2018-08-035Nr. National Frameworks (Multiple Operator) for Design Team Services 2018 (Health Service Executive (HSE))
4Nr. National Frameworks and 1Nr. Regional Framework for Design Team (DT) Services 2018 having 6Nr. Principal DT Disciplines:
1) Architect Services (including Planning Consultancy Services);
2) Quantity Surveying Services;
3) Building Services Engineering (M&E) Services;
4) Civil/Structural Engineering Services;
5) Fire Safety Consultancy Services; and
6) Independent Project Supervisor Design Process (PSDP) Services.
View the procurement »
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:Tim Kelly Electrical
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:T Bourke
2018-04-27Appointment of Architect and Design Team (Shannon Commercial Properties DAC)
Shannon Commercial Enterprises DAC strategy under this appointment is to design and gain planning approval for both the phase 1 and phase 2 developments as outlined below with associated provision for car parking and ancillary site development works as well as construction procurement and management for the Phase 1 buildings only, along with the provision of a full time Resident Engineer for the construction period. The square footage is approximate and may vary up or down depending on final design. It …
View the procurement » Mentioned suppliers:— Neill — Malley Ltd
2017-10-18Mechanical Systems Testing, Maintenance & Replacement Services Contract (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing mechanical systems.
The requirements under this contract will include; planned preventative maintenance and the provision of Technical & skilled resource's.
The current agreement for these services will expire in February 2018.
The proposed duration of the contract is 3 years with the option to extend for 1 additional year at Iarnród Éireann's discretion.
Location …
View the procurement » Mentioned suppliers:LMC Energy Solutions Ltd
2017-10-02Construction Consultant Design Services Framework (The University of Dublin Trinity College)
Trinity College Dublin, the University of Dublin plan to establish a Multiple Supplier Multiple Lot framework agreement Lot 1, 2 and 3 of the proposed framework concern the provision of Architect led multi-disciplinary design teams categorised by various construction values. Lot 4 concerns the individual consultant disciplines for the provision of those distinct services across all spend categories. All services procured via the proposed framework will generally provide design and associated services in …
View the procurement »
2017-08-25LCCC Public Land Activation Programme — Architect Led Integrated Design Team Masterplanning Consultancy Services... (Limerick City and County Council)
Limerick City and County Council wishes to establish an Architect Led Integrated Design Team framework agreement to provide consultancy services to complete masterplan studies for a number of selected Council owned sites in the city and county. The scope of services of the Architect Led team may also include the design and delivery of selected sites beyond master planning stage and through all five stages of the Capital Works Management Framework. Refer to PIM and Masterplanning Brief for further …
View the procurement »
2017-04-06M E Framework from EUR0.5m to EUR5m (Wicklow County Council)
Framework of consultant M&E Engineers for Housing projects, refurbishment projects and other projects of a general nature ranging in value from 500 000 EUR to 5 000 000 EUR exclusive of V.A.T. in Wicklow County Council and South Dublin County Council 2017-2021.
View the procurement »
2017-03-03Mechanical and Electrical Facilities Maintenance (Marine Institute)
The Marine Institute, a semi State body, wishes to invite tenders for the supply of Mechanical & Electrical Facilities Maintenance for Marine Institute, Rinville, Oranmore, Co. Galway for a period of 3 years with an option to extend for a further 2 years.
The Institute comprises buildings of 11 000 sq.m. on a 14 acre site. It is a two storey with mechanical plant rooms at level three. The complex can be divided into three main sections:
— Crescent Building accommodating administration offices, full staff …
View the procurement » Mentioned suppliers:LMC energy solutions
2016-12-22Mechanical Engineering — Reserved Specialist (Office of Public Works (OPW))
The Mechanical Works generally comprise the following:
Identification, tracing and phased strip out of existing mechanical services installations in Historic Leinster House.
Supply, installation, testing and commissioning on a phased basis in Historic Leinster House of the following:
New Heating installation throughout
New Air Conditioning and Ventilation Systems
New Water Services and Soils and Waste Systems
New BMS system which shall be connected to the existing BMS network
Fit-out of a new RTE TV and …
View the procurement »
2016-11-23UCD Heritage Houses Capital Works (University College Dublin ( UCD ))
University College Dublin (UCD) wishes to establish a multi party framework agreement for Main Contractor Works to UCD Heritage Houses Capital Works with an initial contract Ulysses Centre at Newman House. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Mechanical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Mechanical Services/Works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Electrical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Electrical Services / works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-10-03Multi-Party Framework Agreement for the provision of Engineering Consultancy Services at Dublin Port (Dublin Port Company)
The scope of the framework agreement is for Engineering Consultancy Services at Dublin Port Estate and other lands including but not limited to the following:
— Civil;
— Marine;
— Structural;
— Mechanical;
— Electrical;
— Environmental;
— Planning;
— Traffic / Transport;
— Architectural Services;
— Archaeology;
— Landscape;
— Conservation;
— PSDP;
— Fire safety Consultant;
— Building Control Amendment Regulations — BCAR;
— Design Certifier;
— Assigned Certifier;
— Disabled Access Certificate — DAC;
— …
View the procurement »
2016-09-30Harley Street Pedestrian/Cycle Bridge, Cork City Centre (Cork City Council)
The proposed bridge will traverse the North Channel of the River Lee between the
existing Brian Boru Bridge and St. Patrick's Bridge in Cork City Centre. The
purpose of the proposed structure is to improve pedestrian and cycle connectivity
between St. Patrick's Quay and Merchant's Quay, thereby improving the links
between the City Centre, MacCurtain Street, Kent Railway Station and the
surrounding areas. The design must include crossing facilities to the north and
south of the proposed bridge and related …
View the procurement »
2015-10-12Appointment of Architect and Design Team Commercial Office Property Development Project (Shannon Commercial Properties)
The initial infrastructure in SFZ West was installed and the 1 buildings were erected on Shannon Free Zone in 1958/1959. The area has undergone continuous development since then with the result that facilities now range in quality from the most modern office complexes, advanced manufacturing, offices and warehouses to basic 1960's style north light factory buildings. Demand for the vacant north light style buildings has weakened and appropriate regeneration is now required.
View the procurement »
2015-09-25Mechanical and Electrical Contractors Frameworks (daa plc)
The Contracting Authority proposes to set up a non-exclusive framework agreement with a number of Mechanical and Electrical Engineering Contractors for projects at Dublin Airport for the next 4 years (with an option to extend for 1 further year) subject to ongoing satisfactory performance and workload.
This RFT process is to identify suitable Tenderers for consideration for inclusion on the Framework Panel/s.
View the procurement »
2015-08-27Works Specialists with Design Input for the new children‘s hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
— The demolition of all buildings on the site of the new children's hospital;
— Construction of a new children's hospital building and associated helipad;
— A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
— Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps …
View the procurement »
2015-07-31Limerick City Footbridge — Consultants — (Lot 1 — Project Manager/Employers Representative and Quantity Surveyor and... (Limerick City and County Council)
Limerick City and County Council (The Authority) wish to appoint a design team to complete the Limerick Footbridge project. Applicants should note that the proposed development will form an iconic landmark on the Limerick City landscape and all members of the design team should have relevant bridge experience and expertise for a project of this nature.
The following design team services are required:
1. Lot 1: Project Manager/Employers Representative and Quantity Surveyor,
2. Lot 2: Single Point Design …
View the procurement »
2015-07-03Appointment of design consultant industrial / commercial property development project (Shannon Commercial Properties)
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant (Architect) to deliver and manage all consultancy services required to carry out a full detailed design which will then form the basis for the tender for construction. Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant …
View the procurement »
2015-05-26Appointment of Design Consultant Industrial Building Upgrade and Refurbishment Project (Shannon Commercial Properties)
The proposed project will include the upgrade and refurbishment of industrial buildings at Bay 37 Shannon Free Zone.
The key aim of the project is to proceed immediately with the planning, design and upgrade of a large industrial building with all associated site development and building modification works.
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant to deliver and manage all …
View the procurement »
2014-12-23Multi-Party Framework Agreement for Architect Led Integrated Design Teams (Grangegorman Development Agency)
Grangegorman Development Agency wishes to establish a Multi-Party Framework
Agreement for architect led integrated design teams to provide design and advisory services for an initial and additional call-off contracts for the development of Student Residences and related projects at Grangegorman.
The duration of the framework agreement is four years. For the avoidance of doubt Call-Off Contracts may extend beyond the life of the Framework Agreement.
The initial contract under the Framework is intended to …
View the procurement »
2014-03-28TCD-14-06 - Wind Tunnel Services (The University of Dublin Trinity College)
TCD is seeking to establish framework agreements with one or three or more suppliers for the provision of wind tunnel services. It is envisaged that this arrangement will commence on 1.6.2014 and will continue for a period of 3 years with the facility to extend for a further 1 year, subject to satisfactory supplier performance as determined by TCD, after agreement between the parties.
View the procurement »
2014-03-27CE/5218/GM - Mechanical & Electrical Services [Framework Agreement] (Iarnrod Eireann-Irish Rail)
Iarnród Éireann are advertising a call for competition for the establishment of a multi-party framework agreement. This framwework agreement will be split into 3 lots (East Region, South Region, West Region) with each lot containing a provision for Planned Preventative Maintenance Works, Un Planned Asset replacement Works, Planned Preventative Renewal Works (PPR), Provision of Technical & Skilled personal with Transport, associated tools, test equipment and CAD terminals; and Provision of Call Out / …
View the procurement »