2017-06-29Carrigaline Education Campus — Mechanical Installation for 3 new schools (Cork Education and Training Board)
Cork Education and Training Board (CETB) invites Mechanical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Mechanical installation for the new 3-school, 8.6 ha, Carrigaline Education Campus, comprising (i) a 2-storey, split-level Gaelcholáiste (5 680 m) for 500 pupils, including learning, administration and ancillary spaces, a physical education hall and outdoor ball courts; (ii) a 24 classroom, 2-storey, split level school (3 748 m), to accommodate the Gaelscoil, including …
View the procurement » Mentioned suppliers:Murphy and Kelly (Thomastown) Ltd
2017-06-29Carrigaline Education Campus — Electrical Installation (Cork Education and Training Board)
Cork Education and Training Board (CETB) invites Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Electrical installation for the new 3- school, 8.6 ha, Carrigaline Education Campus, comprising (i) a 2-storey, split-level Gaelcholáiste (5 680 m) for 500 pupils, including learning, administration and ancillary spaces, a physical education hall and outdoor ball courts; (ii) a 24 classroom, 2-storey, split level school (3 748 m), to accommodate the Gaelscoil, including …
View the procurement » Mentioned suppliers:H&F Electrical Contractors Ltd
2017-03-24The Supply and Installation of an Alarm and Condition Monitoring System(Power management System) (Commissioners of Irish Lights)
The Irish Lights Vessel (ILV) Granuaile is fitted with a ship's automation system which provides UMS alarm monitoring, power management, engine instrumentation and tank monitoring and control. It is to be replaced with a system that incorporates the latest generation of hardware and features that will be robust, easy to use, easy to maintain and enhance the safe and efficient operation of the vessel.
The Commissioners of Irish Lights has a requirement to upgrade or fully replace the marine control, …
View the procurement » Mentioned suppliers:Kongsberg Maritime Ltd
2016-11-11Compressed Natural Gas (CNG) Filling Stations (Ervia)
This Framework Agreement will be designed as a multi-supplier Framework Agreement with competent entities whose responsibilities include but are not limited to the design, manufacture, supply, delivery, installation, commissioning, performance evaluation, certification, maintenance and training of CNG filling stations.
CNG filling stations will be used to fill CNG vehicles, including but not limited to cars, buses, trucks and vans.
The filling stations will comprise equipment, including but not limited …
View the procurement » Mentioned suppliers:Bauer Kompressoren UK LtdWaga Warme-Gastechnik Gmbh
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 m².
View the procurement »
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-07-20Electrical Maintenance Services (Institute of Technology Tallaght)
The scope of the works is to provide:
Planned preventative maintenance of emergency lighting, medium voltage switchgear, low voltage switchgear and distribution boards.
Reactive maintenance of all other electrical systems on a time and material basis, together with new electrical installation works, based on the tendered ‘basket’ of hours submitted with this tender.
View the procurement »
2016-01-06Compressed Natural Gas (CNG) Filling Station Inchera (1) (Ervia)
The Contracting Entity is undertaking a competitive tender process using a single
stage negotiated procedure to award a contract to meet the following
requirements:
The design, manufacture, delivery, installation, commissioning, performance
evaluation, certification, maintenance and training in respect of safe use of Fast
Fill CNG station equipment at Inchera, Little Island, Co. Cork, Ireland. Equipment
required includes compressor, storage, dispensers and all required ancillaries and
safety systems, …
View the procurement »
2016-01-05Compressed Natural Gas (CNG) Filling Station Inchera (Ervia)
The Contracting Entity is undertaking a competitive tender process using a single stage negotiated procedure to award a contract to meet the following requirements:
The design, manufacture, delivery, installation, commissioning, performance evaluation, certification, maintenance and training in respect of safe use of Fast Fill CNG station equipment at Inchera, Little Island, Co. Cork, Ireland. Equipment required includes compressor, storage, dispensers and all required ancillaries and safety systems, …
View the procurement »
2015-09-25Mechanical and Electrical Contractors Frameworks (daa plc)
The Contracting Authority proposes to set up a non-exclusive framework agreement with a number of Mechanical and Electrical Engineering Contractors for projects at Dublin Airport for the next 4 years (with an option to extend for 1 further year) subject to ongoing satisfactory performance and workload.
This RFT process is to identify suitable Tenderers for consideration for inclusion on the Framework Panel/s.
View the procurement »
2015-08-27Works Specialists with Design Input for the new children‘s hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
— The demolition of all buildings on the site of the new children's hospital;
— Construction of a new children's hospital building and associated helipad;
— A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
— Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps …
View the procurement »
2015-05-20Electric Vehicle Charge Point Installations (Electricity Supply Board ( ESB ))
This service requirement covers the installation of Domestic Electric Vehicle (EV) Charge Points suitable for charging electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEVs) for use in private premises, as part of a country wide roll out undertaken to support the use of electric vehicles in Ireland. The Charge Points equipment involved which may be manufactured by more than 1 supplier will be supplied free-of-charge to the appointed contractor(s) by ESB ecars. The scope covers the …
View the procurement » Mentioned suppliers:NMD Electrical
2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-03-20Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project …
View the procurement »
2015-03-06Process for the Designation of an Electrical Safety Supervisory Body (Commission for Energy Regulation)
The Commission for Energy Regulation (CER) is Ireland's independent energy and water regulator. The CER was established in 1999 and now has a wide range of economic, customer protection and safety responsibilities in energy. The CER is also the regulator of Ireland's public water and wastewater system. As provided for under the Electricity Act 1999 (as amended), the CER is operating a Designation Process in order to determine what party (if any), it shall appoint as an Electrical Safety Supervisory Body …
View the procurement » Mentioned suppliers:Register of Electrical Contractors of Ireland Ltd
2015-02-13Design, Installation and operation of CHP Plant at UCD (University College Dublin (UCD))
UCD requires the market to propose a solution for the design, installation, operation and maintenance of a CHP package that best suits UCD's goals as outlined. The primary goal of this project is to reduce UCD's energy consumption and provide long-term energy management solutions. It is likely that UCD will be entering into a long-term contract (maximum 15 years) with the successful candidate for the supply, commissioning and operation of new CHP high efficient plant, with an energy performance contract …
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-12-20FD/02/05/292 - Facilities Management Services (Irish Prison Service)
The Irish Prison Service (IPS) requires the provision of a
facilities management contract covering Mechanical and
Electrical planned and reactive maintenance.
Service provider must provide a fully managed service,
acting as a Prime Contractor with single point responsibility
for managing and delivering all the services at the specified
premises.
The scope of the contract shall be to provide a facilities
management service for the provision of specialist
contractor support with a managed service to cover …
View the procurement »
2013-12-1013/115 - The Provision of Network Services and Rehabilitation Works to Irish Water (Bord Gais Eireann)
Irish Water (IW) is requesting tenders to establish a multi- supplier framework agreement for the provision of all required works and services associated with Network Services and Rehabilitation Works to support the provision of water services capital investment. It is envisaged that
these Network Services and Major Rehabilitation Works will be carried out in a planned manner where work packages are identified in advance of each call off.
The works will be sub-divided into separate Lots detailed …
View the procurement »
2013-11-14BXD_460 - Tram Wash-plant Supply and Installation (Railway Procurement Agency ( RPA ))
Luas Cross City will represent the next addition to Dublin's Luas light railway system. Running from the Luas Green Line terminus at St. Stephen's Green through the city centre, Phibsborough and Cabra to Broombridge. The new line will link the Luas Red and Green Lines and will also serve the
planned new DIT Campus facility at Grangegorman. It will provide interchange with suburban railway services at Broombridge and with city bus services at numerous locations throughout the city centre. RPA is seeking …
View the procurement »
2013-09-23Tender for Electrical Maintenance and General Electrician Services (Athlone Institute of Technology)
AIT wishes to engage an electrical contractor in to provide electrical maintenance and general electrician services for all of the Institutes facilities. The campus has approximately 65 000 square metres of floor space on 53 acres over two campuses. The successful applicant will be responsible for the electrical maintenance, servicing and efficient, effective operation of equipment on campus. Theservices provided under the contract are listed in the Call for Expressions of Interest document which is …
View the procurement »
2013-07-1013.027 - Service Provider for Energy Data Logger Supply, Installation, Commissioning and Maintenance (Office of Public Works ( OPW ))
The Office of Public Works (OPW) has been funded to implement a large scale Staff Energy Awareness Campaign in the Public Service. This tender is to select.
suitable Service Providers to supply, install, commission and maintain Energy Data Logger (EDL) equipment in buildings participating in the programme. The EDL shall
collect pulse data from energy meters (electricity, gas, oil, heat, etc) and automatically transmit this data to the OPW's Central Energy Data Repository (CEDaR) database.
The tender is …