Procurements: Ancillary works for pipelines and cables (page 2)
2022-07-08Glenamuck District Roads Scheme (Dun Laoghaire-Rathdown County Council)
DLRCC is seeking to establish a Single Party Framework Agreement for Major Civil Engineering Works with an initial contract for a works contractor to construct the Glenamuck District Roads Scheme (GDRS) comprising the following main elements;
• GDDR - approximately 890m of dual carriageway and 660m of two lane single carriageway road
• GLDR - approximately 1800m of single carriageway road
• Existing road upgrades
• New / upgraded Signalised Junctions
• Surface water drainage including sewers, culverts, a …
View the procurement »
2022-06-13Ballygiblin National School SWS 2022, Heating System Upgrade (Tipperary Energy Agency)
The project consists of the decommissioning and removal of the existing oil boiler and associated single pipe distribution network, and the installation of a new LPG cascade boiler configuration, a new two pipe distribution network that is future proofed and capable of supporting the integration of renewable heating solutions such as heat pumps, and compliant to current DoE TGD’s. The mechanical contractor must include for all electrical attendances, civil and builders works, and making good after installation.
View the procurement »
2022-03-29The Design and Build of 400kV Shannon Estuary Cable Project (Electricity Supply Board ( ESB ))
The Contracting Entity intends to procure a Contract for the Design and Build of 400kV Shannon Estuary Cable Project.
The Contracting Entity requires the manufacture and installation of a 400kV land and subsea cable circuit in the South of Ireland. The new 400 kV cable circuit is required to be installed in the Shannon Estuary and adjoining lands to connect Moneypoint 400 kV Gas Insulated Switchgear (GIS) Substation to a 400kV Air Insulated Switchgear (AIS) compound within Kilpaddoge 220 kV …
View the procurement »
2022-02-2322/003- Water and Wastewater Network Services and Works (WNSW) Sub – contractor List (Irish Water)
Irish Water wishes to appoint a number of Regional Services and Works Contractors (Regional Contractors) to assist in achieving its network improvement targets through targeted capital works. It is expected that these Regional Contractors will require large numbers of sub-contractors to supplement their own resources.
The purpose of this Expression of Interest (EOI) is to establish a list of sub-contractors that these Regional Contractors may choose to appoint over the duration of the project.
This …
View the procurement »
2022-01-06UCD - Framework Agreements for Building Construction Works (University College Dublin ( UCD ))
UCD (and any wholly owned subsidiary thereof), is issuing this Project Information Memorandum and the accompanying Suitability Assessment Questionnaires (SAQ) in order to obtain information from Applicants to determine their suitability on the basis of financial standing, technical competence and capability, and relevant experience to carry out the projects under these two framework agreements. Separate SAQ’s for each of Lots 1and 2 are included in the accompanying documentation. Applicants should only …
View the procurement »
2021-09-30Glashaboy River (Glanmire/Sallybrook) Drainage Scheme (Cork City Council)
Construction of flood defence works in Glanmire/Sallybrook and environs. The proposed works are as described in the Works Requirements (including drawings and specification). Works will include the construction of new flood defence walls (reinforced concrete and precast elements), embankments, reconstruction of existing bridges, new reinforced concrete culverts, pumping stations, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement »
2021-09-28Major Civil Engineering Works Contractor Frameworks (Clonburris Infrastructure Ltd)
Clonburris Infrastructure Ltd (The Contracting Authority) is seeking to establish a multi-party framework agreement for Major Civil Engineering Works Contractor Frameworks (Large Works Plus €2million)). The successful framework members will also provide M&E specialist works for wastewater pumping station(s), landscaping specialist works for strategic parks, Traffic signals specialist works, public lighting specialist works and playground specialist works and small building/park pods works
View the procurement »
2021-08-09Telecommunications Fibre Installation and Maintenance Works (Ervia)
• Cable installation
• Cable removal
• Fibre splicing & Terminating
• Fibre testing
• Splice joint installation and associated works
• Splice joint repair
• Duct and sub-duct supply, installation, proving and testing
• Provision of photographic records both prior to and post each day’s activity on site
• Emergency maintenance works
• Standby & Emergency Cover
• Provision of as-built information
• Supply of fibre optic cable
• Service works
• Provision of resources
View the procurement » Mentioned suppliers:Total Splicing Solutions Limited
2021-05-19Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2021-05-17The Supply, Installation, Commissioning Support and Maintenance of a Duplex Reverse Osmosis Water Treatment System (Beaumont Hospital)
The contracting authority requires the design, manufacture, supply, installation and commissioning of a duplex reverse osmosis system for use with eight washer/disinfectors in its central sterile supplies department at Beaumont Hospital. Following the expiry of a warranty period of 12 months’ duration, a contract for the support and maintenance of the equipment of 4 years’ duration will be awarded. The contracting authority reserves the right, upon the expiry of this 4-year contract, to award subsequent …
View the procurement » Mentioned suppliers:Greencastle Technology Ltd
2021-04-29Overhead Line Construction for North-South 400 kV Interconnector under a Multi-contractor Framework Agreement (Electricity Supply Board (ESB))
Electricity Supply Board (ESB) proposes procuring a multi-contractor framework agreement for the installation of a North-South 400 kV overhead line. ESB is undertaking the procurement of the framework agreement on behalf of itself for works in the Republic of Ireland (ROI) and on behalf of Northern Ireland Electricity Networks Ltd (NIE Networks) for works in Northern Ireland (NI) and is the contracting entity for the purposes of this Procurement. The successful contractors to this framework agreement …
View the procurement »
2021-03-26Basement and Parcel 1 Works Package (Limerick 2030 Strategic Development DAC)
Contract B construction consists of the following:
Basement
— the construction of a single level basement of circa 8 000 m which will accommodate 150nr. car parking spaces, plant rooms, stairs and lift cores etc.;
— design and installation of secant pile wall;
— the basement will be common to a number of buildings with common services;
— the basement will incorporate foundations for substructure for other buildings within the development.
