2017-05-16Boiler Tube Replacement Moneypoint Framework Agreement (Electricity Supply Board (ESB))
ESB invites expressions of interest for the following: Design, manufacture, delivery and installation of Boiler components on the three 305MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Moneypoint Generating Station. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the three are expected to take place during outages in 2018 (two units in series) and in 2019 (one unit). Outage dates may …
View the procurement » Mentioned suppliers:Alstom Ireland Ltd.
2017-05-15New IDA Advanced Technology Building, Limerick (IDA Ireland)
The Construction and completion of an advanced technology building including reinforced concrete foundations and ground floor slab, block-work and re-inforced concrete rising walls, steelwork frame, cladding,external facade/finishes (TBC), RC and block-work walls and partitions. Composite floors and stairs, glazing and doors, M&E Installations, lifts and associated site-works.
View the procurement » Mentioned suppliers:K and J Townmore Construction Ltd
2017-05-11Social Housing PPP Bundle 1 — Contract Notice PIM PQQ (National Development Finance Agency)
Following on from the Prior Information Notice (‘“PIN”’) (TED Reference 2017/S 074-141031), the National Treasury Management Agency, describing itself as the National Development Finance Agency, acting for and on behalf of the Department of Housing, Planning, Community and Local Government (‘DHPCLG’) (as Sanctioning Authority ) and Dublin City Council (‘“DCC”’) (as Sponsoring Agency), intends to procure the Social Housing PPP Bundle 1 (the Project) to design, build, finance, operate and maintain six …
View the procurement » Mentioned suppliers:Comhar Housing Ltd
2017-05-08Mechanical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete mechanical services installation and sub-specialists works (Heating, plumbing, soils and Wastes, BEMS etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site boundary treatment with landscaping to include connection to external perimeter pavement. The total floor area of …
View the procurement » Mentioned suppliers:GMG Mechanical Services Ltd
2017-05-08Electrical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete electrical services installation and sub-specialists works (CCTV, Security, Fire alarms, Access controls, LV Switchgear, Lighting controls, Emergency Lighting, small power, induction loops, lightning protection etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site …
View the procurement » Mentioned suppliers:MAC Electrics Ltd
2017-05-05External Bespoke Way-finding Signage for NUI Galway (National University of Ireland, Galway (NUI Galway))
National University of Ireland Galway (NUI Galway) is undertaking a competitive tendering process under the Open procedure for the provision of bespoke external way-finding signs under a single supply contract.
The campus has a range of sign types and mapping that has been installed over time and now provides an inconsistent message.
The aim is to rationalise all this signage, taking out the existing and installing new, better designed and more user focussed signage.
View the procurement » Mentioned suppliers:Trueform Engineering Ltd
2017-05-03South East Framework for Pavement and associated Minor Works (Carlow County Council)
The Procuring Authority on behalf of Waterford, Wexford, Kilkenny and Carlow County Councils wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for Transport Infrastructure Ireland (TII) funded road schemes. The proposed number of framework contractors will be minimum 3 and maximum 8. The Framework Period will be 24 months but may be extended by a further 24 months in 12 months increments such that the total Framework Period will …
View the procurement »
2017-04-28Dunkettle Interchange Upgrade Scheme Works (Transport Infrastructure Ireland (TII))
Transport Infrastructure Ireland (TII), intends to procure a civil engineering construction contractor to design and construct the Dunkettle Interchange Upgrade Scheme, comprising the upgrade of the existing interchange to a largely free flow involving, including but not limited to, the construction of a number of new structures (including over the railway); new road links including all earthworks, drainage and pavement; signage and lining; landscaping; environmental mitigation; culverts; roundabouts; …
View the procurement » Mentioned suppliers:John Sisk and Son (Holdings) Ltd
2017-04-27Ring Helvick Water Supply Scheme (Irish Water)
Ring Helvick Water Supply Scheme works are:
Connection to the existing water supply network.
new pumping station
2 No. reservoir sites
Installation of a 6 150 m 250 mm rising main with surge vessel
2 No. 150 m³ reservoirs
Construction of a control building
Installation of pumping plant and equipment
Installation of 640 m of 125 mm OD SDR11 HDPE rising from the Lower Reservoir site to the Upper Reservoir site.
Construction of 1 No. 300 m³ reservoir
Installation of 5 970 m of distribution pipework
Civil …
View the procurement » Mentioned suppliers:David Walsh Civil Engineering Ltd
2017-04-26Tank Painting at the NORA Ringsend Oil Storage Facility (National Oil Reserves Agency)
The National Oil Reserves Agency (NORA) has entered into a long term lease with the Electricity Supply Board (ESB) for nine storage tanks at Ringsend in Dublin (the Tank Farm), ranging from 24.4 m to 34 m in diameter and approximately 14.3 m to 14.5 m in height. The 9 tanks are in 2 bunds (tanks 4, 5, 6 and 7 in Bund 1 and tanks 8, 9, 10, 11 and 12 in Bund 2).
NORA now intends to commence a tank painting programme, starting with Tank 4 and Tank 5 only during 2017. Depending on its tank painting programme …
View the procurement »
2017-04-25HBS Upgrade / Baggage Integrators (daa plc)
Daa currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the Daa wishes to procure the services of a baggage integrator(s) for three (3) Lots (Dublin T1, Dublin T2 and Cork) to act as design and build contractor for the design, supply, installation, testing and commissioning and …
View the procurement »
2017-04-24Contract for the Design and Delivery of a Sustainable Integrated Mixed Tenure Housing Development at Kilcarbery, Dublin 22 (South Dublin County Council)
The project is for the development of a site at Kilcarbery, Dublin 22 for a sustainable, mixed tenure housing development in accordance with the Kilcarbery Grange Preliminary Masterplan (‘Masterplan’), the South Dublin County Council Development Plan 2016-2022, Rebuilding Ireland, an Action Plan for Housing and Homelessness and planning legislation. The development site has an estimated capacity for 892 units (subject to planning permission), with the exact number to be explored during the dialogue …
View the procurement »
2017-04-20IDA Ireland Advanced Office Building Dundalk (IDA Ireland)
Advanced Office Building for IDA Ireland, designed to provide high quality office accommodation, which will accommodate future technological businesses.
General description of the proposal — the construction and completion of an Advanced Office Building, including reinforced Concrete (RC) foundations and ground floor slab, blockwork and RC rising walls, steelwork frame, cladding/external façade/finishes (TBC), RC and blockwork walls and partitions, Composite floors and stairs, glazing and doors, M+E …
View the procurement » Mentioned suppliers:Felix O'Hare & Co. Ltd
2017-04-07Scoil Phoil Naofa National School Extension and Refurbishment Building Works Project (Scoil Phoil Naofa National School)
Scoil Phoil Naofa National School Dooradoyle Limerick — The works comprise of the demolition of the existing single storey central classroom block and its replacement with a new build 2-storey block over part basement comprising of GP Hall and 8 general classrooms, approx gross internal floor area 2 311 m. The works also include the refurbishment of 2 existing 2-storey blocks, comprising of 16 existing classrooms, gross internal floor area 1 387 m. New access road off St Nessan's Road roundabout, new …
View the procurement »
2017-04-06Louth County Council — Municipal Waste Management & Disposal Services (Bulky Waste) (Louth County Council)
This public procurement competition proposes to engage in a competitive process for the establishment of framework agreements for the provision of Municipal Waste management and disposal (bulky waste) services for the Contracting Authority. Each contract will be awarded as a separate lot. Tenderers may bid for one or all Lots.
LOT 1: Municipal waste management and disposal services contract for Dundalk and Drogheda; and
LOT 2: Municipal waste management and disposal services contract for various source …
View the procurement »
2017-04-03Construction of a new Forensic Science Laboratory in Backweston Co. Kildare (Office of Public Works (OPW))
Construction of a new Forensic Science Laboratory, which is to be a mainly 2-storey building of approx. 9 550 sq m internal floor area, including laboratories, offices and ancillary accommodation, some on a third floor, with a single storey utilities and storage building of 485 sq m. The external finishes of this building will be coloured render, framed windows and metal roof cladding. To Include all associated Mechanical, Electrical and Lift works.
