Procurements: Building installation work (page 18)
2016-09-10Fibre Maintenance and Installation (Ervia)
It is envisaged that these services will be included in the single party framework, but not be limited to, the following:
— Cable installation;
— Cable removal;
— Fibre splicing and Terminating;
— Fibre testing;
— Splice joint installation and associated works;
— Splice joint repair;
— Duct and sub-duct supply, installation, proving and testing;
— Provision of photographic records both prior to and post each day's activity on site;
— Emergency maintenance works;
— Standby and Emergency Cover;
— Provision …
View the procurement » Mentioned suppliers:Total Splicing Solutions Limited
2016-09-02Establishment of Small Works Construction Framework (Irish Prison Service)
2.3 The purpose of this Competition is to conclude frameworks (the “Frameworks) for each geographical region for the execution of construction of works within the Prisons Estate as more particularly described hereunder at Part 5 of this Establishment Document (the “Works”). The 5 highest ranking Tenderers shall each be awarded a place on the Framework for the Lot applied for and invited to tender for works between 6 000 EUR and 500 000 EUR (ex VAT) in value. Tenderers can compete for a maximum of 2 Lots. …
View the procurement »
2016-08-31Provision of Telecommunication Services (An Post)
An Post is seeking to enter into a Single Party Framework Agreement for each of the following Lot's for a period of 3 (three) years with an option to extend for a period up to a further 2 (two) years.
Lot 1: Provision of Fixed Voice Services;
Lot 2: Provision of Fixed and Wireless WAN Data Services;
Lot 3: Provision of Data Centre Metro and Mail Centres Data Services;
Lot 4: Provision of Mobile Data and Voice for Postal Operatives;
Lot 5: Maintenance and Support of Cabling Infrastructure.
The tender will …
View the procurement » Mentioned suppliers:EircomPower Communications LtdVodafone Ireland
2016-08-12Drainage Repairs Moneypoint and Aghada Generating Stations (Electricity Supply Board ( ESB ))
ESB invites expressions of interest for the following: Repairs to storm and foul water drainage infrastructure, with a range of pipe repairs based on CCTV findings including patching, lateral cuts, relining, excavation repairs and manhole sealing. Following repair work, hydrostatic pressure testing to EN1610 is to be carried out on the repaired infrastructure. Location of services Moneypoint Power Station, Kilrush Co. Clare and may also include some work in Aghada Power Station, Co. Cork.
View the procurement »
2016-08-05Procurement of Works Contractor for UCC Student Hub at University College Cork (University College Cork (UCC))
The development will consist of the construction of a 6 storey Student Hub Building within the university campus adjoining College Road and Gaol Walk, Cork. The building will be used to provide student and administrative services and flexible learning spaces. The gross floor space will be 3 991 m .The proposed works will involve demolitions, alterations and extensions to the existing Windle Building, the removal of some existing car parking spaces and the provision of new hard and soft landscaping and lighting.
View the procurement » Mentioned suppliers:JJ Rhatigan & Co
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd
2016-07-20Electrical Maintenance Services (Institute of Technology Tallaght)
The scope of the works is to provide:
Planned preventative maintenance of emergency lighting, medium voltage switchgear, low voltage switchgear and distribution boards.
Reactive maintenance of all other electrical systems on a time and material basis, together with new electrical installation works, based on the tendered ‘basket’ of hours submitted with this tender.
View the procurement »
2016-07-0616/085 — Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract (Irish Water)
As part of the Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract, Irish Water on behalf of Ervia plans to undertake the following:
— Construction of a new 80MLD Water Treatment Plant (WTP);
— Upgrade of the Existing Vartry Reservoir Intake including new siphon pipework;
— Increase the capacity of the existing Vartry Reservoir Spillway;
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated …
View the procurement » Mentioned suppliers:Veolia Water Ireland Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately 17 000 m2. The building will provide direct linkages to the existing hospital buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities must remain uninterrupted at all times during the Works.
View the procurement »
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin; Mechanical Services... (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including
en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately
17 000 m2. The building will provide direct linkages to the existing hospital
buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities
must remain uninterrupted at all times during the Works.
View the procurement »
2016-06-16Hanging Gardens Development, Henry St, Limerick (Limerick City and County Council)
The development will comprise the completion of a partially constructed circa 7 765m 6 storey over basement shell and core office building, the demolition of no 19 Henry St and the construction of a circa 1 900 m 5 storey shell and core office building, the refurbishment of circa 680 m of the existing Mercantile, GPO and Hanging Gardens Buildings and associated external works.
