2020-07-03Metal Fabrication Multi Party Framework (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) invites suitably qualified and experienced companies to participate in a tender process for the establishment of a multiparty metal fabrication services framework to meet the needs of all IÉ locations nationwide.
This tender was previously advertised on RFT 168388/OJEU Reference 2020/S 106-257953. The requirement to re-advertise was due to changes in the requested standards to lots 2 and lot 3.
Requirements can range from standard fabrication such as bracketry and hinges to more …
View the procurement »
2020-06-22Design, Manufacture, Supply and Installation of Conveyor Belt System (CBS) (Dublin City Council)
Dublin City Council (DCC) is to build a new international standard White-Water Rafting Centre (WWRC) in George's Dock, Dublin 1. The WWRC will consist of the white-water rafting course, swift water rescue training facility, kayaking and canoe polo pool and urban street scene. As part of this WWRC, DCC wish to procure a specialist to design, manufacture, supply and installation of a new conveyor belt system to carry rafts from the lower to upper pool of the WWRC.
Please consult the appropriate …
View the procurement »
2020-06-22Design, Manufacture, Supply and Installation of Vertically Installed Submersible Axial Flow Pumps (Dublin City Council)
Dublin City Council (DCC) is to build a new international standard White-Water Rafting Centre (WWRC) in George's Dock, Dublin 1. The WWRC will consist of the White-Water Rafting course, swift water rescue training facility, kayaking and canoe polo pool and urban street scene. As part of this WWRC, DCC wish to procure a specialist to design, manufacture, supply and installation of vertically installed submersible axial flow pumps for the proposed White-Water Rafting Centre.
Please consult the appropriate …
View the procurement »
2020-06-22Design, Manufacture, Supply and Installation of 2 no Steel Water Retention Gates and 6 no Penstocks (Dublin City Council)
Dublin City Council (DCC) is to build a new international standard White-Water Rafting Centre (WWRC) in George's Dock, Dublin 1. The WWRC will consist of the white-water rafting course, swift water rescue training facility, kayaking and canoe polo pool and urban street scene. As part of this WWRC, DCC wish to procure a specialist to design, manufacture, supply and installation of 2 no steel water retention gates and 6 no Penstocks for the proposed Whitewater Rafting Centre.
Please consult the appropriate …
View the procurement »
2020-06-22Design, Manufacture, Supply and Installation of Water Treatment Plant (Dublin City Council)
Dublin City Council (DCC) is to build a new international standard White-Water Rafting Centre (WWRC) in George's Dock, Dublin 1. The WWRC will consist of the white-water rafting course, swift water rescue training facility, kayaking and canoe polo pool and urban street scene. As part of this WWRC, DCC wish to procure a specialist to design, manufacture, supply and installation of water treatment plant for the proposed Whitewater Rafting Centre.
Please consult the appropriate documentation, which contains …
View the procurement »
2020-06-03Multi Supplier Framework Agreement for Unplanned Building Maintenance Services (Bus Eireann/Irish Bus)
Bus Éireann proposes establishing a new framework agreement for the provision of unplanned building maintenance services to a number of sites, accommodation units and facilities located throughout the Republic of Ireland for a four (4) year period.
Bus Éireann has a requirement for the following eight service disciplines on an on-demand basis:
• building maintenance works,
• mechanical and electrical services,
• painting and decorating,
• GAS services,
• roofing specialist,
• heating and ventilation …
View the procurement »
2020-06-03M50 Traffic Flow Optimisation (MTFO) Civil/Structural Works – J14 to M11 (Transport Infrastructure Ireland (TII))
The scope of this contract is the construction of all civil and structural works required along the M50 Motorway related to supporting the deployment of the M50 Traffic Flow Optimisation (MTFO) Civil/Structural Works – J14 to M11 ITS Equipment.
