2019-04-12Specialist Renewable Energy Solar PV Installer (Electricity Supply Board (ESB))
The contracting Entity intends to procure a framework contract for a specialist renewable energy solar PV installer(s). The framework will consist of 2 lots. The lots will be determined by geographic location. An applicant can submit an application for 1 or both lots.
Lot :1 Northern Region will consist of the sale, supply and installation of solar PV and battery storage facilities to the Northern area retrofit market in the Republic of Ireland;
Lot: 2 Southern Region will consist of the sale, supply and …
View the procurement » Mentioned suppliers:Energy Panel Ireland Ltd
2019-03-20Lift Installation Reserved Specialist for Leeson Lane Office Building (Office of Public Works (OPW))
Lift Installation Reserved Specialist:
The development will consist of:
1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445 sqm in area;
2) The construction of a new 7 storey (over basement) office building of c.6,333 sqm;
3) Site development works include hard landscaping, boundary treatment and all other ancillary site works.
View the procurement »
2019-03-20Electrical Installation Reserved Specialist for Leeson Lane Office Building (Office of Public Works (OPW))
Electrical Installation Reserved Specialist:
The development will consist of:
1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445 sqm in area;
2) The construction of a new 7 storey (over basement) office building of c. 6 333 sqm;
3) Site development works include hard landscaping, boundary treatment and all other ancillary site works.
View the procurement »
2019-02-27Garda Security and Crime Operations Centre, Military Road, Dublin 8 (Office of Public Works (OPW))
The construction of a new 10 060 m 6 and four storey office building with a green roof and central atrium, over two floors of 9 275 m basement car parking with ancillary accommodation, on a site of circa 0,86 ha. The development will also include for the provision of hard and soft landscaping, a new stone boundary wall to military road, an ESB substation, a 7 metre Garda telecommunication mast on the sixth storey core roof, a 415 m single storey services building with a green roof, new foul drainage, …
View the procurement »
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2019-02-25Construction of a Food Innovation and Incubator Hub Campus (BIA Innovator Campus CLG)
Construction of a food innovation and incubator Hub Campus at Mellows, Teagasc Campus, Athenry, Co. Galway. The Campus consists of the construction of 3 separate buildings: Building 1 — BIA EOLAS/BIA OBAIR — construction of a 2 storey Learning Centre (1 200 m Gross Floor Area), Building 2 H.P.S.U. Units — construction of a single storey building (700 m Gross Floor Area), Building 3 — Incubation Units — single storey building (700 m Gross Floor Area) and general site works.
View the procurement » Mentioned suppliers:Glenman Corporation Ltd
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2019-02-12Provision of Lift Maintenance Services (St Vincent's University Hospital)
St. Vincent's University Hospital (SVUH) wishes to engage a service provider to provide a comprehensive preventative maintenance service, whereby the appointed contractor undertakes, for a specified all-inclusive consideration, to carry out all or any maintenance, repairs or renewals which may become necessary, and provide an emergency 24 hour service.
View the procurement »
2019-02-08Maintenance of Lifts and Escalators (Iarnrod Eireann — Irish Rail)
This is a call to competition by IE for the procurement of lift and escalator maintenance services for Irish Rail and the CIE Holding Company.
Iarnród Éireann requires the services of a contractor in the provision of lift and escalator maintenance services to undertake both planned and unplanned maintenance activities as well as providing a call center, training for IE staff and upgrade works as required during the course of the contract. The existing scale of our requirements is 132 lifts and 11 …
View the procurement » Mentioned suppliers:Orona Mid Western Lifts Ltd
2019-01-31Single Party Framework Agreement for Dublin City Council Public Lighting Upgrade Project (Dublin City Council)
The lighting upgrade project shall involve:
— replacement of up to 40 000 luminaires with energy efficient LED luminaires,
— replacement of up to 4 000 lighting columns,
— replacement of a significant amount of public lighting legacy cabling,
— replacement of up to 120 columns/luminaires with heritage columns/luminaires to enhance and improve the Public Realm,
— providing a Central Management System (CMS) to remotely monitor control and manage Street Lights and
— facilitating Smart City Applications …
View the procurement » Mentioned suppliers:ENERVEO Ireland Ltd.,
2019-01-18Specialist Renewable Energy Installer (Electricity Supply Board (ESB))
SS/CON/4321.
Specialist renewable energy installer.
The Contracting Entity intends to procure a framework contract for a specialist renewable energy installer(s). The framework will consist of 2 lots:
— lot 1 will consist of the sale, supply and installation of solar PV and battery storage facilities to the residential retrofit market in the republic of Ireland,
— lot 2 will consist of the sale, supply and installation of heat pumps and related services to the residential retrofit market in the republic …
View the procurement »
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.
2018-12-17Aurora Civils Framework (Ervia)
Single supplier Framework Agreement for the completion of maintenance works on the existing network infrastructure, the design and construction of new customer connections and network extensions as required. The successful Applicants responsibilities will include but not be limited to:
— maintenance and emergency maintenance works,
— standby and emergency cover,
— telecommunications network design work and associated ancillaries,
— telecommunications duct network construction to include open trench, mole …
View the procurement » Mentioned suppliers:KN Network Services (Ire) Ltd
2018-11-30Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.
The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in …
View the procurement »
2018-11-29SWSOS Site Upgrades (Ervia)
Scope includes for the design, construction, testing, commissioning, maintenance, and ultimately handover of upgrades to security systems and enhancements at a number of two existing Gas Transmission Stations and two existing compressor stations in Scotland. The upgrade works will include the installation of extensive (>1 km) lengths of high specification security fencing and gates, incorporating PIDs, electric toppers and associated security lighting, CCTV and video analytics. Ancillary upgrade works …
View the procurement »
2018-11-20Electrical Balance of Plant — Cloncreen Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a 21 turbine wind farm and associated infrastructure at Cloncreen bog in eastern Co. Offaly, approximately 4.5 kilometres southwest of Edenderry and 4 kilometres east of Bord Na Móna’s 84 MW Mount Lucas wind farm. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme (RESS) auction in either 2019 or 2020. Expressions of interest are being …
View the procurement » Mentioned suppliers:H&MV Engineering
2018-11-16Garda Security and Crime Operations Centre, Military Road, Dublin 8 (Office of Public Works (OPW))
The construction of a new 10 060 m 6 and 4 storey office building with a green roof and central atrium, over two floors of 9 275 m basement car parking with ancillary accommodation, on a site of circa 0,86 ha. The development will also include for the provision of hard and soft landscaping, a new stone boundary wall to Military Road, an ESB substation, a 7 metre Garda telecommunication mast on the sixth storey core roof, a 415 m single storey services building with a green roof, new foul drainage, …
View the procurement »
2018-10-15Tender for Provision of a Private Branch Exchange (PBX) Solution for St Vincent's University Hopsital (St Vincent's University Hospital)
The main aim of this project is to provide SVUH with an Open Standard Analogue/TDM/VoIP phone system and: provide the hospital with a resilient telephony infrastructure with no single point or location of failure possible, thereby removing the operational risks associated with the current infrastructure. Provide telephony services to new service developments on the campus. Protect the existing investment in telephony services. Allow for capability of integration with National telephony deployments as …
View the procurement »
2018-10-15Garda Security and Crime Operations Centre, Military Road, Dublin 8 (Office of Public Works (OPW))
The development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as:
— a gym,
— locker rooms,
— secure storage,
— showers and toilets,
— tea stations/kitchens,
— private outdoor space,
— along with sufficient meeting rooms and conference …
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Electrical subcontractors (reserved specialist to the main appointed contractor) for electrical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement »
2018-10-03Maynooth University Refurbishment of Existing Arts Building (Maynooth University)
The Works Contractor contract defined as the Refurbishment of the existing Arts Building of 4 700 m accommodation which may be delivered over 2 phases. Phase 1 is circa 1 390 m which provides for reconfiguration of existing offices into modern teaching spaces and courtyard. Phase 2 is circa 3 310 m which provides reconfiguration of existing toilets, office space into modern teaching spaces. Works also include provision of new courtyard and works to existing mechanical and electrical systems.
View the procurement »
2018-10-02Kanturk National School — Pre-qualification for Selection as Electrical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 sqm on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil …
View the procurement »
2018-10-02Kanturk National School (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 m on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage …
View the procurement »
2018-09-21Unified Communications Solution for the National Childrens Hospital’s Paediatric Out Patient Department and Urgent... (Health Service Executive (HSE))
The Government has approved the development of a new Children’s Hospital to be co-located with St James’s Hospital in Dublin. The hospital will be supported by two Paediatric Outpatient Department and Urgent Care Centres, on the grounds of Connolly and Tallaght Hospitals, providing Ambulatory and Urgent Care Services for children in the greater Dublin region.The Children's Hospital Group, responsible for delivering on this project, is now seeking to appoint a service provider to supply, install, …
View the procurement » Mentioned suppliers:PFH
2018-09-21Maynooth University Academic Building New Construction (Maynooth University)
The Works Contractor contract defined as the Academic Building New Construction comprises the new construction of 10,554 m accommodation which may be delivered across a single or 2 phases. Phase 1 is circa 5,287 m which provides for teaching spaces predominantly on ground and first floors with offices, reading and support spaces on second and third floors. Enclosed plant space is located at fourth floor. The main objective of the competition is the Phase 1, with the option to proceed with Phase 2, …
View the procurement » Mentioned suppliers:JJ Rhatigan and Company
2018-09-17RS Electrical — Construction of a new 3-storey Post-primary School Building (Scoil Mhuire Gan Smal (Blarney))
Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Electrical installation for a new 3-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and …
View the procurement » Mentioned suppliers:O KEEFFE ELECTRICAL
2018-09-17Proposed Walking Track and Carpark Surfacing and All Associated Site Works (Ardee St Marys GFC)
The project is to take place in the grounds of St. Marys GFC at Ardee Co. Louth, located on the south side of Ardee Town just off the main N2. The works will be scheduled on 2 seperate phases. Phase 1 of the project includes the construction of a walking track around the pitch to the rear of the site with the walking pathway commencing at the carpark area. The walking track will be illuminated via existing lighting and additional lighting to match existing that will allow the entire track to be used all …
View the procurement » Mentioned suppliers:Envirogreen
2018-09-03Supply and Install of Energy Monitoring Systems (EMS) and Controls Framework (Electricity Supply Board (ESB))
The Contracting entity intends to establish a list of competent Energy monitoring system integrators and Controls specialists who will supply, fit and integrate the energy monitoring hardware to monitor the energy consumption on a customer’s site. This can be done through a variety of Energy monitoring system (EMS) providers in the marketplace. ESB’s intention is to award 5 suppliers to place on a framework at the end of this procurement process with a view of mini-tendering off the framework.
View the procurement »
2018-08-22Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in …
View the procurement »
2018-08-13Dunboyne Junior + Senior National Schools — Electrical Specialist (Dunboyne Junior + Senior National School)
Expressions of Interest are invited from suitably qualified Electrical services contractors who wish to be considered for the Electrical works in the new Senior school and new Junior school extension which will comprise lighting and emergency lighting, small power, telecommunication systems, fire alarm, security, public address systems and lighting protection and upgrading works to the existing junior school. The project will be constructed over 2 separate phases.
View the procurement »
2018-08-03Provision of Residential Energy Services (Electricity Supply Board (ESB))
Provision of Residential Energy Services.
The Contracting Entity intends to procure a Framework contract for the Provision of Residential Energy Services.
This framework may include (but not limited to) the following services:
— Installation of Pay As You Go electricity meters,
— Installation of domestic Energy monitoring devices,
— Installation of Remote Access Heating Controllers,
— Installation of domestic Solar PV,
— Installation of domestic electric vehicle charge points,
— Provision of Gas boiler …
View the procurement »
2018-07-2460 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development.
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »