2019-03-14   Provision of Mechanical Maintenance Services (Athlone Institute of Technology)
The contract on offer is for the provision of services to undertake the required mechanical maintenance to campus mechanical installations and infrastructure on the campus of Athlone Institute of Technology. The successful contractor will be required to undertake all planned preventative maintenance, reactive maintenance and other services throughout the Contract term. The contract is for an initial period of 12 months, however, AIT reserves the right to extend the contract on an annual basis with a … View the procurement »
2019-02-25   Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM. The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise: Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the … View the procurement »
2019-02-25   Construction of a Food Innovation and Incubator Hub Campus (BIA Innovator Campus CLG)
Construction of a food innovation and incubator Hub Campus at Mellows, Teagasc Campus, Athenry, Co. Galway. The Campus consists of the construction of 3 separate buildings: Building 1 — BIA EOLAS/BIA OBAIR — construction of a 2 storey Learning Centre (1 200 m Gross Floor Area), Building 2 H.P.S.U. Units — construction of a single storey building (700 m Gross Floor Area), Building 3 — Incubation Units — single storey building (700 m Gross Floor Area) and general site works. View the procurement »
Mentioned suppliers: Glenman Corporation Ltd
2019-02-08   Multi Supplier Framework for the Provision of Pumps and Associated Works to Irish Water — Lots 1 and 2 (Irish Water)
The Multi-Supplier Framework will be established on a national basis and sub-divided into 2 separate lots: Lot 1: The supply and delivery of pumps, parts and accessories to Irish Water. Lot 1 is further divided down into the following sub-lots: (a) wet well submersible pump(s), (b) dry well submersible pumps(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) multistage and booster. Lot 1: tenderers shall be required to provide … View the procurement »
Mentioned suppliers: Avonmore Electrical Co Ltd Campion Mchncl Electrical Eng. Ltd Cantwell Electrical Engineering Ltd Commissioning Services Ltd Consolidated Pumps Ltd Drilling and Pumping Supplies Ltd Electrical & Pump Services Ltd Enisca Ltd Flexachem/Netzsch Manufacturing Ltd FM Environmental Ltd Grundfos (Ireland) Ltd RCC Engineering Ltd Seepex UK Ltd Tof Engineering Ltd and John Fletcher Ltd Xylem Water Solutions Ireland Ltd
2018-11-29   St.Mary's Post Primary School, Ballina, Co. Mayo, Ireland (St. Mary’s Secondary School (Ballina))
Mechanical Services Installation for new build post primary school for 650 pupils in Ballina Co. Mayo, Ireland. View the procurement »
2018-11-09   Invitation to Tender for Design Team Consultancy Services for the National Energy Efficiency Upgrade Pilot Programme... (Limerick and Clare Education and Training Board)
This contract notice is for the appointment of design team led consultancy services (DT Led by Architect or M&E Services Engineer), where the Lead Consultant shall also buy in any additional services for other disciplines as required. There are 5 lots representing schools bundled in clusters based on geographic location. An Applicant may tender for more than one lot. Refer to tender documents for further details. View the procurement »
Mentioned suppliers: A.L Architects Ltd Aidan Drennan Consulting Engineers Jerry Geaney Building Services Consultants Ltd
2018-11-02   Framework of Design and Build Modular Building Contractors for the Ireland East Hospital Group and its Constituent Hospitals (Mater Misericordiae University Hospital Ltd)
The Ireland East Hospital Group (IEHG) envisages a requirement for modular buildings on a number of its hospital sites over the coming years. In order to facilitate this requirement the IEHG is establishing a framework of design and build modular building providers. The modular building provider will be required to provide the design team and work specialists as laid out in this PQQ documentation. The framework will be established for a period of 48 months. Requirements will be drawn down by way of … View the procurement »
2018-10-15   Garda Security and Crime Operations Centre, Military Road, Dublin 8 (Office of Public Works (OPW))
The development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary accommodation on a site of circa 0,86 ha. The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as: — a gym, — locker rooms, — secure storage, — showers and toilets, — tea stations/kitchens, — private outdoor space, — along with sufficient meeting rooms and conference … View the procurement »
2018-10-12   Blackwater Community School (Blackwater Community School (Lismore))
Mechanical subcontractors (reserved specialist to the main appointed contractor) for mechanical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the … View the procurement »
Mentioned suppliers: Murphy & Kelly (Thomastown) Ltd.
2018-10-03   Maynooth University Refurbishment of Existing Arts Building (Maynooth University)
The Works Contractor contract defined as the Refurbishment of the existing Arts Building of 4 700 m accommodation which may be delivered over 2 phases. Phase 1 is circa 1 390 m which provides for reconfiguration of existing offices into modern teaching spaces and courtyard. Phase 2 is circa 3 310 m which provides reconfiguration of existing toilets, office space into modern teaching spaces. Works also include provision of new courtyard and works to existing mechanical and electrical systems. View the procurement »
2018-10-02   Kanturk National School (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 m on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage … View the procurement »
2018-10-02   Kanturk National School — Pre-qualification for Selection as Mechanical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 m on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage … View the procurement »
2018-09-21   Maynooth University Academic Building New Construction (Maynooth University)
The Works Contractor contract defined as the Academic Building New Construction comprises the new construction of 10,554 m accommodation which may be delivered across a single or 2 phases. Phase 1 is circa 5,287 m which provides for teaching spaces predominantly on ground and first floors with offices, reading and support spaces on second and third floors. Enclosed plant space is located at fourth floor. The main objective of the competition is the Phase 1, with the option to proceed with Phase 2, … View the procurement »
Mentioned suppliers: JJ Rhatigan and Company
2018-09-17   Mechanical Subcontractor (Reserved Specialist) for Scoil Mhuire Gan Smál (Scoil Mhuire Gan Smal (Blarney))
Mechanical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Mechanical installation for a new three-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and … View the procurement »
Mentioned suppliers: Dominic O'Connor Ltd.
2018-09-07   Single Party Framework for the Installation Of A Vehicle Automatic Wash Systems and Underbody Wash System (Bus Eireann/Irish Bus)
The Contracting Authority proposes commencing a Single-Party Framework Agreement for the provision of Vehicle Automatic Wash Systems and Undebody Wash Systems at a number of Bus Éireann’s vehicle depots located nationwide. The sucessful applicant will form the Single Party Framework Argreement. It is proposed that the term of the Single-Party Framework Agreement will be 4 years. View the procurement »
2018-09-06   Mechanical and Electrical Contractors Framework (Electricity Supply Board (ESB))
The Contracting Entity intends to procure a 5 party Framework Agreement with a view of mini-tendering for the provision of professional Mechanical and Electrical services to support ESB in the delivery of energy projects or other projects. View the procurement »
2018-08-13   Dunboyne Junior + Senior National Schools — Mechanical Specialist (Dunboyne Junior + Senior National School)
Expressions of interest are invited from suitably qualified Mechanical Services Contractors who wish to be considered for the mechanical works in the new senior school and junior school extension which will comprise heating, hot, cold and drinking water services, rainwater harvesting systems, toilet ventilation and above ground soils and wastes. Works also includes refurbishment of existing heating services in the existing junior school).The project will be constructed over 2 phases. View the procurement »
2018-08-08   Forensic Science Ireland (1) (Office of Public Works (OPW))
Mechanical, electrical and cleanroom specialists View the procurement »
2018-07-24   60 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development. View the procurement »
2018-07-24   Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. … View the procurement »
2018-07-06   Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team) (National University of Ireland, Galway (NUI Galway))
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in … View the procurement »
2018-07-06   Construction of new 80 Bed Community Nursing Unit at Sheil Hospital Ballyshannon (Health Service Executive (HSE))
Construction of a New 80 Bed Community Nursing Unit at Sheil Hospital, Ballyshannon View the procurement »
2018-07-04   New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services. The Works will be carried out on active hospital campus. Hospital … View the procurement »
Mentioned suppliers: Tim Kelly Electrical
2018-07-04   New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services. The Works will be carried out on active hospital campus. Hospital … View the procurement »
Mentioned suppliers: T Bourke
