2025-05-13   9164 Single Supplier Framework Agreement for Design and Build Electrification Contractor for DART+ (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of a Design and Build Electrification Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, โ€ฆ View the procurement ยป
2025-05-13   9163 Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+ (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of a Design and Build Civil and Structural Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, โ€ฆ View the procurement ยป
2025-05-13   9167 Contract for the Design and Build Of Spencer Dock (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Spencer Dock. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service improving capacity in all rail corridors โ€ฆ View the procurement ยป
2025-05-13   9166 Design and Build Rail Systems Contractor for DART (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of a design and build Rail Systems contractor to deliver works on the DART+ Southwest route. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service โ€ฆ View the procurement ยป
2023-03-16   FASTER: PROJECT INFORMATION MEMORANDUM AND PRE-QUALIFICATION QUESTIONNAIRE (PQQ) (Louth County Council)
PROJECT INFORMATION MEMORANDUM AND PRE-QUALIFICATION QUESTIONNAIRE (PQQ) FOR Design, Build and Operate (DBO) contract for the FASTER Project - Provision of Rapid Electric Vehicle Charging Infrastructure along the border counties in Ireland FOR LOUTH COUNTY COUNCIL View the procurement ยป
2018-08-22   Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in โ€ฆ View the procurement ยป
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under โ€ฆ View the procurement ยป