Procurements: Electricity supply installations
>20 archived procurements
Electricity supply installations have been procured by organizations such as Health Service Executive (HSE), Iarnrod Eireann-Irish Rail, and National Oil Reserves Agency.
Historically, suppliers within this area have been Denis Moriarty The Kerries Limited, Dolan Demolition and Civil Engineering, ESB Generation & Wholesale Markets, Huntstown Power Company Limited, KN Network Services (Ire) Ltd, Manley Construction Limited, MD Electrical Installations Ltd, SGS Ireland Limited, Successful Applicants listed, and TLI Group Ltd.
- Construction work (>20 new procurements)
Recent procurements of electricity supply installations in Ireland
2026-01-30
Supply and Installation of Electric Work Van, Charging Infrastructure, and Garden Maintenance Equipment (County Kildare Leader Partnership CLG)
County Kildare LEADER Partnership have been awarded EU Just Transition Funding to deliver Kildare’s Green Upskilling Programme. This proposed programme seeks to empower marginalised individuals in the Athy and Clane-Maynooth regions, particularly those with low education and limited employment opportunities, by delivering a bespoke training programme focused on low-carbon, circular economy practices. This Request for Tender focuses on the expansion of the fleet of work vehicles in operation in Kildare … View the procurement »
County Kildare LEADER Partnership have been awarded EU Just Transition Funding to deliver Kildare’s Green Upskilling Programme. This proposed programme seeks to empower marginalised individuals in the Athy and Clane-Maynooth regions, particularly those with low education and limited employment opportunities, by delivering a bespoke training programme focused on low-carbon, circular economy practices. This Request for Tender focuses on the expansion of the fleet of work vehicles in operation in Kildare … View the procurement »
2025-07-04
IWA Solar Farm (Connaught Airport Development Company Ltd)
This project involves the design, construction, and commissioning of a new Solar Photovoltaic Farm to supply 1MVA of renewable energy directly to Ireland West Airport. The initiative supports the airport’s sustainability goals by reducing reliance on grid electricity and lowering carbon emissions. The contract will be delivered under a Design and Build model, followed by a 24month Operation and Maintenance phase to ensure optimal performance and reliability of the system. The scope of works includes Full … View the procurement »
This project involves the design, construction, and commissioning of a new Solar Photovoltaic Farm to supply 1MVA of renewable energy directly to Ireland West Airport. The initiative supports the airport’s sustainability goals by reducing reliance on grid electricity and lowering carbon emissions. The contract will be delivered under a Design and Build model, followed by a 24month Operation and Maintenance phase to ensure optimal performance and reliability of the system. The scope of works includes Full … View the procurement »
2025-05-06
Electrical upgrade works Rochfortbridge Community Centre (Rochfortbridge Community Centre CLG)
Electrical upgrade works Rochfortbridge Community Centre View the procurement »
Electrical upgrade works Rochfortbridge Community Centre View the procurement »
2024-04-30
Tipperary County Council Public Lighting Maintenance Contract 2024 (Tipperary County Council)
TIPPERARY COUNTY COUNCIL PUBLIC LIGHTING MAINTENANCE AND RELATED SERVICES CONTRACT 2024. This Maintenance Contract shall operate for a twenty-four month period commencing on the date of the contract signing between the successful Contractor and the Employer. An option will be included to allow for two further 12-month extensions (or part thereof) up to a maximum contract period of 4 years, on the same terms and conditions, subject to the Contracting Authority’s obligations at law. The exercise of this … View the procurement »
TIPPERARY COUNTY COUNCIL PUBLIC LIGHTING MAINTENANCE AND RELATED SERVICES CONTRACT 2024. This Maintenance Contract shall operate for a twenty-four month period commencing on the date of the contract signing between the successful Contractor and the Employer. An option will be included to allow for two further 12-month extensions (or part thereof) up to a maximum contract period of 4 years, on the same terms and conditions, subject to the Contracting Authority’s obligations at law. The exercise of this … View the procurement »
2023-06-13
23/015 - National Photovoltaic Renewable Energy Programme (Uisce Éireann)
The scope of the Framework will consist of the design, supply, install, commission and maintenance of photovoltaic systems (PV) including battery storage for Uisce Éireann at selected Water and Wastewater Treatment Facilities nationally. At present it is proposed to appoint one contractor to each of the following 4 regions. • Northwest, • East Midlands, • Southeast • Southwest This PQQ sets out certain minimum requirements, but some work packages may require higher minimum requirements (including the … View the procurement »
The scope of the Framework will consist of the design, supply, install, commission and maintenance of photovoltaic systems (PV) including battery storage for Uisce Éireann at selected Water and Wastewater Treatment Facilities nationally. At present it is proposed to appoint one contractor to each of the following 4 regions. • Northwest, • East Midlands, • Southeast • Southwest This PQQ sets out certain minimum requirements, but some work packages may require higher minimum requirements (including the … View the procurement »
