2023-10-04   WCC522023 Design Build Installation and 3 year Operational Support and Maintenance of Decarbonising Works for Bray... (Wicklow County Council)
Design Build Installation and 3 year Operational Support and Maintenance of Decarbonising Works for Bray Fire Station Schools Road Bray County Wicklow View the procurement »
2023-08-24   Mullinahone Community Center - Digital Hub (Mullinahone Community Council Ltd)
Refurbishment of 2 derelict rooms, including new windows and doors in Mullinahone Community Centre to re purpose them for a Digital Hub. View the procurement »
2023-08-21   Maintenance Services (Registration Code CV1001) (Circle Voluntary Housing Association CLG)
Circle Voluntary are inviting tenders in respect of Periodic Servicing, Inspections, Routine and Responsive Maintenance including Out of Hours Emergency Callouts, Void Property Works, Major Works and Technical Inspections to their housing stock. The housing stock is located in Dublin City and the Counties of Clare, Cork, Dun Laoghaire-Rathdown, Fingal, Kildare, Limerick, Louth, Meath, South Dublin, Tipperary, Waterford, Wexford and Wicklow View the procurement »
2023-08-18   Works to Templeport Community Centre, at Cloneary, Bawnboy, Co.Cavan H14 YX29 (Templeport Resource Centre)
The development consists of sliding partition wall and recess extension, new insulated floor to kitchen, new floor finishes, universal accessible toilet and new external doors at Cloneary, Bawnboy, Co.Cavan for Templeport Resource centre. View the procurement »
2023-08-18   Replacement of the existing windows and external doors (CWPA Planning and Architecture)
Replacement of the existing windows and external doors at Finglas Parochial N.S. View the procurement »
2023-08-11   New Windows for Upstairs in Boxing Hall (DICK HEARNS GYM CLG)
New Windows for Upstairs in Boxing Hall View the procurement »
2023-08-08   Roller Blinds to Government Buildings, Oliver Plunkett Road, Letterkenny, Co. Donegal (Office of Public Works OPW)
The Supply and Installation of Roller Blinds and the removal and environmental disposal of existing venetian blinds. View the procurement »
2023-08-04   EST WORKS - Framework Panel for Passive Fire Protection Works and Remedial Work to Passive Fire Measures (including... (Health Service Executive HSE)
The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified contractors providers for the provision of Passive Fire Protection works and Remedial Work to Passive Fire Measures (including PSCS) for which it is proposed to establish a Framework Panel to award call-off contracts for minor capital works projects at buildings located in Dublin North / East of Ireland. View the procurement »
2023-08-02   Contractor for Windows Replacement at Mullingar Community College, Mullingar, Co. Westmeath (Longford and Westmeath Education and Training Board)
Removal of existing selected windows and blinds, replacement and ancillary making good works View the procurement »
2023-08-02   Expression of Interest for Dublin City Council Multiparty Framework Agreement for Energy Efficiency Retrofit Works... (Dublin City Council)
Dublin City Council (DCC) is seeking to establish a Multi-Party Framework Agreement for the procurement of energy efficiency retrofit works contractors in Dublin City Councils residential, commercial / communal and other buildings in the Dublin City Council area citywide in 4 Lots. 3 Lots will have 5 framework members per Lot, if such numbers are achieved. All awarded 15 are entered in Lot 4. The Framework will be for 8 years renewed annually unless stated otherwise. . Please note that this project is … View the procurement »
2023-07-14   Thermal upgrade of timber windows and doors and associated repair works at The Avalon Centre, Chapel Street, Sligo (The Avalon Centre CLG)
Replacement of double-glazed units in hardwood windows and doors; overhaul of timber sliding sash windows; installation of secondary glazing; painting of windows and doors; localised brick repairs and lime mortar repointing of masonry around windows View the procurement »
2023-05-17   Energy Poverty Programme Framework (SEAI Procurement)
The objective of this RFT is to establish a framework of Contractors to install energy efficiency measures in eligible homes nationwide under Energy Poverty Programmes led by SEAI. The programmes currently in operation are the WHS, a nationwide programme, and the WHS 2.0 Priority Programme, in place since February 2022. The new framework will comprise a panel of Contractors capable of delivering the full suite of energy efficiency upgrades to eligible homes as required on both programmes. For further … View the procurement »
Mentioned suppliers: Airpacks Limited trading as KORE System Anthony Coughlan Heating & Plumbing Ltd... Bayview Contracts Limited Big H The plumber limited BlueBuild Energy Limited Breffni Insulation Limited Brusna Energy Solutions CDM Contracts Limited Century Retrofit Limited Churchfield Home Services CK Energy Management Solutions trading as Encon CLAR ICH CLG Cooper Insulation DECARB Contracts Limited DMT Renewables Limited Eco Home Insulation Limited Eco Wise Insulation EnviroBead Greenwatt Limited Hometherm Insulation Kingdom Installation Limited Leitrim Warmer Homes CLG LUCA LINE Limited Midland Warmer Homes Moston Construction NCE INSULATION O'Kane Plumbing & Electrics Limited Premier Insulations Premier Solutions NW Limited Quilter insulation SE SYSTEMS Sligo Leitrim Energy Agency Company... SSE Airtricity TLI Group Limited trading as Transmission... Townlink Construction Waterford Insulation
2023-04-14   Tender for the supply, delivery, installation & maintenance of furniture at MTU Kerry (Munster Technological University)
Munster Technological University is seeking tenders from competent providers for the supply, delivery, installation and maintenance of furniture and associated items at our Kerry Campuses namely MTU Kerry North Campus and MTU Kerry South Campus (MTU-KY). MTU-KY is looking to establish a panel of a maximum of 3 furniture suppliers to supply, deliver, install and maintain furniture at our campuses based in Tralee Co. Kerry. Full details are contained in the tender documentation attached to this Contract … View the procurement »
Mentioned suppliers: Blackrock Office & Stationery Supplies... Hunt Office Technology Ltd Stakelums
2023-04-07   Ballinasloe Town Hall Refurbishment (Ballinasloe Town Hall CLG)
Refurbishment of Ballinasloe Town Hall Theatre to include cleaning and repointing of stonework, repairs to chimneys, installation of new downpipes. Separately, the installation of new double glazed sash windows, timber doors and internal shuttering. View the procurement »
2023-03-21   South East Greenway – Contract C – Ferrybank to Curraghmore Kilkenny (Wexford County Council)
This project involves the construction of Contract C which mainly entails 5.5kms of greenway (Lot 5a) from the Ferrybank, Kilkenny to Curraghmore, Kilkenny. This is part of the South East Greenway which involves the construction of circa 24kms of greenway from Waterford to New Ross Summary of works include; • Construct the Greenway Lot 5a Section pavement in accordance with Works Requirements, along with all ancillary works including site clearance, landscaping, finishes, fixtures and fittings, drainage, … View the procurement »
2023-02-20   Upgrade (LeCheile Donnycarney Community & Youth Centre CLG)
Replacement of all external windows with double glazed high spec upvc. Replace of all external doors, both DG aluminium and solid fire doors. Replace current boilers with air-to-water heat pumps or most suitable for the premises. BMS upgrade Replace current lighting with low energy lights. Installation of 11kW solar pv panels Replace fixed speed circulation pumps with variable speed pumps View the procurement »
2023-02-07   The Supply and Delivery of Carpentry/Joinery Materials & Equipment for LWETB (Longford and Westmeath Education and Training Board)
LWETB wish to award a contract to supplier(s) for the Supply and Delivery of Carpentry/Joinery Materials & Equipment. The framework agreement will be for two (2) years, with the option to extend for further periods of one (1) year, subject to a maximum of four (4) years in total, subject to satisfactory performance, business needs and budgetary constraints. View the procurement »
2022-12-07   Multi-Party Framework Agreement for the Installation and Maintenance of Existing and New Power Operated Gates in... (South Dublin County Council)
Multi-Party Framework Agreement for the Installation and Maintenance of Existing and New Power Operated Gates in South Dublin County Council View the procurement »
2022-11-01   Schools Energy Pathfinder Design & Build Programme 2023/24 (Limerick and Clare Education and Training Board)
This project is part of continuing series of Pilot Schemes focusing on Schools Energy Upgrades whose objective is to deliver significant improvements works to a two (2) schools during 2023/24 (primarily during school holiday periods). The shared objectives of the programme are to implement a range of energy efficiency measures in a number of typical schools to achieve: 50% reduction in Carbon Emissions 50% reduction in Direct Carbon Emissions 50% reduction in Primary Energy BER Grade B Renewable Heat – … View the procurement »
2022-10-25   Multi-party Framework Agreement for Pavement and Associated Works in 2023 for Tipperary County Council (Tipperary County Council)
Multi-party Framework Agreement for Pavement and Associated Works in 2023 for Tipperary County Council View the procurement »
2022-10-06   Main Contractor Works Package for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the Works Contract (including other services) for the Old Library Redevelopment Project (OLRP). The project concerns the construction works located at the University’s city centre campus. The contracting Authority intends to invite 6 candidates to tender, please note that the contracting authority reserves the right to invite at least 6, subject to the number qualifying. View the procurement »
2022-05-06   Multi-Supplier Loose Furniture Framework Agreement (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, The University of Dublin seeks to establish a Multi-supplier framework for Supply, delivery and installation of Loose Furniture to fulfill our furniture requirement. These suppliers shall be capable of providing a broad range of goods under the category of loose furniture. These goods will be procured at various intervals during the academic year by our various departments on campus. Loose furniture may also be procured by departments at our sites adjacent to our city center … View the procurement »
Mentioned suppliers: Albany Office Supplies Ltd Axis Group Ltd Codex Limited Farrell Brothers (Ardee) Ltd Joseph Flanigan & Son Ltd Matrix Furniture Milner Office Furniture
2022-04-05   Tender for the Supply, Maintenance and Installation of Blinds for MTU (Munster Technological University)
Munster Technological University is seeking tenders from competent contractors for the supply, maintenance and installation of Blinds to the MTU. MTU Cork & MTU Kerry is seeking to appoint a contractor for the Supply, Maintenance and Installation of Blinds for Lot 01 MTU Cork Campuses and Lot 02 MTU Kerry Campuses. Contractors may apply for one or both lots. Full details are contained in the tender documentation attached to this Contract Notice or which can downloaded from the Irish Government … View the procurement »
Mentioned suppliers: ACME Blinds & Shutters Blackwater Blinds
2022-03-02   Framework For Deep Energy Retrofits 2022-2025 (Galway County Council)
Galway County Council is seeking interested parties to apply for placement on a Deep Energy Retrofit Framework. Participants on this framework will be invited to tender for deep energy retrofit works on Galway County Council properties for the duration of the framework agreement. View the procurement »
2022-01-17   Powered Gates and Shutters (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing Powered Gates, Shutters, Doors and Barriers. The requirements under this contract will include; planned preventative maintenance, unplanned repair works, installation of new and certificate submissions to IE Sharepoint document library. View the procurement »
2021-12-09   WCC372021 Multiparty Framework for Energy Retrofit of a number of Social Housing Units for Wicklow County Council (Wicklow County Council)
WCC372021 Multiparty Framework for Energy Retrofit of a number of Social Housing Units for Wicklow County Council View the procurement »
2021-12-06   Limerick City and County Council, Multiparty Framework Agreement, Civil Works (Limerick City and County Council)
Limerick City and County Council (LCCC) acting as a purchasing body is setting up a multi-supplier Framework Agreement ("the Framework Agreement") for the provision of Civil Works in relation to the development of Major National Road Schemes (Capital Cost >€20m) in which the Council is involved in within the City and County of Limerick. It is the intention that LCCC will procure mini-competitions (calls-offs) from the Framework for civil enabling works contracts. Detailed technical requirements will be … View the procurement »
Mentioned suppliers: Clare Civil Engineering Murphy International Limited Priority Construction Ltd Sorensen Civil Engineering Ltd Ward & Burke Construction Ltd.
2021-11-26   20/132 - Framework for the Design, Supply & Install of SR3 Rated Doors (Ervia)
New doors are required for approximately 56 sites, all in the ROI. Approximately 200 doors are need in total across these sites (approximately 100 single doors and 100 double doors). New doors are to be steel and rated to Loss Prevention Standard (LPS) 1175 SR3. Where doors are being replaced, the ventilation in the new doors shall, as a minimum, match the existing doors. A PSCS will also be required to be appointed for the entirety of the works View the procurement »
2021-06-22   Multi Supplier Framework Agreement for the Supply of Construction Consumables for Waterford and Wexford Education... (Waterford and Wexford Education and Training Board)
This public procurement competition relates to the establishment of a Multi Party Framework (‘Framework’) for the provision of construction consumables primarily in the WWETB training centres. WWETB run apprenticeship training programmes for wood Manufacturing and finishing, plumbing, plastering, carpentry and joinery and brick and stonelaying under Phase 2 of the apprentice training programmes. Other courses include the construction ground work skills course under full-time training courses at Waterford … View the procurement »
2021-06-18   Supply and Installation of Parasols with Heating and Lights at Waterford City (ProcRef 21/297) (Waterford City and County Council)
Supply and installation of parasols with heating and lights at Waterford City (ProcRef 21/297). View the procurement »
2021-06-08   Supply and Installation of Parasols and Awnings in Cork City (Cork City Council)
Supply and installation of Parasols and Awnings in Cork City on the following four streets: Caroline Street, Union Quay, Pembroke Street and Beasley Street. View the procurement »
Mentioned suppliers: Acme Blinds
2020-12-19   Rubrics Building and Chief Steward’s House Main Contractor Works for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the works contract (including other services). The project concerns the construction works located at the University’s city centre campus. The contracting authority intends to invite 5 candidates to tender, please note that the contracting authority reserves the right to invite at least 5, subject to the number qualifying. View the procurement »
Mentioned suppliers: Clancy Project Management Limited
2020-10-30   PQQ-Single Party Framework for the Provision Kitchen Repairs and Maintenance Services (Bus Eireann/Irish Bus)
Bus Éireann (BE) is looking for a service provider to manage kitchen repairs services at our depot nationwide. The company operates from 17 regional depots. The tender is divided into two lots. View the procurement »
2020-10-07   Extension (E01) and Partial Refurbishment Block (B) (IT Sligo)
The works comprise an new four-storey Extension (E01) to Block (B) together with partial refurbishment of the existing building. The proposed extension will be circa 3 950 m with refurbishment involving approximately 430 m. Accommodation will comprise mixed teaching and research facilities including undergraduate and postgraduate science laboratories, clean room, PC laboratories, project rooms, classrooms, research facilities, online leaning facilities together with staff and ancillary accommodation and … View the procurement »
Mentioned suppliers: Tracey Brothers Ltd
2020-10-03   Reserved Specialists for Lot 1 Dental Cabinetry Installations and Lot 2 Clinical Skills Equipment Storage Systems... (University College Cork (UCC))
UCC is inviting expressions of interests for reserved specialists for dental cabinetry and clinical skills storage systems. The project consists of the construction of a new circa 9 480 m, Dental education and research building. The building will be primarily used as a dental school with ancillary education, research and innovation facilities including a central sterile services department, roof top plant enclosure and support service areas. Lot 1: Comprises installation of Dental Cabinetry comprising … View the procurement »
2020-04-30   Supply of Storage Infrastructure and Professional Advice Regarding Efficient Storage Infrastructure Solutions,... (National Museum of Ireland)
NMI requires a specialist storage infrastructure supplier offering a wide range of storage solutions such as shelving, racking, cabinets, drawers and other options to meet its storage requirements. Due to the complex nature of the NMIs storage requirements, we require services from storage infrastructure providers to ensure cost-effective and readily-available solutions can be provided. View the procurement »
Mentioned suppliers: Storage Systems Ltd
2020-01-22   Multi Party Framework Agreement for the Provision of Energy Efficiency Retrofitting in Dublin City Council Housing... (Dublin City Council)
Dublin City Council (DCC) is seeking to establish a multi-party framework agreement for the procurement of works contractors for term maintenance and refurbishment work associated with the energy efficiency retrofit to Dublin City Councils housing units in the Dublin City Council Areas marked out as Lots 1 to 12. Tenderers can apply for inclusion in one, some, or all lots. Each lot is allocated 2 000 000 EUR for 2 years. It is envisaged that each lot will involve the allocation of an average of 40 houses … View the procurement »
Mentioned suppliers: Bayview Contracts Ltd Bluebuild Energy Ltd Complete Insulations & Energy Upgrades Limited Complete Insulations and Energy Upgrades Ltd Damien Ryan Contracts Ltd Derchil Ltd Energy Action Ltd Hometherm Insulation Ltd National Retrofit and Construction Services Ltd Retrofit Design Ltd Weslin Construction Weslin Construction Ltd Weslin Construction Ltd,
2019-09-06   Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: A. the change of use of the Phase 1 sports and community building to a library and community building; B. refurbishment of the existing sports building to create a new library; C. the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-09-06   Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: (a) the change of use of the Phase 1 sports and community building to a library and community building; (b) refurbishment of the existing sports building to create a new library; (c) the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-09-02   GMIT Multi-Party Framework for Supply, Delivery and Installation of Bespoke Furniture in Capital Projects Fit-Out Areas (Galway Mayo Institute of Technology)
GMIT intends to establish a multi-party framework furniture for the supply, delivery and installation for GMIT capital projects with different design specification for new-build fit-out areas. The maximum duration of the framework agreement will be four (4) years subject to satisfactory annual review of performance. Please refer to the tender documents for more details. View the procurement »
Mentioned suppliers: Complete Business Interiors Ltd
2019-08-29   Mechanical, Electrical and Building Services Maintenance Panel for the GRETB (Galway Roscommon Education and Training Board)
The GRETB intends to establish multi-supplier framework agreements for professional specialist mechanical, electrical and building maintenance services across their property portfolio. The framework agreement will be divided into the following three (3) lots: — Lot 1: Mechanical Services, — Lot 2: Electrical Services; and — Lot 3: Building Maintenance Services. View the procurement »
Mentioned suppliers: ACM Roofing Teo C&N Heating Services Ltd Christopher Mullins Electrical Services Ltd Cosier Homes Ltd Dotoole Electrical DWS Facility Services. FES Fusion Engineering Services Ltd Finna Construction Ltd FVG Construction and Maintenance Ltd Kellman Developments Ltd Martin Fahy Heating and Plumbing Neylons Facility Management
2019-04-01   Multi Party Framework Agreement for replacement of Doors and Windows in Local Authority Housing with an Initial... (South Dublin County Council)
It is proposed to undertake the replacement of doors and windows in Social Housing Units in the South Dublin County Council administrative area. Some houses will require all windows and doors to be replaced, while other houses will only have some of the windows or doors replaced. South Dublin County Council intends to establish a Multi-Party framework using the restricted procedure on eTenders to invite expressions of interest for pre-qualification. Works will include, but are not limited to, the … View the procurement »
Mentioned suppliers: Bann Ltd Brian M Durkan and Co. Ltd
2019-02-25   Construction of 12 Houses and Ancillary Works at Bun Daire Estate, Kinnegad, Co. Westmeath, Ireland (Westmeath County Council)
Construction of 12 houses and ancillary works at Bun Daire estate, Kinnegad, Co. Westmeath, Ireland. View the procurement »
2019-02-25   Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM. The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise: Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the … View the procurement »
2018-11-30   Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas. The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in … View the procurement »
2018-08-11   Phase II Works (The Ballinglen Arts Foundation)
Supply and fit of floor finishes (polished concrete), supply and fit passenger lift, Supply and fit of air-to-water heading system, together with other finishes including second fix joinery, painting and decorating and external landscaping works. View the procurement »
2018-01-31   Testing, maintenance, replacement and support services for Powered Gates, Shutters, Doors and Barriers (Iarnrod Eireann-Irish Rail)
Note: This is 1 of 2 notices that will replace the now cancelled OJEU Notice 2017/S 202-416847 published on 20.10.2017 (Ref: 6966 - Maintenance, repairs and replacement works on existing specialist systems). Iarnród Éireann requires the services of a suitably qualified contractor to enter into a single party contract to undertake nationwide maintenance, repairs and replacement works on existing powered gates, shutters, doors and barriers. The proposed duration of the contract is 3 years with the option … View the procurement »
Mentioned suppliers: Desco Fingal Engineering Ltd
2017-12-15   Redevelopment of Leopardstown Racecourse (Horse Racing Ireland (HRI))
Leopardstown Club Ltd wishes to appoint a contractor for the redevelopment of the following items at Leopardstown Racecourse, Foxrock, Dublin: — Racing hall & street area — Level 0 — Grandstand, — Museum bar and toilet block — Level 1 — Grandstand, — Toilet blocks & terrace – Level 2 — Grandstand, — Window replacement – Level 3 — Grandstand, — Conversion of former Saddling stalls, — Children's play area, — Prize winners podium, — New Saddling stalls and PreParade ring, — New weighroom building, — New … View the procurement »
Mentioned suppliers: Duggan Brothers Contractors Ltd
2017-10-27   Multi Party Framework for the Provision of Unplanned Building Maintenance to Bus Eireann (Bus Eireann/Irish Bus)
The Contracting Authority proposes concluding a Framework Agreement for the provision of unplanned building maintenance services to a number of sites, accommodation units and facilities located throughout the Republic of Ireland Bus Éireann has a requirement for the following six service disciplines on an on-demand basis: Lot 1. Routine building modifications and maintenance Lot 2. Electrical services, supply, installation and maintenance Lot 3. Carpentry and joinery services Lot 4. Building heating and … View the procurement »