These works are under the programme for enhancing Motorway Operation Services (eMOS). The CA is committed to continuously improving the safety of its infrastructure and operations and optimising the performance of the motorway network through the provision of …
View the procurement » Mentioned suppliers:Jons Civil Engineering Ltd
2020-05-29Metal Fabrication Multi Party Framework (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) invites suitably qualified and experienced companies to participate in a tender process for the establishment of a multiparty metal fabrication services framework to meet the needs of all IÉ locations nationwide. These services can range from standard fabrication requirements such as bracketry and hinges to more bespoke designed components which may require specialised welding. Only companies with suitable fabrication expertise and experience in accordance with the requirements of …
View the procurement »
2020-05-14STEM Building Extension at Dundalk Institute of Technology Campus, Dublin Road, Dundalk, Co. Louth (Dundalk Institute of Technology)
The new STEM building extension is a circa 1 300 m two storey building which is being constructed on the eastern side of the existing North Building to provide teaching and lab spaces for students at the facility.
The new building will include a two storey link to the existing North Building which will require some alteration works within the North Building to facilitate same.
The new facility is a brick and glazing clad RC structure with highly serviced laboratory and associated teaching spaces. …
View the procurement » Mentioned suppliers:McKeon Group
2020-04-23Supply and Install Solar PV Solutions (Electricity Supply Board (ESB))
The contracting entity intends to procure a single supplier framework for the supply and install solar PV solutions, and related services, to commercial and industrial customers.
The scope of the service design, procure, supply, install, commission and maintain all elements of ground-mounted and roof-mounted solar PV projects. The projects will be located in the Republic of Ireland on commercial premises. Applicants must be able to provide the full scope of services of a solar EPC contractor, including …
View the procurement » Mentioned suppliers:Grange Solar
2020-04-16Workshop Industrial Welding Supplies (Irish Prison Service)
The Irish Prison Service has a requirement for the supply and delivery of workshop industrial welding supplies (Steel Products, Welding Equipment Consumables, Welding Gases) for use in their Training Workshops in the following prisons:
• Wheatfield Prison, Cloverhill Road, Clondalkin, Dublin 22;
• Midlands Prison, Dublin Road, Portlaoise, Co. Laois;
• Shelton Abbey, Arklow, Co. Wicklow
View the procurement » Mentioned suppliers:AEF LtdD Kennedy Steel Supplies Ltd
2020-03-09Supply, Installation and Maintenance of Photo Voltaic Panels (An Post)
An Post is seeking a supplier to deliver this next phase of its sustainability programme which will involve provision and installation of solar energy capture at a number of its premises.
It is envisaged that this will require installation of photo voltaic/solar panels of an appropriate capacity at each of the premises involved, which may range from delivery service units and post offices to the much larger mail centres. The panels would be expected to provide sufficient power for the locally operating …
View the procurement »
2020-02-05Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2020-02-03Multi-Party Framework Agreement for the Provision of Basement Impact Assessment Auditor Services (Dublin City Council)
The successful tenderer (Auditor) is required to conduct a review of a basement impact assessment submission for compliance and adequacy and shall confirm whether the BIA has been completed and has addressed all DCC policies as specified and outlined in the Basement Development Policy and Basement Development Guidance documents. The Auditor is then required to prepare an audit report for submission to the DCC Environment and Transport (E&T) Department.
A multi-party framework agreement to audit basement …
View the procurement »
2020-01-31Thermal Upgrade and Refurbishment Works Contractor Framework (Limerick City and County Council)
Limerick City and County Council intends to establish a contractor framework panel to carry out thermal upgrade and refurbishment works to residential units, mixed use units largely within regeneration areas in Limerick city. Interested contractors are now invited to express an interest by responding to this Stage 1 — Pre-qualification process. There will be a maximum of 8 No framework participants. For further information refer to the enclosed documents.
View the procurement » Mentioned suppliers:Henry Connolly Builder Ltd
2020-01-14West Quad Development (Grangegorman Development Agency)
This is a key strategic project; part of current and future programmes of works by the GDA, on behalf of Technological University Dublin (TU Dublin) at the TU Dublin City Campus, Grangegorman. The c.21 000 sm/7-storey West Quad will comprise new third-level learning and working space, as well as TU Dublin's University exam and conferring hall.
