Procurements: Electrical installation work of heating and other electrical building-equipment (page 4)
2018-11-20Electrical Balance of Plant — Cloncreen Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a 21 turbine wind farm and associated infrastructure at Cloncreen bog in eastern Co. Offaly, approximately 4.5 kilometres southwest of Edenderry and 4 kilometres east of Bord Na Móna’s 84 MW Mount Lucas wind farm. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme (RESS) auction in either 2019 or 2020. Expressions of interest are being …
View the procurement » Mentioned suppliers:H&MV Engineering
2018-10-02Kanturk National School — Pre-qualification for Selection as Electrical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 sqm on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil …
View the procurement »
2018-08-22Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in …
View the procurement »
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:Tim Kelly Electrical
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:T Bourke
2018-01-05Establishment of a Single Operator Framework for Enabling Works; The National Maternity Hospital at St Vincent's... (Health Service Executive (HSE))
The works relate to the creation of a single operator to deliver a series of enabling works in connection with The NMH relocation to the campus of SVUH. Such works will include but are not limited to, the following:
1) The provision of temporary service supplies including laboratory gases, N2O, LTHW, etc., and all associated works;
2) The provision of permanent service supplies including M, LV, FA, Oil, NG, Comms, etc., and all associated works;
3) Decommissioning of existing services and associated …
View the procurement »
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-12-22Electrical Engineering — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Electrical Specialist... (Curragh Racecourse Ltd)
The electrical services contract comprises of the following systems; i) Electrical power distribution, incorporating medium/low voltage switchgear, incorporating uninterruptible power supplies, generators, metering and fault detection, ii) General and emergency lighting, incorporating a DALI addressable lighting control system, iii) Information and communication technology structured cabling, fire detection and alarm system incorporating public address/voice evacuation, iv) General services and small …
View the procurement » Mentioned suppliers:Mercury Engineering
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd
2016-07-0616/085 — Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract (Irish Water)
As part of the Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract, Irish Water on behalf of Ervia plans to undertake the following:
— Construction of a new 80MLD Water Treatment Plant (WTP);
— Upgrade of the Existing Vartry Reservoir Intake including new siphon pipework;
— Increase the capacity of the existing Vartry Reservoir Spillway;
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated …
View the procurement » Mentioned suppliers:Veolia Water Ireland Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately 17 000 m2. The building will provide direct linkages to the existing hospital buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities must remain uninterrupted at all times during the Works.
View the procurement »
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin; Mechanical Services... (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including
en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately
17 000 m2. The building will provide direct linkages to the existing hospital
buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities
must remain uninterrupted at all times during the Works.
View the procurement »
2016-02-23Blanchardstown Regional Drainage Scheme (BRDS) 9C Sewer Duplication and Storage (Ervia)
— Approximately 3.2 km of pipeline (diameters ranging from approximately
1 500 mm to 1 800 mm) installed using trenchless techniques
— Underground storage tanks with an approximate total capacity of 30 000 m³ to cater for stormwater flows and flow balancing
— New Pump Station to lift flows (approximately 350l/s) from the proposed sewer to the existing sewer
— Stormwater return pumps to return flows from the storage tanks to the existing
9C Sewer (approximately 320/ls)
— Diversion of the existing live 1 …
View the procurement »
2016-02-18Sandyford Depot Extension Works (Transport Infrastructure Ireland (TII))
The Employer requires a contractor with expertise in civil engineering, structural engineering, building works, building services, traction power and overhead conductor system engineering works and track works for the purposes of carrying out the following activities.
View the procurement »
2016-02-1515/133 — Liffey Siphons Rehabilitation Project (Ervia)
Design and Build Contract to deliver:
The scheme provides for the rehabilitation of the 3.4 km of twin 900 mm diameter
4 sewers including;
— the construction of a new buried inlet penstock chamber;
— a new buried gatevalve chamber;
— repair works to 2 underground tunnels and 5 access shafts for the Liffey
Siphons;
— associated minor works to hatch-boxes;
— the replacement of 2 nr 900 mm diameter flow-meters;
— demolition of the above ground portion of the existing outlet chamber;
— the removal and …
View the procurement » Mentioned suppliers:Terra Pfeiffer JV
2016-02-1015/159 — Ballyshannon Regional Water Supply Scheme Contract No 1 — Water Treatment Plant and Primary Network Design... (Ervia)
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains.
The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an …
View the procurement »
2016-01-14Thurles Regional Water Supply Scheme Contract No. 2 — Design Build Operate Water Treatment Plant (Ervia)
Irish Water on behalf of Ervia plan to undertake the development of a Water Treatment Plant (WTP) together with associated works as part of the Thurles Regional Water Supply Scheme Contract No. 2 — Design Build Operate Water Treatment Plant.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Glan Agua
2015-09-25Mechanical and Electrical Contractors Frameworks (daa plc)
The Contracting Authority proposes to set up a non-exclusive framework agreement with a number of Mechanical and Electrical Engineering Contractors for projects at Dublin Airport for the next 4 years (with an option to extend for 1 further year) subject to ongoing satisfactory performance and workload.
This RFT process is to identify suitable Tenderers for consideration for inclusion on the Framework Panel/s.
View the procurement »
2015-09-04Enniscorthy Sewerage Scheme Phase 3: Contract 1 — Wastewater Treatment Plant Upgrade (Ervia)
Irish Water plan to undertake the following works:
— Refurbishment/Upgrade/Expansion of the existing Enniscorthy Wastewater Treatment Plant (WwTP).
— Refurbishment/Upgrade of the existing infrastructure at St Johns Pumping Station and Promenade Pumping Station.
— Provision of storm-water handling facilities.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Response/Ward and Burke JV
2015-08-27Works Specialists with Design Input for the new children‘s hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
— The demolition of all buildings on the site of the new children's hospital;
— Construction of a new children's hospital building and associated helipad;
— A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
— Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps …
View the procurement »