2023-05-02
Electric Vehicle Chargers for Inland Fisheries Ireland (Inland Fisheries Ireland)
Request for Tenders dated 28/04/2023 Single Supplier Framework for the provision of Single Socket 7 kW, 22 kW & 75 kW Base Chargers for Inland Fisheries Ireland View the procurement »
Request for Tenders dated 28/04/2023 Single Supplier Framework for the provision of Single Socket 7 kW, 22 kW & 75 kW Base Chargers for Inland Fisheries Ireland View the procurement »
2022-09-27
ESB Upgrade Package 1 (Iarnrod Eireann-Irish Rail)
The objectives of the works for this project are to provide 3 phase power (49kVA) to 8 Irish Rail train station sites in various locations around the network View the procurement »
The objectives of the works for this project are to provide 3 phase power (49kVA) to 8 Irish Rail train station sites in various locations around the network View the procurement »
2022-07-26
Development of a new 60 Bed, two-storey Community Nursing Unit and associated site and development works within the... (Health Service Executive (HSE))
The proposed development comprises a two storey community nursing unit (5,100m2) with 60 residential en-suite bedrooms, including a 10 bed dementia unit in the single storey block, with associated support accommodation including dining rooms, residents areas, visitors room and family overnight room, treatment rooms, hairdresser’s salon, internal courtyards and terraces. The site works include a new access road, car parking, site services, electrical sub-station, waste compound, hard and soft landscaping, … View the procurement »
The proposed development comprises a two storey community nursing unit (5,100m2) with 60 residential en-suite bedrooms, including a 10 bed dementia unit in the single storey block, with associated support accommodation including dining rooms, residents areas, visitors room and family overnight room, treatment rooms, hairdresser’s salon, internal courtyards and terraces. The site works include a new access road, car parking, site services, electrical sub-station, waste compound, hard and soft landscaping, … View the procurement »
2022-04-25
Appointment of a Safety Supervisory Body (SSB) to operate the CRU’s Safe Electric and Registered Gas Installer (RGI)... (Commission for Regulation of Utilities)
The Commission for Regulation of Utilities (CRU) is Ireland’s independent energy and water regulator and has a wide range of economic, customer protection and safety responsibilities in the energy and water sectors. The CRU intends to appoint a single SSB to cover the operations of both the Electrical Safety Supervisory Body (ESSB) and the Gas Safety Supervisory Body (GSSB). The ESSB and the GSSB operate and manage the CRU’s statutory regulatory safety schemes for electrical contractors and gas … View the procurement »
The Commission for Regulation of Utilities (CRU) is Ireland’s independent energy and water regulator and has a wide range of economic, customer protection and safety responsibilities in the energy and water sectors. The CRU intends to appoint a single SSB to cover the operations of both the Electrical Safety Supervisory Body (ESSB) and the Gas Safety Supervisory Body (GSSB). The ESSB and the GSSB operate and manage the CRU’s statutory regulatory safety schemes for electrical contractors and gas … View the procurement »
2022-03-02
Supply & Install of EV Chargers (Iarnrod Eireann-Irish Rail)
The supply, installation and commissioning of twin 50Kw Taxi charger points and associated site infrastructure View the procurement »
The supply, installation and commissioning of twin 50Kw Taxi charger points and associated site infrastructure View the procurement »
2021-11-30
Kilmacrennan Road, Letterkenny, Co. Donegal. Development of a new 110 Bed Community Nursing Unit (Health Service Executive (HSE))
The development is for a new 110 bed Community Nursing Unit of gross floor area c. 9400sq.m. with associated landscaping and parking at Kilmacrennan Road, Knocknamona, Letterkenny to provide a mixture of long stay residential and short term rehabilitation/ step down beds. The development also includes a rehabilitation unit to provide services to residents and day patients. View the procurement »
The development is for a new 110 bed Community Nursing Unit of gross floor area c. 9400sq.m. with associated landscaping and parking at Kilmacrennan Road, Knocknamona, Letterkenny to provide a mixture of long stay residential and short term rehabilitation/ step down beds. The development also includes a rehabilitation unit to provide services to residents and day patients. View the procurement »
2021-10-11
Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022 EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from … View the procurement »
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022 EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from … View the procurement »
2019-09-06
Samuel Beckett Civic Campus Phase 2: Electrical Services (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on phase 1 and will include the following: A. The change of use of the Phase 1 sports and community building to a library and community building; B. Refurbishment of the existing sports building to create a new library; C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s … View the procurement »
