This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021. A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage. The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public.
Deadline
The time limit for receipt of tenders was 2018-08-24.
The procurement was published on 2018-07-06.
Contract notice (2018-07-06) Object Scope of the procurement
Title: Construction work
Reference number: NUIG/BUILD/036/2018
Short description:
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage.
The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public.
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage.
The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public.
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Construction work๐ฆ
Additional CPV: Site preparation work๐ฆ Place of performance
NUTS region: รire/Ireland
๐๏ธ
Procedure
Procedure type: Restricted procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
Refer to Project Information Memorandum for additional information in relation to this procurement.
Object Scope of the procurement
Short description:
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage.
The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public.
Estimated total value: 40 000 000 EUR ๐ฐ
Short description:
The proposed development will be located (subject to successful receipt of planning) on a green field site north of the existing Corrib village student accommodation (between the Bioscience Research Building and the Park and Ride facility).
The development will consist of the design and construction of 471 no. bedspaces, generally arranged in cluster of 4-6 5 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development.
The development will consist of the design and construction of 471 no. bedspaces, generally arranged in cluster of 4-6 5 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development.
Estimated value excluding VAT: 40 000 000 EUR ๐ฐ
Duration: 36 months Place of performance
Main site or place of performance: Galway
Legal, economic, financial and technical information Conditions for participation
Suitability to pursue the professional activity: Refer to conditons set out in the Suitability Assessment Questionnaire documents
Contract execution
Contract performance conditions:
Refer to perofrmance conditions set out in the Suitability Assessment Questionnaire
Procedure
Legal basis: 32014L0024
Maximum number of candidates: 8
Time of receipt of tenders: 12:00
Date of dispatch of invitations: 2019-02-08 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tender validity period: 2019-02-24 ๐
Complementary information Review body
Name: The High Court of Ireland
Postal address: High Court Central Office, Four Courts Inns Quay
Postal town: Dublin 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886125๐
E-mail: highcourtscentraloffice@courts.ie๐ง
Internet address: http://www.courts.ie๐ Service from which information about the review procedure may be obtained Same as: Review body
Source: OJS 2018/S 130-295655 (2018-07-06)
Additional information (2018-08-15) Object Notice metadata
Document type: Additional information
Common procurement vocabulary (CPV)
Code: Building construction work๐ฆ
Reference Dates
Date dispatched: 2018-08-15 ๐
Submission deadline: 2018-09-03 ๐
Publication date: 2018-08-18 ๐
Identifiers
Notice number: 2018/S 158-361343
Refers to notice: 2018/S 130-295655
OJ-S issue: 158
Additional information
The prequalification response deadline has been extended. The response deadline is now 12:00 (noon) on Monday 3.9.2018. All other submission details remain unchanged.
Source: OJS 2018/S 158-361343 (2018-08-15)
Contract award notice (2019-09-25) Object Scope of the procurement
Short description:
This project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1
A single point design team including PSDP has been appointed by NUI Galway (refer to pre-qualification information memorandum) and will be novated to the works contractor at contract award stage.
The works contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the public.
This project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1
A single point design team including PSDP has been appointed by NUI Galway (refer to pre-qualification information memorandum) and will be novated to the works contractor at contract award stage.
The works contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the public.
Notice metadata
Document type: Contract award notice
Procedure
Type of bid: Not applicable
Award criteria
Lowest price
Reference Dates
Date dispatched: 2019-09-25 ๐
Publication date: 2019-09-30 ๐
Identifiers
Notice number: 2019/S 188-456500
OJ-S issue: 188
Additional information
Refer to project information memorandum for additional information in relation to this procurement.
Object Scope of the procurement
Short description:
This project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1
This project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1
A single point design team including PSDP has been appointed by NUI Galway (refer to pre-qualification information memorandum) and will be novated to the works contractor at contract award stage.
The works contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the public.
The proposed development will be located (subject to successful receipt of planning) on a green field site north of the existing Corrib village student accommodation (between the bioscience research building and the park and ride facility).
The development will consist of the design and construction of 471 no bedspaces, generally arranged in cluster of 4-6 5 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development.
The development will consist of the design and construction of 471 no bedspaces, generally arranged in cluster of 4-6 5 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development.
Place of performance
Main site or place of performance: Galway.
Source: OJS 2019/S 188-456500 (2019-09-25)