Parcel 1: One Opera Square
— One Opera Square will be a 6 story …
View the procurement » Mentioned suppliers:John Sisk & Sons (Holdings) Ltd
2021-03-19Royal Canal Greenway Phase 3 (Dublin City Council)
The project consists of a Greenway route along the bank of the Royal Canal over an approximate 2.1 km length between North Strand Rd (Newcomen Br) and Phibsborough Rd (Cross Guns Br).
Further details are provided in the tender documentation and RFT 185616 available on www.etenders.gov.ie
View the procurement »
2020-11-05New Student Centre (Completion Contract) (University of Limerick)
The new student centre comprises the construction of a three storey over partial basement student centre, floor area approximately 3 600 m, providing a foyer space, auditorium (150 seat), meeting rooms, offices, a shop and coffee dock, along with new landscape paving and external works including enclosed bicycle shelters.
View the procurement »
2020-07-09Bilberry to City Centre Greenway Link — Civil Works Contract (Waterford City and County Council)
Improvements to the 2.1 Km section of existing Greenway from the Bilberry Car Park to the Clock Tower at Waterford City Centre, works will comprise a combination of the following:
1) 1.6 Km's of 4 m wide Greenway along an existing road and 0.5 kms of 6 m wide Greenway parallel to an existing Quay Flood Wall;
2) construction of 2 x 4 m wide board walk structures approximately 150 m each in length;
3) boundary treatment comprising a combination of RC retaining walls, ‘perma crib’ type walls, stone faced …
View the procurement » Mentioned suppliers:John Cradock Ltd
2020-06-17Water Purification System to the Defence Forces Ireland (Defence Forces Ireland)
The Irish Defence Forces Corps of Engineers requires water purification systems for use on overseas service with the united nations and to support Defence Forces operations in Ireland. These water purification systems should be capable of supporting operations in all climates, with an approximate purified water production rate greater than 4 000 litres per hour. The water purification units should be self-contained and powered by an external generator or electrical supply to be supplied by the Irish …
View the procurement » Mentioned suppliers:Coffey Construction (I) LtdKarcher Futuretech
2020-06-03Multi Supplier Framework Agreement for Unplanned Building Maintenance Services (Bus Eireann/Irish Bus)
Bus Éireann proposes establishing a new framework agreement for the provision of unplanned building maintenance services to a number of sites, accommodation units and facilities located throughout the Republic of Ireland for a four (4) year period.
Bus Éireann has a requirement for the following eight service disciplines on an on-demand basis:
• building maintenance works,
• mechanical and electrical services,
• painting and decorating,
• GAS services,
• roofing specialist,
• heating and ventilation …
View the procurement »
2020-05-29Inclusion on a Framework Agreement for Provision of Grid Services to Coillte’s Renewable Energy Business (Coillte CGA)
Coillte wishes to appoint a framework of grid consultants to provide advice and support related to the grid connection, substation design, electrical balance of plant (EBOP) and civil balance of plant (CBOP) of various renewable energy and energy storage projects, and associated electrical infrastructure. To this end we now invite suitably qualified candidates to express an interest in this competition in respect of the areas of expertise (lots) outlined in the summary document attached. Please note that …
View the procurement »
2020-05-15Demolition and Enabling Works Package (Limerick Twenty Thirty Strategic Development DAC)
The opera Site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place. This demolition and enabling works package includes installation of hoarding, site clearance, temporary works, building demolition, surface water management, engagement with local utilities for water, gas and electricity while ensuring that both the conservation buildings on the site and the ecology of the site is protected.
View the procurement » Mentioned suppliers:John Sisk and Son (Holdings) Ltd
2020-02-19GMIT (CUA) Single Operator Framework Agreement Telecoms 2020 (Galway Mayo Institute of Technology)
GMIT wishes to establish a single party framework for Landline, PRA (initially), migrating to SIP and associated equipment supply, delivery, core equipment installation, project management and maintenance services.
Please note that the following contracting authorities may use this framework throughout its’ lifetime (within the 10 years). However, it is not envisaged that Letterkenny Institute of Technology and Institute of Technology Sligo will utilise this framework within the first 12 months.
— …
View the procurement » Mentioned suppliers:Hibernia Services Trading as Evros...Vodafone Ireland Ltd
2020-02-07Phase 1 Improvement Works to the Great Southern Greenway, Limerick (Limerick City and County Council)
The project involves improvement works to over 40 km of existing greenway which runs from Rathkeale to the Kerry border. The main components of works included in phase 1 are:
— widening of the existing trail,
— resurfacing of the existing trail,
— drainage upgrades,
— upgrade of farm crossing points,
— repair of 5 No pedestrian bridges,
— improvements to public and private road junctions,
— construction of various ancillary works.
View the procurement » Mentioned suppliers:Roadbridge
2020-02-05Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »