Procurements: Electrical engineering installation works (page 3)
2020-08-14Building Services (M&E) Engineering Services for Additional Accommodation at Scoil Eoin Naofa, Roscrea (Scoil Eoin Naofa (Roscrea))
Building Services (M&E) engineering services for additional accommodation at Scoil Eoin Naofa, Roscrea. Scoil Eoin Naofa is a primary school under the trusteeship of the Diocese of Killaloe.
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 2 classrooms: 80 m each;
• 1 SET Room: 15 m.
Giving a floor area including circulation and internal walls of: 224 m.
Section B
• 1 Classroom SEN Base 167 m;
• Giving a floor area (incl …
View the procurement »
2020-07-27Solar EPC Frameworks (EDF Renewables Ireland Ltd)
Non-exclusive utility-scale PV solar Engineering, Procurement and Construction (‘EPC’) framework agreements, for EDF Renewables' Ireland projects. Includes O&M services during defects period.
View the procurement »
2020-05-29Inclusion on a Framework Agreement for Provision of Grid Services to Coillte’s Renewable Energy Business (Coillte CGA)
Coillte wishes to appoint a framework of grid consultants to provide advice and support related to the grid connection, substation design, electrical balance of plant (EBOP) and civil balance of plant (CBOP) of various renewable energy and energy storage projects, and associated electrical infrastructure. To this end we now invite suitably qualified candidates to express an interest in this competition in respect of the areas of expertise (lots) outlined in the summary document attached. Please note that …
View the procurement »
2020-05-27Electrical Installation and Maintenance Services (Cork Institute of Technology)
This request for tender (RFT) invites suitably qualified service provider to deliver electrical maintenance services to Cork Institute of Technology (CIT). It is anticipated that the contract will start in Q3 2020 and run for an initial period of 3 years, with options to extend for a further two 1-year periods.
View the procurement » Mentioned suppliers:Dornan
2020-04-23Supply and Install Solar PV Solutions (Electricity Supply Board (ESB))
The contracting entity intends to procure a single supplier framework for the supply and install solar PV solutions, and related services, to commercial and industrial customers.
The scope of the service design, procure, supply, install, commission and maintain all elements of ground-mounted and roof-mounted solar PV projects. The projects will be located in the Republic of Ireland on commercial premises. Applicants must be able to provide the full scope of services of a solar EPC contractor, including …
View the procurement » Mentioned suppliers:Grange Solar
2020-04-15New Bailieborough Garda Station — Electrical Contract (Reserved Specialist Procedure) (Office of Public Works (OPW))
Electrical element of works. Main works:
— demolition of a three storey rear extension to the north of the NIB building, concrete building to rear of NIB building and out-buildings;
— conservation of NIB building;
— construction of a new three storey over basement building, linked to NIB building at ground and first floor level, with a partial plant storey at roof level;
— provision of carparking, bicycle and motorcycle parking;
— landscaping of external forecourt to include replacement accessibility …
View the procurement »
2020-01-17Rockcorry Scoil Mhuire Roll No 10429W — Extension and Refurbishment — M+E Engineers (Cavan and Monaghan Education and Training Board)
New build (2-storey)
5 x classrooms including WCs and storage (80 m)
1 x library and resourse area combined including storage (60 m)
1 x multipurpose room (20 m)
1 x general office (15 m)
1 x staff room (20 m)
1 x universal accessible toilet/shower for assisted users (10 m)
1 x adult toilets (4 m)
1 x general storage (20 m)
1 x DCC and electrical (4 m)
1 x boiler house (9 m).
Refurb existing building
1 x general purpose room (140 m)
1 x general purpose room servery (8 m)
1 x P.E. equipment store (15 m)
1 …
View the procurement »
2019-11-25Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
Oweninny Power 2 DAC, the contracting entity, is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The contracting entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project.
Oweninny Phase 2 wind farm is an 83 MW project located adjacent to the existing 89 MW Oweninny Phase 1 …
View the procurement » Mentioned suppliers:H&MV Engineering Ltd
2019-11-07Higher Education PPP Programme — Bundle 1 PIM PQQ (National Development Finance Agency)
Following on from the Prior Information Notice (‘PIN’) (TED reference 2019/S 189-458583), the National Treasury Management Agency (describing itself as the National Development Finance Agency) (the ‘NDFA’) for and on behalf of the Department of Education and Skills (as Sanctioning Authority) and the Higher Education Authority (as Sponsoring Agency) gives notice of its intention to procure, by Public Private Partnership (‘PPP’), the design, build, finance, operation and maintenance of a number of new …
View the procurement » Mentioned suppliers:Enbarr Education Limited
2019-09-06Samuel Beckett Civic Campus Phase 2: Electrical Services (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line.
Phase 1 included a sports and community building, sports pitches and surface car parks.
Phase 2 will expand on phase 1 and will include the following:
A. The change of use of the Phase 1 sports and community building to a library and community building;
B. Refurbishment of the existing sports building to create a new library;
C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s …
View the procurement »
2019-06-08Design Team Services for Additional Accommodation for Dominican College (Dominican College Wicklow)
The project comprises:
— 3 science laboratories,
— 2 science preparation areas,
— 1 design and communication graphics room,
— student toilets including a universal toilet,
— staff toilets,
— locker space,
— conversion of 2 existing science laboratories to classrooms,
— gross floor area of new accommodation including circulation and partitions: 620 m.
View the procurement »
2018-11-20Electrical Balance of Plant — Cloncreen Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a 21 turbine wind farm and associated infrastructure at Cloncreen bog in eastern Co. Offaly, approximately 4.5 kilometres southwest of Edenderry and 4 kilometres east of Bord Na Móna’s 84 MW Mount Lucas wind farm. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme (RESS) auction in either 2019 or 2020. Expressions of interest are being …
View the procurement » Mentioned suppliers:H&MV Engineering
2018-10-02Kanturk National School — Pre-qualification for Selection as Electrical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 sqm on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil …
View the procurement »
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:Tim Kelly Electrical
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:T Bourke
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-12-22Electrical Engineering — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd
2016-07-0616/085 — Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract (Irish Water)
As part of the Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract, Irish Water on behalf of Ervia plans to undertake the following:
— Construction of a new 80MLD Water Treatment Plant (WTP);
— Upgrade of the Existing Vartry Reservoir Intake including new siphon pipework;
— Increase the capacity of the existing Vartry Reservoir Spillway;
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated …
View the procurement » Mentioned suppliers:Veolia Water Ireland Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately 17 000 m2. The building will provide direct linkages to the existing hospital buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities must remain uninterrupted at all times during the Works.
View the procurement »
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd
2016-06-29120 bed development for the National Rehabilitation Hospital, Dunlaoghaire, Co. Dublin; Mechanical Services... (National Rehabilitation Hospital)
The project comprises the construction of 120 bed ward accommodation including
en-suite bathroom facilities at Dunlaoghaire Co. Dublin.
The proposed building will be comprise a gross floor area of approximately
17 000 m2. The building will provide direct linkages to the existing hospital
buildings and will include demolitions and associated site works.
The Works will be carried out on active hospital campus site. Hospital activities
must remain uninterrupted at all times during the Works.
View the procurement »
2016-02-23Blanchardstown Regional Drainage Scheme (BRDS) 9C Sewer Duplication and Storage (Ervia)
— Approximately 3.2 km of pipeline (diameters ranging from approximately
1 500 mm to 1 800 mm) installed using trenchless techniques
— Underground storage tanks with an approximate total capacity of 30 000 m³ to cater for stormwater flows and flow balancing
— New Pump Station to lift flows (approximately 350l/s) from the proposed sewer to the existing sewer
— Stormwater return pumps to return flows from the storage tanks to the existing
9C Sewer (approximately 320/ls)
— Diversion of the existing live 1 …
View the procurement »