View the procurement »
2019-11-18Academic Hub Library Complex (Grangegorman Development Agency)
The initial phase of the TU Dublin Academic Hub and Library Complex is planned as a cluster of buildings and courtyards, both existing and new around the historic North House protected structure. The library and student support complex will sit at the heart of the new Grangegorman campus, addressing a large plaza and commanding views over the city.
The overall Phase 1 development is approximately 12 580 m in area. The development consists of 9 505 m of new build construction with the balance comprising …
View the procurement »
2019-11-18AHLC: Reserved Specialists (Grangegorman Development Agency)
The initial phase of the TU Dublin Academic Hub and Library Complex is planned as a cluster of buildings and courtyards, both existing and new around the historic North House protected structure. The library and student support complex will sit at the heart of the new Grangegorman campus, addressing a large plaza and commanding views over the city.
The overall Phase 1 development is approximately 12 580 m in area. The development consists of 9 505 m of new build construction with the balance comprising …
View the procurement »
2019-09-16Maynooth University Student Centre (Maynooth University)
Maynooth University wishes to construct a new 3 700 m student centre which will act as a hub for Maynooth Student Union (MSU), clubs, societies, events and the variety of activities that create that special sense of belonging at Maynooth University. The distinctive architecture and facilities will deliver a unique destination on campus that offers a welcoming and inclusive environment for our students. Construction will commence in early 2020 and the anticipated completion date is August 2021.
View the procurement »
2019-09-06Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. the change of use of the Phase 1 sports and community building to a library and community building;
B. refurbishment of the existing sports building to create a new library;
C. the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-08-29Realignment of the N26 at Cloongullane (Mayo County Council)
The project includes the realignment of 1,8 km of the N26 at Cloongullane, approximately 3,4 km north-west of Swinford, County Mayo.
The proposed realignment of the N26 at Cloongullane includes the following:
— 1,8 km of Type 2 Single Carriageway Road (predominantly offline),
— a new bridge crossing of the River Moy SAC (downstream of the existing N26 bridge),
— 2 new culverts over tributaries of the River Moy,
— local road realignments,
— accommodation works/farm accesses.
View the procurement » Mentioned suppliers:BAM Civil Ltd
2019-08-01Bord na Mona Solar PV EPC Tender (Bord Na Mona)
This information memorandum, including the pre-qualification questionnaire (PQQ) and any other updates or clarifications subsequently sent to interested parties (together the ‘pre-qualification procurement documentation’) is issued in relation to the procurement competition to award a contract for engineering, procurement and construction (EPC) delivery of a ground mounted solar farm at Timahoe North, County Kildare, Ireland as published in the supplement to the Official Journal of the European Union. …
View the procurement »
2019-05-22N11 Parallel Service Road (Wicklow County Council)
Construction of a segregated service road on the southbound carraigeway of the N11 Parallel Service Road at Kilmacanoge between Junction 7 (Bray South) and Junction 8 (Kilmacanoge). The works will include carriageway widening into the central reserve by up to 3 m over a distance of 1,7 km, provision of 2 sign gantries, alterations to existing services, replacement of safety barrier and associated traffic management.
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-04-03Replacement of Studio Floors (Raidio Teilifis Eireann (RTE))
RTÉ invites tenders for the replacement of studio floors in 2 separate lots. Lot 1 is the studio 5 floor totalling 223 m and Lot 2 is the studio 4 floor totalling 626 m. The floors will be high-quality TV floors with a surface hardness, levelness and flatness suitable for modern TV studio requirements including ‘in shot’ camera tracking. Currently the Studio 5 works are programmed for August 2019 with the studio available for 3 weeks. Studio 4 works are planned for 2020 subject to internal RTÉ approval.
View the procurement » Mentioned suppliers:MVOHalloran Ltd
2019-03-04Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement » Mentioned suppliers:McGinty and O'Shea Ltd
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd