2012-05-21LIT Building Contractor Framework (Limerick Institute of Technology)
Building works will vary in size and nature but will all be to a third level education standard. Works will include new build and refurbishment works. The actual scope of works for each project will be specific to each site/location and will include, but not limited to categories such as Catering and Hospitality and support accommodation,Science Research and Development including wet and dry labs,Standard third level accommodation,Sports buildings and associated facilities.
The Framework Agreement will …
View the procurement »
2012-05-18Framework Agreement for Bituminous Contract 2013-2015 (Dublin City Council)
Expressions of Interest are invited from Surfacing Contractors to enter into a Framework Agreement Bituminous Pavement Contracts within the Dublin City Council Administrative Area.
— Road Resurfacing using bituminous materials (asphaltic concrete, HRA, Clause 942),
— Road Planing,
— Anti-skid Surfacing,
— Coloured surfacing,
— Laying of geogrids,
— Road Repairs,
All works are to be carried out in a city and surburban environment in accordance with the 'Direction for the Control and Management of …
View the procurement » Mentioned suppliers:Roadstone Wood Ltd.
2012-05-16Site services (Dublin Airport Authority plc (DAA))
This project is for the provision of site services to Dublin Airport Authority at its Dublin Cork and Shannon airports.
Site services may include but are not restricted to the following.
— Cleaning,
— Porterage and portering,
— Passenger accompaniment, escort and expediting,
— Provision of staff for promotional activities,
— Security,
— Passenger screening,
— Queue management,
— Provision of lounge staff and services,
— Chauffeurs,
— Customer survey staff,
— Marketing staff,
— Etc.
The project is also …
View the procurement »
2012-05-11Civil Engineering Services for an Enabling Works Contract (SmartPly Europe Ltd)
SmartPly have plans to modernize the SmartPly OSB facility with an investment in new equipment for biomass heat energy, wood strand drying, screening, pressing and panel finishing. The new plant equipment will be housed in a proposed building extension of floor area of approximately 8,900m2.
SmartPly invite submissions from Civil Engineering Contractors who wish to tender for an Enabling Works Contract. The Contract is expected to commence on the site by mid August and be substantially complete by …
View the procurement »
2012-05-10Frameworks for mechanical & electrical maintenance services & electrical minor works services (University College Dublin (UCD))
UCD is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three multi-party framework agreements ("the framework agreements") as follows:
Lot 1 mechanical maintenance & operational services.
Lot 2 electrical maintenance & operational services.
Lot 3 electrical minor works services.
The purpose of the first stage is to obtain information from the applicants to determine their suitability on the basis of financial capacity, technical …
View the procurement »
2012-05-03HBS upgrade (Dublin Airport Authority plc (DAA))
Dublin Airport Authority currently has standard 1, standard 2 and standard 3 certified HBS (hold baggage screening) EDS (explosive detection system) x-ray equipment in service across its 4 Terminals at Cork, Dublin and Shannon Airports. Dublin Airport Authority plc intends to upgrade/replace existing Standard 1 HBS EDS X-Ray equipment with the integration and installation of standard 2 certified HBS EDS X-Ray equipment into the existing HBS Systems. Only HBS EDS X-Ray equipment which has been certified …
View the procurement »
2012-05-01Longford Sewerage Scheme Phase 2 - Preliminary Design Stage (Longford County Council)
Longford County Council requires the services of a competent Consulting Engineer experienced in the field of wastewater collection, treatment and disposal to carry out services for the Preliminary Design Stage to determine the future strategy for the Longford Sewerage Scheme.
The Longford Sewerage Scheme Phase 2 Preliminary Design Stage will involve a Consulting Engineer carrying out an investigation of the Longford Wastewater Treatment Plant as well as the drainage catchment of Longford Town and its …
View the procurement »
2012-04-30Establishment of a Single Party Framework for Trail Furniture (Fáilte Ireland-National Tourism Development Authority)
Tenders are invited for the construction, storage, graphic design and supply of information display boards, waymarker posts, directional arrows, stiles, bridges, kissing gates, gate signs, and interpretation panels, and any other trail materials, as required for trail routes, both off and on road.
Please Note: Third Party requirements for Trail Furniture.
On occasion when Fáilte Ireland carries out an assessment of a trail but is not in a position to fund, a third party organisations (examples County …
View the procurement » Mentioned suppliers:Highway Safety Developments Ltd.
2012-04-27Kerdiffstown Landfill Remediation Project - Environmental Services (Environmental Protection Agency)
The landfill and waste facility at Kerdiffstown has closed and is now undergoing the early stages of a clean-up or ‘remediation’ process. The Environmental Protection Agency (EPA) is using powers under the Waste Management Act 1996 (as amended) to restore the site and put in place appropriate aftercare measures to prevent and limit pollution from the materials on the site.
The site consisted of an extensive recycling facility, now partly dismantled, an authorised lined landfill that had been partially …
View the procurement »
2012-04-20Supply, delivery and commissioning of furniture and equipment to St. Marys CBS Tralee (Board of Management, St. Mary's CBS (Tralee))
Supply, delivery and commissioning, as required of furniture and equipment at St. Marys Christian Brothers School, The Green Tralee, Co. Kerry. Loose furniture and equipment for Music/Drama Area, Learning Support Room, Mathematics Room, Social Studies Room, Science Laboratories, Art/Craft Room & Store, Design & Communication Graphics, Construction Studies/W.T. Room/Architectural Technology, Wood Machine Room and Preparation Area, General Office, Multimedia Learning Laboratory, First Aid Room, …
View the procurement »
2012-04-20Waterford city flood alleviation scheme phases 2, 3 & 4 works (Waterford City Council)
The construction of approximately 6km of flood defences in the form of reinforced concrete and sheetpiled flood walls and flood embankments on the banks of sections of the River Suir, John's River and Lisduggan Stream in Waterford City.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=408332.
View the procurement »
2012-04-05Summerhill College Sligo - furniture & equipment (Summerhill College)
Supply, delivery and installation and commission of loose and fixed furniture & fittings, equipment and machinery for new secondary school at Summerhill College, Sligo.
Note: It is planned that the school will be handed over to the board of management from contractors over at planned delivery stage, however in the unlikely event that is not so, successful tenderers may be required to supply and deliver to a working site and therefore comply with site regulations.
Note: To register your interest in this …
View the procurement »
2012-04-05Motorway maintenance and renewals contract (MMaRC) (National Roads Authority (NRA))
The Contracting Authority (National Roads Authority) wishes to procure contractors for the provision of network maintenance services on selected high speed motorway and dual carriageway sections (including junctions and slip roads) which comprise part of national road network in Ireland. The services include:
1) Undertaking routine inspections and maintenance of the asset, including pavement, drainage, structures, bridges, signage & safety barriers;
2) Responding to incidents on the network, including …
View the procurement » Mentioned suppliers:Colas Roadbridge Joint VentureEgis Lagan Services LtdGSJ Maintenance Ltd
2012-03-29Maintenance contracts 2013 - 2015 (Shannon Development Co. Ltd.)
Shannon Development is a regional development company. The brief of Shannon Development is to generate industry, tourism and regional development in the Shannon Region which includes counties Clare, Limerick, North Tipperary, South Offaly and North Kerry.
The Company’s extensive property portfolio throughout the region includes approximately 3.7 m sq. ft. of industrial space, 58 business parks/enterprise centres and 29 multi-tenanted buildings.
Shannon Development wishes to create three separate …
View the procurement »
2012-03-27Framework agreement for civil engineering contractors for road construction works [in 2 lots] (Dun Laoghaire Rathdown County Council)
Dún Laoghaire-Rathdown County Council is anticipating the need to procure civil engineering contractors for the construction of a number of road projects that are included in the County Development Plan 2010 –2016 as 6-year roads objectives. The schemes that may be advanced to construction (subject to planning approval and available funding) may include:
— Burton hall road extension,
— Leopardstown link road & roundabout reconfiguration,
— Pottery road improvement scheme.
This list is not exhaustive and …
View the procurement »
2012-03-22CHP unit (NSCDA (Operations) Ltd)
NSCDA wishes to appoint a contractor to remove and safely dispose of the existing CHP unit and to supply, install, commission, test and maintain for 5 years a new CHP unit at the National Aquatic Centre. The works shall include strip out and disposal of the existing CHP unit, associated building works, mechanical and electrical diversion works within the plant rooms to facilitate the removal of the existing CHP, mechanical and electrical and CHP commissioning, testing, handover and demonstration. The …
View the procurement »
2012-03-21New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following:
— Threshold 26 relocation,
— CAT I approach lighting system relocation,
— Eastern RESA extension to approximately 150mx240m,
— Western RESA extension to approximately 150mx240m,
— Construction of concrete box to channel open drain,
— Construction of Eastern runway turn pad extension,
— Construction of Western runway turn pad extension,
— Installation of runway guard lights,
— Relocation of PAPI,
— Relocation of glide path,
— Reparation of …
View the procurement »
2012-03-13Floor covering contract (City of Dublin Vocational Education Committee)
For the supply of floor covering to centres under the City of Dublin VEC jurisdiction.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=396014.
View the procurement »
2012-03-12River Fergus Lower (Ennis) Certified Drainage Scheme civil works contract (Office of Public Works (OPW))
Works approximately includes.
3 300 m embankment works, including sheet piling,
900 m wall works, including sheet piling,
600 m surface water sewers,
3 No. surface water pumping stations,
Flap valves.
Fish Pass Improvements.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=393732.
View the procurement »
2012-03-12Glazing contract (City of Dublin Vocational Education Committee)
To supply glazing to all centres within the City of Dublin VEC jurisdiction.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=386612.
View the procurement »
2012-03-07Framework Agreement for Small Civil Engineering Works (Dun Laoghaire Rathdown County Council)
Dun Laoghaire Rathdown County Council in conjunction with other authorities in the Dublin environs (Fingal County Council, South Dublin County Council and Dublin City Council) proposes to establish and operate a framework agreement for small civil engineering works. The proposed works includes (but is not limited to) the following:
— alterations to and maintenance of urban roadways, signalised junctions, roundabouts and other uncontrolled junctions,
— resurfacing and road reconstruction,
— laying of foul …
View the procurement »
2012-03-07DCU - Nano bio-analytical research building (Dublin City University (DCU))
The development comprises the construction of an L-shaped, three storey over part basement building of approximately 3 000 sq.m.
Please refer to the suitability assessment questionnaire attached to the contract notice at www.etenders.gov.ie.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=393153.
View the procurement »
2012-03-05ED/AMAU day services, concourse & link corridor & ancillary works at St Luke's Hospital, Kilkenny (Health Service Executive (HSE))
The proposed works at St. Luke’s Hospital, Kilkenny, requires the construction of a c 3 500 m² replacement of the existing Emergency department, Acute Medical Admissions Unit, day services unit including endoscopy, and ancillary works on the hospital site.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=392052.
View the procurement »
2012-03-02Carrickphierish Campus Development, Waterford City (Department of Education & Skills)
The Carrickphierish Campus Development is a joint project between the Department of Education and Skills (DES) and Waterford City Council (WCC). The development consists of the construction of two sixteen classroom primary schools each with a special needs unit, a public library, shared general purpose hall and community facilities, on a 5 acre site, located in the townland of Carrickphierish, in the Northwest suburbs of Waterford City. The works include car parking, set-down, hard play and soft …
View the procurement »
2012-03-01Framework for Plumbing Maintenance (COPE Foundation)
Single Supplier Framework Agreement for the provision of plumbing maintenance and minor capital works (value <=5 000 EUR) to COPE Foundation.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=390972.
View the procurement » Mentioned suppliers:Michael Barry Heating And Plumbing
2012-02-22Beaufort Maritime & Energy Research Laboratory (University College Cork (UCC))
The works will consist of the development of the new Beaufort Maritime & Energy Research Laboratory having a total floor area of 5,132 m2, demolition of existing warehouse, construction of access road and ancillary site development works, located on a site adjoining the National Maritime College of Ireland (NMCI).
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=370852.
View the procurement »
2012-02-21Cavan Sewerage Scheme/Wastewater Treatment Plant Upgrade (Cavan County Council)
Expressions of interest are invited from suitably qualified contractors for the Cavan Sewerage Scheme – Wastewater Treatment Plant Upgrade. It is required to expand the existing wastewater treatment plant (WWTP) from a capacity of 20 565 population equivalent (PE) to a capacity of 30 000 PE. The Contract will be “Public Works Contract for Civil Engineering Works ” and shall include operation and maintenance of the existing wastewater treatment plant during construction and shall include a one year …
View the procurement »
2012-02-13Development of St Johns old church as a cultural, heritage educational and display centre (St Johns Old Cemetery Restoration Group)
The work comprises the renovation and refurbishment of St Johns Church Nobber Co Meath. Located in an area of significant archaeological sensitivity the works include, replacement of existing roof, retaining original materials as far as possible. Repair defects in masonary to include Belltower, gutters ane eaves. Rehabilitation of windows and doors and installation of new fire exit door. Construction of new glazed entrance structure and a new viewing window on the South gable. Construction of Toilet …
View the procurement »
2012-02-10Framework Agreement for Works Contractors to carry out Student Residences Refurbishment Works at UCD (University College Dublin (UCD))
UCD is issuing this notice inviting expressions of interest as the first stage of a two-stage process under the restricted procedure. The purpose of the first stage is to obtain information from applicants to determine their suitability on the basis of financial standing, technical competence and capability and relevant experience to carry out the project.
Up to the top ten highest scoring suitably qualified applicants at suitability assessment stage will be shortlisted and invited to tender for …
View the procurement »
2012-02-02Cobh Landslides Project: Phase 2 (Cobh Town Council)
Cobh Town Council, as Contracting Authority and Employer, requires the services of a competent Consulting Engineer, with experience of Geotechnical Engineering Works related to Soil and Slope Stability, and the Structural Stability of Retaining Structures in environments similar to those found in Cobh, County Cork, Ireland.
All of the proposed works are located within the administrative area of Cobh Town Council.
The purpose of the project is the protection from landslides and wall collapses of people …
View the procurement » Mentioned suppliers:Malachy Walsh And Partners
2012-01-23Ballygoran to Collinstown Watermain Scheme (Kildare County Council)
This contract will provide for the construction of an 800mm diameter, approximately 5km long ductile iron pipe from Ballygoran Reservoir to Collinstown, Leixlip, Co. Kildare.
The pipeline will be predominantly laid in road including the Ballygoran to Pike Bridge local road L5003 and on part of the R148 Maynooth to Leixlip road.
The construction of the trunk main will involve crossings under the Dublin-Sligo Railway line, the Royal Canal and the M4 motorway by trenchless technology methods. The contract …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2012-01-19Framework agreement for road restoration, road resurfacing and ancillary works 2012 (Cork County Council)
Cork County Council proposes to establish and operate a framework agreement for 2012 for road reconstruction and resurfacing projects and ancillary works on regional and local roads throughout County Cork.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=368692.
The awarding authority has indicated that it will accept electronic responses to this notice via a 'Tender …
View the procurement »
2012-01-13Cork water supply scheme - storage; Mt Emla, Ballincollig, Chetwynd (Cork County Council)
Services Contract for the preliminary report, design, tender, construction and handover stages of Cork water supply scheme, storage - Mount Emla, Ballincollig and Chetwynd reservoirs.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=287792.
View the procurement »
2012-01-13National Gallery of Ireland - refurb works to Historic Wings - prequel of glazing contractors (Office of Public Works)
Scope of works for Historic Wings Refurbishment to include complete renovation of Dargan & Milltown Wings, redesign and replacement of Milltown Wing roof, provision of new atrium space in filling the existing courtyard between historic buildings and provision of Energy Centre under the Forecourt. The works to include installation of environmental control systems, sprinkler systems, fire and security systems, improvements in accessibility provisions and upgrade of lifts and building fabric repair.
Please …
View the procurement »
2011-12-21Ballygoran to Collinstown Watermain Scheme (Kildare County Council)
This contract will provide for the construction of an 800mm diameter, approximately 5km long ductile iron pipe from Ballygoran Reservoir to Collinstown, Leixlip, Co. Kildare.
The pipeline will be predominantly laid in road including the Ballygoran to Pike Bridge local road L5003 and on part of the R148 Maynooth to Leixlip road.
The construction of the trunk main will involve crossings under the Dublin-Sligo Railway line, the Royal Canal and the M4 motorway by Trenchless Technology Methods. The Contract …
View the procurement »
2011-12-20Bothar na dTreabh (N6) MMCI scheme phase 4 (Bodkin) (Galway City Council)
Improvement works are proposed to the Bodkin roundabout and the section of the N6 Headford Road between the Bodkin and Kirwan roundabuts. The roundabout will be replaced by new traffic signalised junction and a new sigmalised jucntion will be provided on the Headford Road. Works also include new sections of carriageway, footways and cycleways as well as associated signage, traffic signals and ancillary works.
Specifically the contract is proposed to include the following:
(i) New signalised junction …
View the procurement »
2011-12-16UCD Science Link Phase 2 (University College Dublin (UCD))
University College Dublin is issuing this notice inviting expressions of interest for the ‘UCD Science Link Phase 2’, using the restricted procedure. The purpose of this stage is to obtain information from applicants to determine their suitability on the basis of the selected criteria.
It is envisaged that the top 5-8 suitable candidates will be shortlisted and invited to tender for the appointment.
UCD intends to construct an extension to the Science Link Building at University College Dublin, Belfield, …
View the procurement » Mentioned suppliers:Walls Construction Ltd
2011-12-16Science Centre Phase 2 Fit Out: Works Package A (University College Dublin (UCD))
UCD is issuing this notice inviting expressions of interest for the ‘UCD Science Centre Phase 2 Fit-out - Works Package A’, using the restricted procedure. The purpose of the first stage is to obtain information from applicants to determine their suitability on the basis of financial standing, technical competence and capability and relevant experience to carry out the project.
It is envisaged that the top 5-8 suitable candidates will be shortlisted and invited to tender.
Please note this is not a tender …
View the procurement »