2016-10-27Provision of Ecological Services to the Coillte Group (Coillte Teoranta)
Coillte is establishing a framework agreement from suitably qualified Ecologists for the provision of Ecological Services. The framework agreement will establish the terms governing contracts to be awarded during the specified time period, with particular regard to price, product specification and capability to provide the service required.
View the procurement »
2016-10-03Multi-Party Framework Agreement for the provision of Engineering Consultancy Services at Dublin Port (Dublin Port Company)
The scope of the framework agreement is for Engineering Consultancy Services at Dublin Port Estate and other lands including but not limited to the following:
— Civil;
— Marine;
— Structural;
— Mechanical;
— Electrical;
— Environmental;
— Planning;
— Traffic / Transport;
— Architectural Services;
— Archaeology;
— Landscape;
— Conservation;
— PSDP;
— Fire safety Consultant;
— Building Control Amendment Regulations — BCAR;
— Design Certifier;
— Assigned Certifier;
— Disabled Access Certificate — DAC;
— …
View the procurement »
2016-09-22GWM5656 ISO/OHSAS Certification Framework Agreement (Electricity Supply Board (ESB))
ESB Generation and Wholesale markets currently has Environmental Management Systems (EMS's) certified to ISO 14001: and Safety Management Systems (SMSs) certified to OHSAS 18001: and an Asset Management System (AMS) certified to PAS55 (this certification is shortly being assessed and will be ISO55000 at time of award of contract) at a number generating stations (Thermal, Hydro and wind) as well as some central functions. It should be noted that the sites are geographically spread across the Republic of …
View the procurement » Mentioned suppliers:Lloyd's Register Quality Assurance LimitedPrecision GroupSGS Ireland Ltd
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly …
View the procurement »
2016-08-17Service concession for the Operation and Management of Civic Amenity Sites in County Kildare (Kildare County Council)
Kildare County Council is inviting Expressions of Interest from suitably qualified
Service Providers for the award of a concession to operate and manage its Civic
Amenity Sites in County Kildare for a 5-year period. The service concession will comprise minimum service requirements. As part of the concession contract, Kildare County Council will grant a licence to the successful tenderer to exploit its fully licensed transfer station (EPA) and potentially other areas of the site at Silliot Hill subject to …
View the procurement »
2016-08-12Drainage Repairs Moneypoint and Aghada Generating Stations (Electricity Supply Board ( ESB ))
ESB invites expressions of interest for the following: Repairs to storm and foul water drainage infrastructure, with a range of pipe repairs based on CCTV findings including patching, lateral cuts, relining, excavation repairs and manhole sealing. Following repair work, hydrostatic pressure testing to EN1610 is to be carried out on the repaired infrastructure. Location of services Moneypoint Power Station, Kilrush Co. Clare and may also include some work in Aghada Power Station, Co. Cork.
View the procurement »
2016-07-20Facilities Management Services (Bord Altranais agus Cnáimhseachais na hÉireann/Nursing and Midwifery Board of Ireland)
NMBI is looking for the provision of a comprehensive facilities management service, on both a planned and reactive basis, to the NMBI's head-quarter premises for a period of up to 4 years duration. The tender will include both scheduled services and call out cover in the event of system failures/urgent requirements. The tender will include but will not be limited to the following 4 main categories of service: (1) Facilities Management Service (2) Property Maintenance (3) Cleaning Services (4) Security …
View the procurement »
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd