Greenlink Interconnector Project

Greenlink Interconnector Limited

Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in Wales, 170 km is subsea and 28 km is onshore in Ireland.

Deadline

The time limit for receipt of tenders was 2018-10-12. The procurement was published on 2018-08-22.

Who? What? Where?
  • โ€ข Southern โ€บ South-East
  • โ€ข West Wales and The Valleys โ€บ South West Wales
Procurement history
Date Document
2018-08-22 Contract notice
2021-09-22 Contract award notice
Contract notice (2018-08-22)
Object
Scope of the procurement
Title: Electrical machinery, apparatus, equipment and consumables; lighting
Short description:
โ€œGreenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The...โ€    Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Electrical machinery, apparatus, equipment and consumables; lighting ๐Ÿ“ฆ
Additional CPV: Electrical machinery, apparatus, equipment and consumables; lighting ๐Ÿ“ฆ
Place of performance
NUTS region: South-East ๐Ÿ™๏ธ

Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for one lot only
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Utilities entity
Awarding authority name: Greenlink Interconnector Limited
Postal address: Element Power, Unit C Building, 4200 Cork Business Park
Postal town: Cork
Contact
Internet address: http://www.greenlinkinterconnector.eu ๐ŸŒ
E-mail: greenlink.procurement@wsp.com ๐Ÿ“ง
URL for documents: http://www.greenlinkinterconnector.eu/project/suppliers-and-procurement ๐ŸŒ

Reference
Dates
Date dispatched: 2018-08-22 ๐Ÿ“…
Submission deadline: 2018-10-12 ๐Ÿ“…
Publication date: 2018-08-24 ๐Ÿ“…
Start date: 2020-06-30 ๐Ÿ“…
End date: 2023-06-30 ๐Ÿ“…
Identifiers
Notice number: 2018/S 162-371269
Refers to notice: 2018/S 090-204808
OJ-S issue: 162
Additional information

โ€œApplicants wishing to participate should submit their company name, main contact name and main contact email address to Greenlink Procurement Manager at...โ€    Show more
Source: OJS 2018/S 162-371269 (2018-08-22)
Contract award notice (2021-09-22)
Object
Scope of the procurement
Short description:
โ€œGreenlink Interconnector Limited is developing a 500MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The...โ€    Show more
Notice metadata
Document type: Contract award notice
Nature of contract: Supplies

Procedure
Type of bid: Not applicable

Contracting authority
Identity
Postal address: 70 Sir John Rogerson's Quay, Dublin 2, Ireland
Postal code: D02R296
Contact
Internet address: http://www.greenlink.ie ๐ŸŒ
E-mail: colin.darcy@greenlink.ie ๐Ÿ“ง

Reference
Dates
Date dispatched: 2021-09-22 ๐Ÿ“…
Publication date: 2021-09-27 ๐Ÿ“…
Identifiers
Notice number: 2021/S 187-487621
Refers to notice: 2018/S 162-371269
OJ-S issue: 187
Source: OJS 2021/S 187-487621 (2021-09-22)