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on phase 1 and will include the following: A. The change of use of the Phase 1 sports and community building to a library and community building; B. Refurbishment of the existing sports building to create a new library; C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s … View the procurement »
2018-03-28
Multi-Contractor Framework Agreement for the Deployment of Smart Electricity Meters (Electricity Supply Board (ESB))
Electricity Supply Board proposes procuring the implementation and operation of an end-to-end service to exchange electricity meters with Smart Electricity Meters (SEMs) and the performance of remedial works to the meter installation at premises, under a multi-contractor Framework Agreement. As part of these works it is envisaged that the framework contractors will provide an end-to-end service to ESB from deployment planning and mobilisation, customer engagement, customer contact and appointment … View the procurement »
Electricity Supply Board proposes procuring the implementation and operation of an end-to-end service to exchange electricity meters with Smart Electricity Meters (SEMs) and the performance of remedial works to the meter installation at premises, under a multi-contractor Framework Agreement. As part of these works it is envisaged that the framework contractors will provide an end-to-end service to ESB from deployment planning and mobilisation, customer engagement, customer contact and appointment … View the procurement »
2017-05-26
Electrical Services for Teagasc Campus (Moorepark, Fermoy, Co. Cork) (Teagasc)
This public procurement exercise relates to the provision of Electrical Services for the Teagasc Campus (Moorepark, Fermoy, Co. Cork). Additional information is available in the attached documentation. View the procurement »
This public procurement exercise relates to the provision of Electrical Services for the Teagasc Campus (Moorepark, Fermoy, Co. Cork). Additional information is available in the attached documentation. View the procurement »
2017-04-26
Electrical re-wire of Coolmine Community School (Coolmine Community School (Clonsilla))
Electrical re-wire of Coolmine community school and associated builders works. View the procurement »
Electrical re-wire of Coolmine community school and associated builders works. View the procurement »
2017-01-09
Multi-Party Framework Agreement for Electrical Services for Local Authorities (Kerry County Council)
The Local Government Operational Procurement Centre (LGOPC) acting as a Central Purchasing Body (CPB) under the auspices of Kerry County Council is coordinating the establishment of a framework of contractors on behalf of Local Authorities to establish a multi-party framework agreement for the provision of Electrical Services. View the procurement »
The Local Government Operational Procurement Centre (LGOPC) acting as a Central Purchasing Body (CPB) under the auspices of Kerry County Council is coordinating the establishment of a framework of contractors on behalf of Local Authorities to establish a multi-party framework agreement for the provision of Electrical Services. View the procurement »
2016-05-18
Design & Build Contract for the refurbishment of the existing Poolbeg Oil Storage Facility (National Oil Reserves Agency)
Design and built contract for the upgrade of the existing Poolbeg Tank farm to meet current regulations for the long term strategic storage of Distillate products. The site is ship fed from a jetty. Woks includes but is not limited to Repair of existing Tankage, Installation of new pipe work and associated equipment, Installation of new loading gantry, drainage and control room. View the procurement »
Design and built contract for the upgrade of the existing Poolbeg Tank farm to meet current regulations for the long term strategic storage of Distillate products. The site is ship fed from a jetty. Woks includes but is not limited to Repair of existing Tankage, Installation of new pipe work and associated equipment, Installation of new loading gantry, drainage and control room. View the procurement »
2015-10-16
Disinvestment and Tank Cleaning Works (National Oil Reserves Agency)
These works relate to the works associated with the disinvestment of the existing infrastructure of the existing ESB Poolbeg tank farm complex which will be utilised for the strategic storage of distillate fuels by NORA. View the procurement »
These works relate to the works associated with the disinvestment of the existing infrastructure of the existing ESB Poolbeg tank farm complex which will be utilised for the strategic storage of distillate fuels by NORA. View the procurement »
2012-11-01
LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows: Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick. Lot 2 Call Out Electrical Maintenance Works – LIT Thurles. Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel. The purpose of the first stage is to obtain information from the applicants to determine their suitability … View the procurement »
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows: Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick. Lot 2 Call Out Electrical Maintenance Works – LIT Thurles. Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel. The purpose of the first stage is to obtain information from the applicants to determine their suitability … View the procurement »
2011-01-19
Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under … View the procurement »
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under … View the procurement »