Appointment of Architect and Design Team Commercial Office Property Development Project

Shannon Commercial Properties

The initial infrastructure in SFZ West was installed and the 1 buildings were erected on Shannon Free Zone in 1958/1959. The area has undergone continuous development since then with the result that facilities now range in quality from the most modern office complexes, advanced manufacturing, offices and warehouses to basic 1960's style north light factory buildings. Demand for the vacant north light style buildings has weakened and appropriate regeneration is now required.

Deadline

The time limit for receipt of tenders was 2015-11-23. The procurement was published on 2015-10-12.

Who? What? Where?
Procurement history
Date Document
2015-10-12 Contract notice
Contract notice (2015-10-12)
Object
Scope of the procurement
Title: Architectural design services
Quantity or scope: Lead Designer โ€” Architect and Design Team Services.100
Total value of the procurement: 100 ๐Ÿ’ฐ
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Architectural design services ๐Ÿ“ฆ

Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Body governed by public law
Awarding authority name: Shannon Commercial Properties
Postal address: 2nd Floor Arrivals Building, Shannon Airport, Co. Clare
Postal town: Shannon
Contact
E-mail: carmel.cronin@shannonproperties.ie ๐Ÿ“ง
Phone: +353 61712881 ๐Ÿ“ž
Fax: +353 61712859 ๐Ÿ“ 

Reference
Dates
Date dispatched: 2015-10-12 ๐Ÿ“…
Submission deadline: 2015-11-23 ๐Ÿ“…
Publication date: 2015-10-15 ๐Ÿ“…
Identifiers
Notice number: 2015/S 200-363002
OJ-S issue: 200

Object
Scope of the procurement
Short description:
The initial infrastructure in SFZ West was installed and the 1
The subject site (Block C) has an area of approximately 1,25 hectares and Shannon Commercial Properties has recently demolished the large block of 1960's manufacturing facility buildings (known locally as โ€˜North Lightโ€™ buildings) which were subdivided, largely unoccupied and no longer fit for purpose. The site is currently accessed from a roundabout on the National Route N19 before the main entrance to Shannon Airport. Shannon Commercial Properties will now proceed with the 1
Show more
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of design consultants to carry out a full detailed design which will then form the basis for the tender for construction.
Show more
Quantity or scope: Lead Designer โ€” Architect and Design Team Services.
Reference number: JCF15005 Architect/Design Team
Place of performance
Main site or place of performance: Co. Clare.

Procedure
Languages
Language: English ๐Ÿ—ฃ๏ธ

Contracting authority
Identity
National registration number: IE8D33317C
Contact
Contact point: Carmel Cronin
Address of the buyer profile: http://irl.eu-supply.com/ctm/Supplier/CompanyInformation/Index/1214 ๐ŸŒ
URL for participation: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=93425&B=ETENDERS_SIMPLE ๐ŸŒ
URL for documents: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=93425&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Identifiers
Reference number attributed by the contracting authority: JCF15005 Architect/Design Team
Source: OJS 2015/S 200-363002 (2015-10-12)