2018-07-04   New Centre for Radiation Oncology at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8,050 sqm in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services. The Works will be carried out on active hospital campus. Hospital … View the procurement »
Mentioned suppliers: John Paul Construction
2018-06-29   Construction of Clare County Library (Clare County Council)
The overall project will comprise construction of a new County Library on a brownfield site. The proposed project when completed will be attached to the existing Glór Theatre and consequently there will be significant works required at the interface of the two buildings including some demolition work. Applicants should note that the works will be carried out in a live environment and safe access to and full use of the Glór Theatre will be required for the duration of the works. The new building measuring … View the procurement »
Mentioned suppliers: L&M Keating Ltd
2018-06-14   St Patrick's Junior and Senior Schools Corduff (St. Patrick's JNS and SNS (Corduff))
Construction of a new conjoined school for existing Junior and Senior Primary schools. The building is 2 storey and approx. 6025 m in area. Facilities include 36 classrooms, 2 no general purpose halls, breakfast club and ancillary facilities. Works also include landscaping, play areas, car parking and site works. Phased construction on operational school site. The project will entail appointment of Reserved Specialists for Mechanical and Electrical elements only. View the procurement »
2018-06-06   HP1, LP2 and LP3 Feedwater Heater Replacement Lough Ree Power Station (Electricity Supply Board (ESB))
Lough Ree Power is a 100MWe peat fired CFB power plant. Amongst the feed water heaters employed on the water steam cycle are three vertical high pressure (HP) feed water heaters and 3 horizontal low pressure (LP) heaters. ESB plan to replace one of the HP heaters due to flow accelerated corrosion damage to its shell and internal tubing. ESB also plan to replace two LP heaters due to repeated tube leaks also. ESB invites expressions of interest for the design, manufacture, delivery, installation and … View the procurement »
2018-05-23   A Multi-Supplier Framework for the Provision of Water Services Repair and Maintenance Works to Irish Water (Irish Water)
IW is tendering to establish a Multi-Supplier Framework Agreement for the Provision of Water Services Repair and Maintenance in respect of: 1) Civil Engineering, Building and Repair Works; 2) Mechanical and Electrical Works; 3) Instrumentation Control and Automation Works. For Lots 1 and 2, Applicants are invited to specify the Local Authorities for which they want to pre-qualify in relation to each of these Lots. Lot 3 will be tendered nationally. View the procurement »
Mentioned suppliers: Able Machinery Trading Limited Anthony O' Gorman engineering Ltd. APC Enviro Ltd Avonmore Electrical Co. Ltd AxFlow Ltd Boland and Quirke Bryan & Eoin Kenny Plant Hire Ltd Butler Manufacturing Services Ltd Campion Pumps Cantwell Electrical Engineering Carty Contractors Ltd Celtic Anglian Water Champion Fire Safety COLOHAN ELECTRICAL/MECHANICAL SERVICES Conway Engineering Conwell Contracts ROI Ltd CÓRAS Pipeline Services Limited CSL Cully Automation Ltd David Walsh Civil Engineering Ltd. DDC Ltd Dive and Marine Specialist Contractors Ltd Dunne Brothers Ltd Dunne Technical Services EMR Integrated Solutions Endress+Hauser (Ireland) Ltd., Enisca Eps ESC Electric Systems & Controls Ltd Gas & Controls,, Gilmore Clarke Electrical Ltd. T/A EMCA Glan Agua Ltd GMC Utilities Group Hydro International Ltd. I.M.S. C/BHAM LTD IES Lean Systems J&F PNEUMATICS LTD James Oliver Hearty & Sons John Madden & Sons Ltd Mallwood Ltd. May Water Tech Ltd Mech & Elec Controls Megs Fabrication Ltd Michael Leonard ML Lynch Civil Engineering Ltd Noel Walsh Services & Repairs O' Brien Electrical & Control Limited Omni Instruments P & S Civil Works Ltd t/a Cleantech Civils Precia Molen Ireland Profitec Solutions Limited Rampower(Cremont Limited) Raptor Engineering Solutions Ltd. RCC Engineering Roadbridge Rogers Industrial Controls Roto Spiral Limited S Wilkin & Sons, Ltd Scaffold Elevation Int. Ltd. Scunar Teoranta Sean Quigley Contracts Ltd Sean Reihill Limited Shareridge Ltd Sludge Process Optimisation and... Source Civil Ltd Suir Plant Ltd T & L Gallagher LTD Thomas Tony O' Carroll Co. Ltd. Tobin Electric LTD Veolia Water Ward & Burke Construction Ltd. Water Control Instrumentation Ltd. Water Technology Limited Wexford Piping & Fittings Ltd Xylem Water Solutions UK Ltd
2018-04-13   Forensic Science Ireland (Office of Public Works (OPW))
Mechanical, Electrical and Cleanroom Specialists. View the procurement »
2018-02-14   Multi Supplier Framework for Pumps and Associated Works (Irish Water)
The multi-supplier framework will be established on a national basis and subdivided into 2 separate Lots detailed below: Lot 1: The Supply and Delivery of pumps, parts and accessories to Irish Water, with sublots. Lot 2: The Supply and Installation of pumps, parts and ancillary items for Irish Water with sublots. View the procurement »
2018-02-09   Multiple Operator Framework Agreement for Minor Works (Dun Laoghaire Institute of Art Design & Technology)
Dun Laoghaire Institute of Art Design and Technology (IADT), together with the Institute of Technology Blanchardstown (ITB) and the Institute of Technology Tallaght (ITT) invites submissions from competent and reputable Contractors to become members of a Framework Agreement for Minor Works. The works to be carried out under the Framework Agreement will comprise minor works projects including but not limited to: — internal and external refurbishment works, — painting and decorating, — building fabric … View the procurement »
2018-01-10   Saggart Reservoir – Construction works (Irish Water)
Saggart Reservoir site is a key strategic operational water transfer and storage facility. It comprises existing storage reservoirs and secondary chlorination plant from where water is distributed to other strategic service reservoirs in the Dublin region. It is intended that the works will be implemented under a design and build contract. Scope of works. Works are now required at the existing Saggart site comprising the following: - 100000 m3 covered storage comprising 2 cells with inlet and outlet … View the procurement »
2018-01-05   Establishment of a Single Operator Framework for Enabling Works; The National Maternity Hospital at St Vincent's... (Health Service Executive (HSE))
The works relate to the creation of a single operator to deliver a series of enabling works in connection with The NMH relocation to the campus of SVUH. Such works will include but are not limited to, the following: 1) The provision of temporary service supplies including laboratory gases, N2O, LTHW, etc., and all associated works; 2) The provision of permanent service supplies including M, LV, FA, Oil, NG, Comms, etc., and all associated works; 3) Decommissioning of existing services and associated … View the procurement »
2017-12-15   Construction of a New Student Accommodation and ancillary student support facilities at Victoria Cross, Cork for... (University College Cork (UCC))
The project consists of the demolition of the existing structures on site including the now derelict Crow’s Nest public house and restaurant, four 2-storey dwellings at 1-4 Victoria Terrace and the existing machinery shed and yard. The construction of a student accommodation building comprising approximately 255 student accommodation bed spaces and ancillary student support facilities at ground floor level including laundry, admin office, meeting room, and common rooms. A medical facility/wellness center … View the procurement »
Mentioned suppliers: John Sisk and Sons (Holdings) Ltd
2017-12-15   Redevelopment of Leopardstown Racecourse (Horse Racing Ireland (HRI))
Leopardstown Club Ltd wishes to appoint a contractor for the redevelopment of the following items at Leopardstown Racecourse, Foxrock, Dublin: — Racing hall & street area — Level 0 — Grandstand, — Museum bar and toilet block — Level 1 — Grandstand, — Toilet blocks & terrace – Level 2 — Grandstand, — Window replacement – Level 3 — Grandstand, — Conversion of former Saddling stalls, — Children's play area, — Prize winners podium, — New Saddling stalls and PreParade ring, — New weighroom building, — New … View the procurement »
Mentioned suppliers: Duggan Brothers Contractors Ltd
2017-12-14   Development of new sports campus for Institute of Technology Carlow (Institute of Technology Carlow)
Development of new sports campus for IT Carlow at Mortarstown, Kilkenny Road, Carlow. The works will be delivered over 2 separate phases. This pre qualification competition is for Stage 1 only and the works in Phase 1 consists of the following: — 1 x grass GAA Pitch, — 1 x all weather GAA pitch, — 2 x grass rugby pitches, — 2 x grass soccer pitches, — car park, access roads, footpaths, new entrance and walking track, — associated site works, services and landscaping. View the procurement »
Mentioned suppliers: Tony Patterson Sportsgrounds Ltd
2017-11-27   City NorthWest Quarter Regeneration (CNWQR), Phase2A, Construction of 47 Dwellings, consisting of 11 nr. 3 storey &... (Cork City Council)
Housing development at: City North West Quarter Regeneration (CNWQR), Phase2A. Comprising of the Construction of 47 Dwellings, in which there are 11 nr. 3 storey houses, 21 nr. 2 storey houses and 15 nr. apartments in 5 blocks, with associated site works, landscaped park area and road upgrading. View the procurement »
Mentioned suppliers: Murnane & O'Shea Limited
2017-10-06   Proposed New School for St. Patrick's Special School, at Upper Dumgold, Enniscorthy for the Department of Education... (Department of Education and Skills)
The development consists of the construction of a mainly single storey and part 3 storey school building of 5 940 m, containing 20 classrooms, junior and senior dining areas, general purpose hall and specialist teaching areas. This RFT is for Mechanical Installation Reserved Specialists. View the procurement »
2017-09-19   The Supply of Three Surface Profilers — Mechanical Step Height Measurement Systems (University College Cork ( UCC ))
The Supply of Three Surface Profilers — Mechanical Step Height Measurement Systems for Tyndall National Institute, University College Cork. View the procurement »
Mentioned suppliers: CN Technical Services Ltd
2017-07-31   Sports Pitches Development, University of Limerick — Main Contractor & Electrical Contractor (University of Limerick)
The development will consist of synthetic all weather pitches to an approximate total area of 35 000 m² capable of accommodating two (2) full size GAA pitches or four (4) full size soccer pitches, one (1) natural turf pitch measuring approximately 150m x 100m and capable of use by all field sports, two (2) hurling walls, flood lighting, access roads, coach parking / set down, storage building approximate size 200 m2, site services, associated site development works and landscaping. View the procurement »
Mentioned suppliers: Tony Patterson Sportsground Limited
2017-07-31   50 m Swimming Pool, University of Limerick — Boom Replacement (University of Limerick)
The works comprise the design, fabrication and installation of a replacement Boom to the existing 50 m swimming pool. The Preferred Specialist will be novated to a Main Contractor to be appointed later. View the procurement »
Mentioned suppliers: Variopool B.V.
2017-06-29   Carrigaline Education Campus — Mechanical Installation for 3 new schools (Cork Education and Training Board)
Cork Education and Training Board (CETB) invites Mechanical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Mechanical installation for the new 3-school, 8.6 ha, Carrigaline Education Campus, comprising (i) a 2-storey, split-level Gaelcholáiste (5 680 m) for 500 pupils, including learning, administration and ancillary spaces, a physical education hall and outdoor ball courts; (ii) a 24 classroom, 2-storey, split level school (3 748 m), to accommodate the Gaelscoil, including … View the procurement »
Mentioned suppliers: Murphy and Kelly (Thomastown) Ltd
2017-06-29   Works Contractor and PSCS for new Renal Dialysis Unit (The Adelaide and Meath Hospital, Dublin Incorporating The National Children's Hospital)
Renal Dialysis Unit at the Adelaide and Meath Hospital Dublin incorporating the National Children's Hospital (Tallaght Hospital). The development will consist of a new two storey extension on the roof of the existing Emergency Department located on the east side of the campus at Tallaght Hospital, to provide new patient accommodation including a new renal dialysis unit incorporating treatment areas, support rooms and offices, two new stair and lift blocks and associated site works including plant rooms, … View the procurement »
2017-05-16   Boiler Tube Replacement Moneypoint Framework Agreement (Electricity Supply Board (ESB))
ESB invites expressions of interest for the following: Design, manufacture, delivery and installation of Boiler components on the three 305MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Moneypoint Generating Station. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the three are expected to take place during outages in 2018 (two units in series) and in 2019 (one unit). Outage dates may … View the procurement »
Mentioned suppliers: Alstom Ireland Ltd.
2017-05-08   Mechanical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete mechanical services installation and sub-specialists works (Heating, plumbing, soils and Wastes, BEMS etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site boundary treatment with landscaping to include connection to external perimeter pavement. The total floor area of … View the procurement »
Mentioned suppliers: GMG Mechanical Services Ltd
2017-05-08   Electrical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete electrical services installation and sub-specialists works (CCTV, Security, Fire alarms, Access controls, LV Switchgear, Lighting controls, Emergency Lighting, small power, induction loops, lightning protection etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site … View the procurement »
Mentioned suppliers: MAC Electrics Ltd