View the procurement » Mentioned suppliers:Duggan Brothers (Contractors) Ltd
2017-03-27Installation of Vertical Sorting Frames (An Post)
An Post are seeking installation services for Assembly of Flat Pack VSF Sorting Benches and other operational furniture used at An Post company offices as part of our manual sorting operations. The ideal company will provide a team (or teams) as required that will provide these services at various offices throughout the Republic of Ireland as each office comes online for its ‘operational re-design’. The contractor will need to operate to high safety and health standards, be able to assemble our furniture …
View the procurement » Mentioned suppliers:IO Systems Ltd
2017-03-23Carlow Watermains Rehabilitation Phases 2 and 3 (Irish Water)
Irish Water proposes to carry out rehabilitation works on sections of the water distribution network in County Carlow. Works will involve:(i) the rehabilitation of approximately 10km of watermains in Carlow Town, Tullow, Bagenalstown and Tinnahinch (ii)The replacement of back yard water mains and service connections with new service connections from either existing or new water mains located in public property, in Carlow Town, Bagenalstown and Tinnahinch. The replacement shall include both public …
View the procurement »
2017-03-23Millstreet WWTP Upgrade Contract (Irish Water)
The Contracting Entity intends to appoint a Contractor who will be responsible for the design, construction and operation, for some elements, of major Civil, MEICA and process works (incorporating associated works and services) at Millstreet WWTP and within the wider agglomeration. These works will be part of Irish Water's Capital Investment Plan.
Please refer to the PQQ documents for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-03-23Expressions of Interest for the development of lands at Deerpark/Glen North, Ennistymon, Co. Clare (Clare County Council)
Clare County Council (CCC) hereby seeks expressions of interest for development of lands at Deerpark/Glen North, Ennistymon, Co. Clare (the ‘Site’). This Request to Participate (RTP) is the first stage in a competitive dialogue procedure. This stage of the process will consist of an assessment of the suitability of applicants to participate in the process. Those applicants who are deemed suitable will then be invited to participate in the dialogue stage of the process. It is anticipated that the dialogue …
View the procurement »
2017-03-08Refurbishment and Upgrade Works at Dun Laoghaire Baths (Dun Laoghaire Rathdown County Council)
This scheme proposes works at the existing Dun Laoghaire Baths site to provide for the continuing public use of the area. The scheme proposes the retention and securing of the existing Baths Pavilion for use as artist workspaces, a gallery cafe and for the provision of public toilet facilities. It also proposes the removal of dilapidated structures to the rear of the Pavilion to permit the creation of a new walkway route and landscaping that will connect the existing walkway at Newtownsmith to both the …
View the procurement » Mentioned suppliers:SIAC Mantovani JV
2017-03-07Remediation of Former Steelworks Site Haulbowline Island, Cork Harbour, Ireland (Cork County Council)
The Haulbowline Former Irish Steelworks Factory Site is located in Cork Harbour Ireland and is approximately 11.3ha in size. On the North, South and East it is bordered by the Cork Harbour Waters and on the West it is bordered by lands under the control of the Irish Naval Services. The Haulbowline Island Former Irish Steelworks Factory Site Remediation is to be executed under a Design-Build Contract.
View the procurement »
2017-03-03Mechanical and Electrical Facilities Maintenance (Marine Institute)
The Marine Institute, a semi State body, wishes to invite tenders for the supply of Mechanical & Electrical Facilities Maintenance for Marine Institute, Rinville, Oranmore, Co. Galway for a period of 3 years with an option to extend for a further 2 years.
The Institute comprises buildings of 11 000 sq.m. on a 14 acre site. It is a two storey with mechanical plant rooms at level three. The complex can be divided into three main sections:
— Crescent Building accommodating administration offices, full staff …
View the procurement » Mentioned suppliers:LMC energy solutions
2017-03-02Timoole unauthorised landfill remediation works (Meath County Council)
The works involve the excavation of waste material at Timoole unauthorised landfill County Meath and the subsequent disposal of the waste at an appropriately authorised facility. The resultant void will be reinstated to be in keeping with the surrounding environment. The waste infill area covers <1 hectare.
View the procurement » Mentioned suppliers:Priority Construction Ltd
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd