EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity transmission system assets. This pre-qualification questionnaire provides a description of the services EirGrid wishes to procure, as well as information about the selection procedure to be used. EirGrid intends to establish a framework for the provision of these services using the following lots; Lot 1: advice on project feasibility โ phase 1 development of transmission assets; Lot 2: project consultant - phase 2 development of transmission assets; Lot 3: landowner engagement โ phase 2 and 3 development of transmission assets; Lot 4: client engineer - phase 3 development of transmission assets. EirGrid anticipates using this framework for predominately small to medium scale projects. Example projects that may be awarded under this framework include: Medium to large scale 110 kV circuit schemes. Small to Medium 220 kV circuit schemes. Small 400 kV circuit schemes. Schemes may require strategic infrastructure board, local authority or no planning approval. New substation schemes of all voltages including air insulated switchgear (AIS) and gas insulated switchgear (GIS) installations. Station and busbar renewals / refurbishments. Other relevant electrical and environmental projects. Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=241102.
Deadline
The time limit for receipt of tenders was 2011-07-11.
The procurement was published on 2011-06-02.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Contract notice (2011-06-02) Object Scope of the procurement
Title: architectural, construction, engineering and inspection services
Quantity or scope:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Architectural, construction, engineering and inspection services๐ฆ
Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for one or more lots
Award criteria
The most economic tender
Contracting authority Identity
Country: Ireland ๐ฎ๐ช
Awarding authority type: Utilities entity
Postal address: Block 2 - The Oval, 160 Shelbourne Road, Ballsbridge
Postal town: Dublin 4
Contact
Internet address: http://www.eirgrid.com๐
E-mail: paul.valentine@eirgrid.com๐ง
Phone: +353 12370200๐
Fax: +353 16615375 ๐
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
(ET Ref:241102).
Object Scope of the procurement
Service category: 12
Notice involves: Establishment_framework_agreement
Short description:
EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity transmission system assets. This pre-qualification questionnaire provides a description of the services EirGrid wishes to procure, as well as information about the selection procedure to be used.
EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity transmission system assets. This pre-qualification questionnaire provides a description of the services EirGrid wishes to procure, as well as information about the selection procedure to be used.
EirGrid intends to establish a framework for the provision of these services using the following lots;
Lot 1: advice on project feasibility โ phase 1 development of transmission assets;
Lot 2: project consultant - phase 2 development of transmission assets;
Lot 3: landowner engagement โ phase 2 and 3 development of transmission assets;
Lot 4: client engineer - phase 3 development of transmission assets.
EirGrid anticipates using this framework for predominately small to medium scale projects. Example projects that may be awarded under this framework include:
Medium to large scale 110 kV circuit schemes.
Small to Medium 220 kV circuit schemes.
Small 400 kV circuit schemes.
Schemes may require strategic infrastructure board, local authority or no planning approval.
New substation schemes of all voltages including air insulated switchgear (AIS) and gas insulated switchgear (GIS) installations.
Station and busbar renewals / refurbishments.
Other relevant electrical and environmental projects.
Lot number: 1
Title of the lot: Advice on project feasibility โ phase 1 development of transmission assets
Short description:
The Candidates delivery of services for lot 1 will support the activities carried out by EirGrid as described in the following paragraphs.
Services to be provided for project feasibility include pre-feasibility and feasibility studies for particular technical solutions; estimation of costs for transmission technology separated into options; programme delivery including estimated planning application periods and construction periods; assessment of environmental sensitivities relating to the project based on preferred route options/corridors or preferred site selection; risk assessment and viability of line or cable routing options; whatever other studies necessary to confirm the feasibility of a line or cable route; and high level estimates for comparison purposes for alternative options.
Services to be provided for project feasibility include pre-feasibility and feasibility studies for particular technical solutions; estimation of costs for transmission technology separated into options; programme delivery including estimated planning application periods and construction periods; assessment of environmental sensitivities relating to the project based on preferred route options/corridors or preferred site selection; risk assessment and viability of line or cable routing options; whatever other studies necessary to confirm the feasibility of a line or cable route; and high level estimates for comparison purposes for alternative options.
