2025-12-19   Greville Arms Hotel Construction of new lift shaft under the EU Just Transition Fund (Greville Arms Hotel)
Construction of new lift shaft within existing hotel to serve Ground, First, Second, Third floors and all associated site works and services. Lift supply and installation by seperate contract to be managed by main contractor. Located at the Greville Arms Hotel, Pearse Street, Mullingar, Co. Westmeath. View the procurement ยป
2019-09-30   Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team) (National University of Ireland, Galway (NUI Galway))
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly student accommodation on campus. The development will consist of the design and construction of 674 no. bedspaces in 125 number apartments, generally arranged in clusters of 4-6 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, internal plant/service rooms, refuse storage and covered cycle storage โ€ฆ View the procurement ยป
2018-07-06   Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team) (National University of Ireland, Galway (NUI Galway))
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1.12.2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in โ€ฆ View the procurement ยป
2016-04-14   National University of Ireland, Galway โ€” New Student Accommodation (NUI Galway New Student Accommodation NUIG/BUILD/007/2016) (National University of Ireland, Galway (NUI Galway))
The development will consist of the design and construction of 429. no bedspaces, generally arranged in 57 units of 6 en-suite bedrooms, 11 units of 5 en-suite bedrooms and 8 units of 4 en-suite bedrooms, with communal living area in each unit. Further communal areas and facilities, ancillary office/reception accommodation, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development. The development will be in 1 no 5 storey block and โ€ฆ View the procurement ยป
2008-06-27   Hotel and restaurant services (An Garda Sรญochรกna)
Title attributed to the contract by the contracting authority: Temporary training, Accommodation and Associated Facilities for Continuous Professional Training. An Garda Sรญochรกna invites tenders for the provision of Training and accommodation facilities for Continuous Professional Training for An Garda Siochana. View the procurement ยป