View the procurement »
2016-05-31COPE Foundation — Electrical Maintenance Services (Single Participant Framework) (COPE Foundation)
COPE Foundation, (the Contracting Authority), intends to establish and operate a Single Participant Framework for Electrical Maintenance Services in the Cork City and County Areas. It is anticipated that a maximum of 3 Named Reserve Participants will be admitted to the Framework Agreement provided there are sufficient number of qualified Applicants.
View the procurement »
2016-05-20NUIG Corrib Village Student Accommodation Fire Detection System and Emergency Lighting Upgrade Works (National University of Ireland, Galway (NUI Galway))
NUI Galway proposes to carry out Fire Detection System and Emergency Lighting
Upgrade Works to Corrib Village Student Accommodation Complex on the north
campus of the University at Upper Newcastle Rd.
The construction process will provide for upgrade works to a total of 176
apartments in 46 blocks to include: (1) Replacement of existing fire detection
system with new addressable L1 type fire detection system (2) Upgrade works to
existing emergency lighting to include additional emergency lighting …
View the procurement » Mentioned suppliers:Fireco
2016-05-11100 Bed Nursing Facility and Catering Department (Peamount Healthcare)
Construction of a new 2 storey healthcare unit comprising residential accommodation for 100 people, ancillary healthcare services, catering, pharmacy and staff facilities, associated site works, access road, landscaping, an internal link to the existing rehabilitation unit, together with redistribution of existing car parking spaces and the demolition of a disused building. The proposed works are located on the site of Protected Structures.
View the procurement »
2016-04-16GWM4576 Boiler Tube Replacement Money-point Framework (ESB)
This Framework is for the design, manufacture, delivery and installation of Boiler components on the 3 305-MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Money-point Generating Station — works for each unit are likely to be tendered individually. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the 3 units will take place during outages in 2017, 2018 and 2019. Outage dates may change …
View the procurement »
2016-04-052016 Cork Training Centre — Mechanical Maintenance Services (Cork Education and Training Board)
The Mechanical Maintenance Service contract is required to provide a full maintenance service and will cover all aspects of Mechanical maintenance as defined herein. 2.10.1. The provision of the required services is to be based on a 51 week provision for all sites. 2.10.2. The Training Centre expects the successful Contractor to provide performance monitoring information that proves its delivery of a high quality service. 2.10.3. The Contractor will be expected to work in partnership with the Training …
View the procurement » Mentioned suppliers:Mechancial and Building Serives
2016-03-24Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package (Curragh Racecourse Ltd)
Contract Phase 1: Enabling Works
The enabling works contract involves the demolition of the existing east and west
grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of
hard landscaping, sections of perimeter walls, removal and disposal of asbestos,
termination and diversion of services, installation of new services such as surface
water and wastewater infrastructure within the main site, felling of a select
number of trees and tree protection.
A specialist requirement under the …
View the procurement » Mentioned suppliers:Murphy International Ltd
2016-03-02Provision of lift and escalator maintenance and repair services 2016 — 2019 (Iarnrod Eireann-Irish Rail)
Iarnród Éireann's wish to enter into a single party 3-year framework
agreement for the supply of lift and escalator maintenance and repair services at
various locations throughout the railway network.
Refer to Regional Map 0.0-G00-001- Quantities of Lift and Escalator assets are
follows:
East Region — 48 Lifts — 3 Escalators — 2 Wheel chair lifts;
South Region — 56 Lifts — 10 Escalators — 5 Wheel chair lifts;
West Region — 26 Lifts — 2 Escalators — 1 Wheel chair lift.
Iarnród Éireann's existing contract …
View the procurement » Mentioned suppliers:Orona Midwestern Lifts Ltd
2016-02-23Blanchardstown Regional Drainage Scheme (BRDS) 9C Sewer Duplication and Storage (Ervia)
— Approximately 3.2 km of pipeline (diameters ranging from approximately
1 500 mm to 1 800 mm) installed using trenchless techniques
— Underground storage tanks with an approximate total capacity of 30 000 m³ to cater for stormwater flows and flow balancing
— New Pump Station to lift flows (approximately 350l/s) from the proposed sewer to the existing sewer
— Stormwater return pumps to return flows from the storage tanks to the existing
9C Sewer (approximately 320/ls)
— Diversion of the existing live 1 …
View the procurement »
2016-02-18Sandyford Depot Extension Works (Transport Infrastructure Ireland (TII))
The Employer requires a contractor with expertise in civil engineering, structural engineering, building works, building services, traction power and overhead conductor system engineering works and track works for the purposes of carrying out the following activities.
View the procurement »