Quantity or scope:
To assist with project feasibility, other services to be provided include advice on the appropriate standards, policies and specifications utilised for each transmission asset technology such as one or more of the following areas: high voltage overhead lines; high voltage AC cables; reactive support devices; switchgear; transformers; control and protection; telecommunications; earthing; associated civil, structural and mechanical engineering. Candidates will also carry out assessments and advise EirGrid on new technologies for particular technical solutions. Candidates are requested to clearly state the areas for which they are in a position to provide consulting services.
To assist with project feasibility, other services to be provided include advice on the appropriate standards, policies and specifications utilised for each transmission asset technology such as one or more of the following areas: high voltage overhead lines; high voltage AC cables; reactive support devices; switchgear; transformers; control and protection; telecommunications; earthing; associated civil, structural and mechanical engineering. Candidates will also carry out assessments and advise EirGrid on new technologies for particular technical solutions. Candidates are requested to clearly state the areas for which they are in a position to provide consulting services.
Carry out the duties of PSDP as described in the safety, health & welfare at work (construction) regulations 2006. Ensure that any design or specification prepared for a specific project takes account of the general principles of prevention provided at Schedule 1 to the safety, health & welfare at work Act 2005. Provide to EirGrid the health & safety file for the project in a format and number specified.
Carry out the duties of PSDP as described in the safety, health & welfare at work (construction) regulations 2006. Ensure that any design or specification prepared for a specific project takes account of the general principles of prevention provided at Schedule 1 to the safety, health & welfare at work Act 2005. Provide to EirGrid the health & safety file for the project in a format and number specified.
Additional information about the lots:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Lot number: 2
Title of the lot: Project consultant - phase 2 development of transmission assets
Short description:
The candidates delivery of services for lot 2 will support the activities carried out by EirGrid as described in the following paragraph.
Act as project consultant on development projects. Services to be provided include: project management; cost reporting; programme development and control; advice on and implementation of planning and consent strategy; preparation and management of planning and consent application process through to conclusion of Planning Authorityโs decision (requests for additional information / oral hearing / etc); both the studies for and the production of environmental impact assessment process including appropriate assessment and EIS or environmental impact report as required; advice on and execution of site and route selection; preparation of outline design and functional specifications including high voltage electrical engineering and any relevant civil / structural / mechanical engineering; advice on stakeholder consultation and landowner relations; land acquisition; management of and coordination with landowner engagement consultant.
Act as project consultant on development projects. Services to be provided include: project management; cost reporting; programme development and control; advice on and implementation of planning and consent strategy; preparation and management of planning and consent application process through to conclusion of Planning Authorityโs decision (requests for additional information / oral hearing / etc); both the studies for and the production of environmental impact assessment process including appropriate assessment and EIS or environmental impact report as required; advice on and execution of site and route selection; preparation of outline design and functional specifications including high voltage electrical engineering and any relevant civil / structural / mechanical engineering; advice on stakeholder consultation and landowner relations; land acquisition; management of and coordination with landowner engagement consultant.
Quantity or scope:
Coordinate and manage the process providing services consistent with EirGridโs project development & consultation road map (which EirGrid may update over the course of the framework) included in stages 1 to 4 as set out below:
Stage 1 - information gathering: identify project study area; identify environmental & other constraints; identify feasible options (corridor / sites); publication of stage 1 report; pre-application consultation with planning authority; public and stakeholder consultation on study area and constraints; public and stakeholder consultation on finding of stage 1 report.
Stage 1 - information gathering: identify project study area; identify environmental & other constraints; identify feasible options (corridor / sites); publication of stage 1 report; pre-application consultation with planning authority; public and stakeholder consultation on study area and constraints; public and stakeholder consultation on finding of stage 1 report.
Stage 2 - evaluate options: consideration of all feedback from stage 1; identification of emerging preferred option (route corridor / site); identification of indicative line within corridor or site boundary; identify & meet landowners of indicative line / site (coordination with landowner engagement consultant required); initial survey (coordination with landowner engagement consultant required); publication of stage 2 report; pre-application consultation with planning authority; public and stakeholder consultation on findings of stage 2 report.
Stage 2 - evaluate options: consideration of all feedback from stage 1; identification of emerging preferred option (route corridor / site); identification of indicative line within corridor or site boundary; identify & meet landowners of indicative line / site (coordination with landowner engagement consultant required); initial survey (coordination with landowner engagement consultant required); publication of stage 2 report; pre-application consultation with planning authority; public and stakeholder consultation on findings of stage 2 report.
Stage 3 - confirm design: consideration of all feedback from stage 2; conduct environmental studies and surveys (coordination with Landowner engagement consultant required); confirmation of design of line / site proposal; ongoing engagement with landowners on preferred line route or site (coordination with landowner engagement consultant required); pre-application consultation with planning authority; ongoing public information.
Stage 3 - confirm design: consideration of all feedback from stage 2; conduct environmental studies and surveys (coordination with Landowner engagement consultant required); confirmation of design of line / site proposal; ongoing engagement with landowners on preferred line route or site (coordination with landowner engagement consultant required); pre-application consultation with planning authority; ongoing public information.
Stage 4 - prepare planning application: complete reports and prepare planning application; preparation of environmental impact statement (EIS) or environmental report as required; submit application to planning authority; conclusion of pre-application consultation with planning authority; ongoing public information; public can make submissions to planning authority once application submitted.
Stage 4 - prepare planning application: complete reports and prepare planning application; preparation of environmental impact statement (EIS) or environmental report as required; submit application to planning authority; conclusion of pre-application consultation with planning authority; ongoing public information; public can make submissions to planning authority once application submitted.
Advise on and agree, with EirGrid, the strategy for project consultation with the public, relevant authorities and various interested organisations. Initiate and develop, with the guidance and direction of the EirGrid, the agreed project communication strategy to include proactive and reactive project communication of key messages including issues relating to planning / consents, health and safety, land access and land acquisition. Manage the public and stakeholder project specific engagement and organise public project specific information campaigns, establish local project information centres and manage the project specific use of information media which may include Internet, television, radio and print, in line with the agreed strategy.
Advise on and agree, with EirGrid, the strategy for project consultation with the public, relevant authorities and various interested organisations. Initiate and develop, with the guidance and direction of the EirGrid, the agreed project communication strategy to include proactive and reactive project communication of key messages including issues relating to planning / consents, health and safety, land access and land acquisition. Manage the public and stakeholder project specific engagement and organise public project specific information campaigns, establish local project information centres and manage the project specific use of information media which may include Internet, television, radio and print, in line with the agreed strategy.
Assist with outline design and functional specification. Provided include advice on the appropriate standards, policies and specifications utilised for each Transmission Asset technology in one or more of the following areas: high voltage overhead lines; High voltage AC cables; reactive support devices; switchgear; transformers; control and protection; telecommunications; earthing. Provide associated civil, structural and mechanical engineering services. Carry out assessments and advise EirGrid on new technologies for particular technical solutions.
Assist with outline design and functional specification. Provided include advice on the appropriate standards, policies and specifications utilised for each Transmission Asset technology in one or more of the following areas: high voltage overhead lines; High voltage AC cables; reactive support devices; switchgear; transformers; control and protection; telecommunications; earthing. Provide associated civil, structural and mechanical engineering services. Carry out assessments and advise EirGrid on new technologies for particular technical solutions.
Carry out the duties of PSDP as described in the safety, health & welfare at Work (construction) Regulations 2006. Ensure that any design or specification prepared for a specific project takes account of the general principles of prevention provided at schedule 1 to the Safety, health & welfare at work Act 2005. Provide to EirGrid the health & safety file for the project in a format and number specified.
Carry out the duties of PSDP as described in the safety, health & welfare at Work (construction) Regulations 2006. Ensure that any design or specification prepared for a specific project takes account of the general principles of prevention provided at schedule 1 to the Safety, health & welfare at work Act 2005. Provide to EirGrid the health & safety file for the project in a format and number specified.
Lot number: 3
Title of the lot: Landowner engagement โ phase 2 and 3 development of transmission assets
Short description:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Quantity or scope:
Phase 2 - landowner engagement "The Survey stage".
Following identification of the preferred route / site, carry out "Landowner Engagementโ on behalf of EirGrid including: Carry out landowner identification along the route; Prepare and issue individual landowner packs (which will include inter alia: consultants cover letter, EirGrid survey letter, EirGrid policy information, landowner survey map and a project briefing document); Visit each landowner and conduct a pre survey interview; complete an interview form with the landowner; obtain from the landowner confirmation of details, outline of any concerns or comments in relation to proposed development. Communicate landownerโs concerns and comments to EirGrid and the lot 2 project consultant. Carry out technical and environmental walk over survey of the route / site and discuss the survey with each landowner. Further correspondence and meetings with landowners as required during the "survey stage" and up to conclusion of planning authority decision. Maintain and operate a landowner database, keep records of all landowner dealings, meetings and correspondences, to best quality management practice.
Following identification of the preferred route / site, carry out "Landowner Engagementโ on behalf of EirGrid including: Carry out landowner identification along the route; Prepare and issue individual landowner packs (which will include inter alia: consultants cover letter, EirGrid survey letter, EirGrid policy information, landowner survey map and a project briefing document); Visit each landowner and conduct a pre survey interview; complete an interview form with the landowner; obtain from the landowner confirmation of details, outline of any concerns or comments in relation to proposed development. Communicate landownerโs concerns and comments to EirGrid and the lot 2 project consultant. Carry out technical and environmental walk over survey of the route / site and discuss the survey with each landowner. Further correspondence and meetings with landowners as required during the "survey stage" and up to conclusion of planning authority decision. Maintain and operate a landowner database, keep records of all landowner dealings, meetings and correspondences, to best quality management practice.
Phase 3 - landowner engagement "The Wayleave stage".
Following Project Agreement, provide the following services: carry out landowner identification; prepare and issue important information to landowners such as inter alia letters, maps, policy and project briefing documents; visit each landowner and conduct an interview; complete an interview form with the landowner; discuss with (and agreed where possible) the landowner access arrangements for construction, their entitlements and compensation. Further correspondence and meetings with landowners as required during the "Wayleave Stage" and up to completion of the project. Maintain and operate a landowner database, keep records of all landowner dealings, meetings and correspondences, to best quality management practice. Complete weekly landowner progress reports.
Following Project Agreement, provide the following services: carry out landowner identification; prepare and issue important information to landowners such as inter alia letters, maps, policy and project briefing documents; visit each landowner and conduct an interview; complete an interview form with the landowner; discuss with (and agreed where possible) the landowner access arrangements for construction, their entitlements and compensation. Further correspondence and meetings with landowners as required during the "Wayleave Stage" and up to completion of the project. Maintain and operate a landowner database, keep records of all landowner dealings, meetings and correspondences, to best quality management practice. Complete weekly landowner progress reports.
Additional information about the lots:
Please note that the consultant appointed to carry out landowner engagement at the "survey stage" will not necessarily be the same consultant that carries out landowner engagement at the "Wayleave stage". It can be expected that separate mini-tender enquiries will issue to appoint consultants for both stages of landowner engagement.
Please note that the consultant appointed to carry out landowner engagement at the "survey stage" will not necessarily be the same consultant that carries out landowner engagement at the "Wayleave stage". It can be expected that separate mini-tender enquiries will issue to appoint consultants for both stages of landowner engagement.
Lot number: 4
Title of the lot: Client engineer - phase 3 development of transmission assets
Short description:
The role of โclient engineerโ is an identifiable requirement of the IA and is generally described as follows: the client engineer will inspect for the purpose of satisfying the TSO that the detailed design, plant, materials, scheduling and works carried out by the TAO meets the TSO development plan, functional specifications, outline designs and standards. As part of this process the client engineer shall produce an auditable trail of documentation in accordance with EirGrid requirements. The process shall take into account health & safety legislation requirements.
The role of โclient engineerโ is an identifiable requirement of the IA and is generally described as follows: the client engineer will inspect for the purpose of satisfying the TSO that the detailed design, plant, materials, scheduling and works carried out by the TAO meets the TSO development plan, functional specifications, outline designs and standards. As part of this process the client engineer shall produce an auditable trail of documentation in accordance with EirGrid requirements. The process shall take into account health & safety legislation requirements.
Quantity or scope:
Act as client engineer on development projects. Services to be provided to fulfil this function include but are not limited to the following:
Review and assessment of detailed design for compliance with outline design and functional specification, including assessment of proposed amendments / variations as submitted by the constructor.
Review and assessment of procurement specifications.
Development of commissioning instructions.
Construction inspection for compliance with specification, including final acceptance of new plant as fit for purpose.
Project management to manage and effectively achieve the project goals to the required standard and on time.
Description of options:
Framework agreement is valid for 3 years with the option of extension for 1 year.
Duration: 36 months
Reference number: ENQEIR253
Place of performance
Main site or place of performance: Ireland.
Legal, economic, financial and technical information Conditions for participation
Suitability to pursue the professional activity:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Economic and financial standing:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Technical and professional ability:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Contract execution
Deposits and guarantees required:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Other particular conditions:
For further information please download information memorandum and pre-qualification questionnaire available at www.etenders.gov.ie.
Procedure
Maximum number of operators of the framework agreement: 5
Duration of the framework agreement in years: 3
Languages
Language: English ๐ฃ๏ธ
Other languages: Irish.
Complementary information Review body
Name: Chief Registrar
Postal address: The Four Courts,Inns Quay
Postal town: Dublin 7
Country: Ireland ๐ฎ๐ช Service from which information about the review procedure may be obtained
Name: Legal Advisor EirGrid
Postal address: Block 2, The Oval, 160 Shelbourne Road, Ballsbridge
Postal town: Dublin 4
Source: OJS 2011/S 108-178793 (2011-06-02)
Additional information (2011-07-05) Object Notice metadata
Document type: Additional information
Modification of a contract/concession during its term (2017-04-28) Object Scope of the procurement
Title: Architectural, construction, engineering and inspection services
Total value of the procurement: 13 287 000 EUR ๐ฐ
Notice metadata
Document type: Modification of a contract/concession during its term
Common procurement vocabulary (CPV)
Additional CPV: Project management consultancy services๐ฆ Place of performance
NUTS region: Ireland๐๏ธ
Procedure
Type of bid: Not applicable
Award criteria
Not applicable
Contracting authority Identity
Awarding authority name: Eirgrid Plc
Postal address: Block 2, The Oval, 160 Shelbourne Road
Postal code: 4
Postal town: Dublin
Contact
Phone: +353 16615375๐
Object Scope of the procurement
Title of the lot: Framework Agreement in 4 Lots โ Development of Irish Electricity Transmission System Assets
Short description:
EirGrid established 4 framework agreements relating to specialist consultants to assist it with the development of the Irish Electricity Transmission System Assets. Lot 1: Advice on Project Feasibility โ Phase 1 Development of Transmission Assets; Lot 2: Project Consultant โ Phase 2 Development of Transmission Assets; Lot 3: Landowner Engagement โ Phase 2 and 3 Development of Transmission Assets; Lot 4: Client Engineer โ Phase 3 Development of Transmission Assets; EirGrid anticipates using this Framework for predominately small to medium scale projects.
EirGrid established 4 framework agreements relating to specialist consultants to assist it with the development of the Irish Electricity Transmission System Assets. Lot 1: Advice on Project Feasibility โ Phase 1 Development of Transmission Assets; Lot 2: Project Consultant โ Phase 2 Development of Transmission Assets; Lot 3: Landowner Engagement โ Phase 2 and 3 Development of Transmission Assets; Lot 4: Client Engineer โ Phase 3 Development of Transmission Assets; EirGrid anticipates using this Framework for predominately small to medium scale projects.
Duration: 48 months
Award of contract
Date of contract conclusion: 2012-01-02 ๐
Complementary information Review body
Name: The High Court
Postal address: Four Courts
Postal town: Dublin
Postal code: 7
E-mail: highcourtcentraloffice@courts.ie๐ง
Internet address: http://www.courts.ie๐ Service from which information about the review procedure may be obtained
Name: Consult legal advisor
Country: Ireland ๐ฎ๐ช
Source: OJS 2017/S 085-166592 (2017-04-28)