Design & Build Contract for the refurbishment of the existing Poolbeg Oil Storage Facility
Design and built contract for the upgrade of the existing Poolbeg Tank farm to meet current regulations for the long term strategic storage of Distillate products.
The site is ship fed from a jetty.
Woks includes but is not limited to Repair of existing Tankage, Installation of new pipe work and associated equipment, Installation of new loading gantry, drainage and control room.
Deadline
The time limit for receipt of tenders was 2016-07-08.
The procurement was published on 2016-05-18.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?
What?
Procurement history
Date |
Document |
2016-05-18
|
Contract notice
|
2016-12-28
|
Contract award notice
|