EirGrid implementation, after that implementation or not at all. A decision on the inclusion of SONI will be made when the regulatory funding position is fully established.

Deadline

The time limit for receipt of tenders was 2022-09-05. The procurement was published on 2022-07-28.

Who? What? Where?
Procurement history
Date Document
2022-07-28 Contract notice
Contract notice (2022-07-28)
Object
Scope of the procurement
Title: IT services: consulting, software development, Internet and support
Reference number: ENQEIR781
Short description:
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading and Settlement Code. EirGrid and SONI currently use different energy meter data capture and data processing solutions. The scope of the project will include replacing the EirGrid system. It may include replacing the SONI system. This replacement may be done in parallel with the EirGrid implementation, after that implementation or not at all. A decision on the inclusion of SONI will be made when the regulatory funding position is fully established.
Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: IT services: consulting, software development, Internet and support ๐Ÿ“ฆ
Additional CPV: Energy meters ๐Ÿ“ฆ
Place of performance
NUTS region: ร‰ire/Ireland ๐Ÿ™๏ธ

Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Utilities entity
Awarding authority name: EirGrid plc
Postal address: Block 2 - The Oval, 160 Shelbourne Road
Postal code: Dublin 4
Postal town: Ballsbridge
Contact
Internet address: http://www.eirgrid.com ๐ŸŒ
E-mail: paul.valentine@eirgrid.com ๐Ÿ“ง
Phone: +353 12370200 ๐Ÿ“ž
URL for documents: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=219990&B=ETENDERS_SIMPLE ๐ŸŒ
URL for participation: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=219990&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Dates
Date dispatched: 2022-07-28 ๐Ÿ“…
Submission deadline: 2022-09-05 ๐Ÿ“…
Publication date: 2022-08-02 ๐Ÿ“…
Identifiers
Notice number: 2022/S 147-422139
OJ-S issue: 147
Additional information
1) Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties. 2) This is the sole call for competition for this service. 3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers. 4) Contract award will be subject to the approval of the competent authorities. 5) It will be a condition of award that candidates are tax compliant and are in a position to produce a valid tax clearance certificate or eTax Clearance from the Revenue Commissioners when requested. 6) If for any reason it is not possible to award the contract one or more of the tenderers invited following the conclusion of this competitive process, the contracting authority reserves the right to award the contract to the next ranked tenderer as appropriate. 7) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded. 8) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words โ€˜or equivalentโ€™ will always be appended. 9) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of questionnaires with missing or incomplete information. Therefore, candidates are advised to ensure that they return fully completed questionnaires in order to avoid the risk of elimination from the competition.
Show more

Object
Scope of the procurement
Estimated total value: 14 000 000 EUR ๐Ÿ’ฐ
Short description:
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading and Settlement Code. EirGrid and SONI currently use different energy meter data capture and data processing solutions. The scope of the project will include replacing the EirGrid system. It may include replacing the SONI system. This replacement may be done in parallel with the EirGrid implementation, after that implementation or not at all. A decision on the inclusion of SONI will be made when the regulatory funding position is fully established. The new system should capture Energy Metering Data, which is required for use by different business units within EirGrid (such as I-SEM, including Interconnector Settlement, TUoS and DS3 Services). It should be able to process meter data to ensure that the most accurate set of data is available for use. It should make this data available for the Business Units and Single Energy Market in appropriate formats through some form of customer meter data access facility. Ideally, it would also allow EirGrid give generators and other external parties access to their own meter data through a similar access facility. The single supplier Framework Agreement period will be for an initial duration of four years with the option to extend annually for up to an additional four years, subject always to the satisfactory performance of the supplier.
Show more
Estimated value excluding VAT: 14 000 000 EUR ๐Ÿ’ฐ
Duration: 48 months
Description of options:
The initial contract period envisaged is 4 years with the possibility to extend annually up to a further 4 years, subject always to the satisfactory performance of the supplier.
The estimated spend of 14,000,000 EUR is taking into account the full duration of the contract including the possible extensions.
Under Article 51 as set out in Council Directive 2014/25/EU as transposed into Irish law by the European Union Award of Contracts by Utility Undertakings) Regulations 2016 (S.I. 286 of 2016) (the โ€œRegulationsโ€) there can be exceptional cases duly justified that allows the term of a framework agreement to exceed eight years. Given the complexity of EirGrid system set-up, any revenue metering system installed may become embedded into EirGridโ€™s systems architecture. This may lead to future contracts for continuous support. Therefore, EirGrid may award future contracts for continuous support up to the maximum allowed 20 years, subject always to the satisfactory performance of the supplier.
Show more

Legal, economic, financial and technical information
Conditions for participation
Suitability to pursue the professional activity:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
List and brief description of rules and criteria:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
Contract execution
Deposits and guarantees required:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
Contract performance conditions:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice

Procedure
Legal basis: 32014L0025
Envisaged number of candidates: 5
Objective criteria for choosing the limited number of candidates:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
Time of receipt of tenders: 12:00
Languages in which tenders or requests to participate may be submitted: English ๐Ÿ—ฃ๏ธ
Tender validity period: 12 months

Contracting authority
Identity
National registration number: N/a
Contact
Contact point: Paul Valentine
Address of the buyer profile: https://irl.eu-supply.com/ctm/Company/CompanyInformation/Index/219 ๐ŸŒ
Documents URL: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=219990&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Additional information
1) Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties.
Show more
2) This is the sole call for competition for this service.
3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers.
4) Contract award will be subject to the approval of the competent authorities.
5) It will be a condition of award that candidates are tax compliant and are in a position to produce a valid tax clearance certificate or eTax Clearance from the Revenue Commissioners when requested.
6) If for any reason it is not possible to award the contract one or more of the tenderers invited following the conclusion of this competitive process, the contracting authority reserves the right to award the contract to the next ranked tenderer as appropriate.
Show more
7) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded.
8) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words โ€˜or equivalentโ€™ will always be appended.
Show more
9) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of questionnaires with missing or incomplete information. Therefore, candidates are advised to ensure that they return fully completed questionnaires in order to avoid the risk of elimination from the competition.
Show more

Complementary information
Review body
Name: The High Court
Postal address: Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Phone: +353 18886000 ๐Ÿ“ž
Internet address: http://www.courts.ie ๐ŸŒ
Information about review deadlines:
The contracting authority will not conclude this contract to which a standstill period applies in accordance with Council Directive 2014/25/EU, until after the expiry of the standstill period which commences on the day following the date of notification on concerned candidates and tenderers. The duration of the standstill period will be 14 calendar days where notifications are sent electronically or by fax and 16 calendar days where these are sent by any other means. The Statutory Instrument mentioned above provides that review procedures are available in the High Court to a person who has or has had an interest in obtaining the reviewable public contract and alleges that he or she has been harmed or is at risk of being harmed by an infringement of the law in relation in this contract.
Show more
Service from which information about the review procedure may be obtained
Name: Central office of the High Courts (Appeal Section)
Postal address: Ground Floor, East Wing, Inns Quay
Source: OJS 2022/S 147-422139 (2022-07-28)