2022-03-29   The Design and Build of 400kV Shannon Estuary Cable Project (Electricity Supply Board ( ESB ))
The Contracting Entity intends to procure a Contract for the Design and Build of 400kV Shannon Estuary Cable Project. The Contracting Entity requires the manufacture and installation of a 400kV land and subsea cable circuit in the South of Ireland. The new 400 kV cable circuit is required to be installed in the Shannon Estuary and adjoining lands to connect Moneypoint 400 kV Gas Insulated Switchgear (GIS) Substation to a 400kV Air Insulated Switchgear (AIS) compound within Kilpaddoge 220 kV … View the procurement »
2021-03-02   HV Cable Design and Build Works Pursuant to a Multi-Contractor Framework Agreement (Electricity Supply Board (ESB))
The contracting entity intends to procure a design and build framework for HV Cable works in the Republic Ireland. It is proposed that the scope of the projects under this framework agreement may include but is not limited to the works as described in section A.1.1 of the PQQ document. View the procurement »
Mentioned suppliers: Circet Networks (Ireland) Limited Energoinvest Reach Active GMC Utilities Group Limited TLI Group Limited T/A Transmission Links...
2020-10-16   HV Cable Design and Build works pursuant to a Multi-Contractor Framework Agreement (Electricity Supply Board (ESB))
The contracting entity intends to procure a design and build framework for HV Cable works in the Republic Ireland. It is proposed that the scope of the projects under this framework agreement may include but is not limited to the works as described in section A.1.1 of the PQQ document. View the procurement »
2018-08-22   Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in … View the procurement »
2017-12-04   Maintenance and Repair Services for 10 KV Medium Voltage Network (University College Dublin (UCD))
University College Dublin (UCD), wishes to appoint a competent service provider to provide maintenance and repair services for 10 KV Medium Voltage network at UCD. Please see tender documents attached and available to download from www.etenders.gov.ie View the procurement »
Mentioned suppliers: O'Hara Engineering Services Ltd
2017-02-23   Specailst Consultancy Framework for Engineering Services (EirGrid plc)
EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity Transmission System Assets. EirGrid intends to establish a Framework for the provision of these services using the following Lots: — Lot 1: Advice on Project Feasibility — Lot 2: Project Consultant — Lot 3: Landowner Engagement — Lot 4: Client Engineering — Technical Authority and Maintenance of the Transmission Assets — Lot 5: Managed Services — Project Management and … View the procurement »
Mentioned suppliers: AECOM Ireland Limited Atkins ESB International Jacobs Engineering Ireland Ltd Mott Macdonald Ireland Mouchel Ltd RPS Group Limited
2014-06-17   P2402 - Supply & Delivery of Primary Cable (Dublin Airport Authority plc ( DAA ))
This contract involves the setting up of a Single Operator Framework Contract which comprises the supply, delivery and offloading of Primary Cable & any associated equipment for Airfield Ground Lighting projects in Dublin and Cork Airports over the next five years. View the procurement »
2012-07-20   ENQEIR312 - Extra High Voltage (220kV - 400kV) Infrastructure development (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning, consultation and communication services as described below. EirGrid is to undertake major capital investment in the North West of Ireland as part of the Grid25 strategy, this project is also part of the Renewable Integration Development Project (RIDP). This proposed … View the procurement »
Mentioned suppliers: Mott MacDonald
2011-10-31   Electrical contracts relating to Bord Gáis Éireann wind farm development (Bord Gais Eireann)
It is anticipated that the applicants can provide all services outlined in this section. 2.1 Bord Gáis wind farms. It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all … View the procurement »
2011-08-11   Extra High Voltage (400 kV) infrastructure development in the South West of Ireland (EirGrid plc)
The objective of this pre-qualification questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning & consultation services as detailed below. EirGrid is to undertake major capital investment in the South West of Ireland as part of the Grid25 strategy. This proposed scheme shall involve development of a 400 kV circuit of approximately 26 km length between Moneypoint 400 … View the procurement »
2011-06-02   Specialist consultancy framework (EirGrid plc)
EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity transmission system assets. This pre-qualification questionnaire provides a description of the services EirGrid wishes to procure, as well as information about the selection procedure to be used. EirGrid intends to establish a framework for the provision of these services using the following lots; Lot 1: advice on project feasibility – phase 1 development of transmission assets; Lot … View the procurement »
Mentioned suppliers: Various suppliers admitted to the 4... Various suppliers admitted to the...
2011-04-01   Extra High Voltage (110kV – 400kV) Infrastructure development in the South East Region of Ireland (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning, consultation and communications services as detailed below. EirGrid is to undertake major capital investment in the South East region of Ireland as part of the Grid 25 strategy. The proposed scheme shall involve development of Extra High Voltage Electricity Transmission … View the procurement »
Mentioned suppliers: Rps
2011-03-03   Multi supplier framework for wind turbine contracts relating to bord gais wind farm developments (Bord Gais Eireann)
The anticipated scope applicable to the framework includes but is not limited to the following works: — Wind turbine generator supply and commission including associated turbine electrical works and SCADA system. The client may also require any one or combination of, the following additional services under the framework. — Wind turbine foundation design, — Wind turbine foundation construction including concrete bases, excavation to suitable formation level and build up to the required level, — Complete … View the procurement »
Mentioned suppliers: Enercon Gmbh Gamesa Eolica S.L.U. Nordex Uk Ltd Siemens Ltd Vestas
2011-02-28   Multi supplier framework for civil contracts relating to Bord Gáis wind farm development (Bord Gais Eireann)
This pre-qualification questionnaire is issued by Bord Gáis Éireann (“the Client”) for the purposes of providing information to applicants interested in applying to pre-qualify and proceed to the tender stage for the procurement of a framework for the provision of certain civil construction works in connection with the development of wind farms by the client (or any subsidiary of the client). The anticipated scope of civil works applicable to the framework includes but is not limited to the following … View the procurement »
2011-02-11   Combined Cycle Gas Turbine (CCGT) -Great Island Project - Generator 220 kV Cable Connection (Endesa Ireland Limited)
Endesa Ireland wishes to invite expressions of interest for the design, manufacturing, supply and delivery, installation at site, testing and commissioning of the High voltage (HV) cable for the new Combined cycle gas turbine generating station site in Great Island, Co. Wexford (Ireland). All the activities will be carried out according to the relevant IEC Standards. The minimum characteristics required are: Insulation material XLPE triple extruded. Material and section of the conductor mm2 CU / 2 … View the procurement »
Mentioned suppliers: NKT CABLES GMBH
2011-01-13   Engineering environmental, planning and communications services (EirGrid plc)
Provision of project management, engineering, environmental, planning and communications services for further information please see the information memorandum and PQQ document attached to the notice on www.e-tenders.gov.ie. Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=191877. View the procurement »
Mentioned suppliers: Tobin Consulting Engineers