2016-10-03Multi-Party Framework Agreement for the provision of Engineering Consultancy Services at Dublin Port (Dublin Port Company)
The scope of the framework agreement is for Engineering Consultancy Services at Dublin Port Estate and other lands including but not limited to the following:
— Civil;
— Marine;
— Structural;
— Mechanical;
— Electrical;
— Environmental;
— Planning;
— Traffic / Transport;
— Architectural Services;
— Archaeology;
— Landscape;
— Conservation;
— PSDP;
— Fire safety Consultant;
— Building Control Amendment Regulations — BCAR;
— Design Certifier;
— Assigned Certifier;
— Disabled Access Certificate — DAC;
— …
View the procurement »
2016-09-30Harley Street Pedestrian/Cycle Bridge, Cork City Centre (Cork City Council)
The proposed bridge will traverse the North Channel of the River Lee between the
existing Brian Boru Bridge and St. Patrick's Bridge in Cork City Centre. The
purpose of the proposed structure is to improve pedestrian and cycle connectivity
between St. Patrick's Quay and Merchant's Quay, thereby improving the links
between the City Centre, MacCurtain Street, Kent Railway Station and the
surrounding areas. The design must include crossing facilities to the north and
south of the proposed bridge and related …
View the procurement »
2016-07-08River Owenacurra and River Dungourney (Midleton) Flood Relief Scheme (Cork County Council)
Cork County Council, acting as agents for the OPW now plans to commission a project to develop a flood relief scheme (a ‘Scheme’) including structural works and a Fluvial Flood Forecasting System, if feasible. To develop the flood relief scheme, Cork County Council will commission a Contract, hereafter referred to as the ‘Project’, that shall comprise 5 stages, as set out below: — Stage I: Development of a number of flood defence options and the identification of a preferred Scheme, and the design of a …
View the procurement » Mentioned suppliers:Ove Arup & Partners Ireland
2016-07-07Consultancy Services (Cork City Council)
Structural and Civil Engineering, Building Services Engineering, Design/ Assigned
Certifier for Stages ii (b) to v, inclusive of DLP.
City Northwest Quarter Regeneration (CNWQR) Phase 2A — Housing
Development consisting of 47 no. units and associated Works at Harbour View
Road, Knocknaheeny, Cork.
View the procurement »
2016-06-20Design and Supply and install permanent tensile fabric and steel structure — Leopardstown Phase 3 Redevelopment (1) (Horse Racing Ireland (HRI))
Please Note:
For the avoidance of doubt, this specialist contractor will be novated to the main contractor for the Leopardstown Phase 3 redevelopment, please see: https://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=96109&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/PublicTenders
It will be the responsibility of the specialist contractor from this competition and the successful contractor from the main competition to put in place a suitable Sub-Contract between both parties.
Scope of Works:
The …
View the procurement »
2016-05-24TEN-T Priority Route Improvement Project Donegal (Donegal County Council)
Multi-disciplinary engineering and other specialises consultancy services for the delivery of Phases 1, 2, 3 and 4 of the current edition of the National Roads Authority (NRA) Project Management Guidelines and all associated services and deliverables as set out in the Requirements and Particulars of the Tender and Schedule for the TEN-T Priority Route Improvement Project Donegal.
View the procurement » Mentioned suppliers:RPS Halcrow Barry
2016-04-29Extension of St Luke‘s Radiation Oncology Centre at Beaumont Hospital (Health Service Executive (HSE))
A horizontal expansion, of approximately 4 500 sqm [Net Floor Area] over three
[3Nr.] floors to the existing facility;
To provide for departmental adjacencies required, including bunkers for six
[6Nr.] Linear Accelerators and support accommodation;
Provision of on-grade car-parking. The design shall allow for structural
capability of a five [5Nr.] storey structure, to allow for future expansion.
View the procurement »
2016-04-20Architect Led Design team services for Portlaoise Town Library (Laois County Council)
The proposed new library is to be located on Unit 52 and 53, Main Street, Portlaoise, previously owned by Shaws Department Store and acquired by Laois County Council for the purpose of a new central library and local studies centre.
The site on Main Street is ideally located in the town centre and is on a Highly visibly and located near the historical core of the town. The new library space will be 1 500 sq. metre approx. with a ground floor space of 800 sq. metres and a possible first floor space of 700 …
View the procurement » Mentioned suppliers:McCarthy O Hora and Associates
2016-04-12Single-Party Framework Agreement for Design Team Services for Dublin Port (Dublin Port Company)
The purpose of this particular competition is the establishment of a single-party
framework agreement for Architect led integrated design team services. The
framework agreement will be established with a single economic operator
comprising the following disciplines:
a) Architect.
b) Conservation Architect.
c) Landscaping Architect.
d) Structural / Civil Engineer.
e) Mechanical & Electrical Engineer.
f) PSDP
g) BCAR
h) Fire Consultant.
Only those Applicants capable of delivering all of the services listed …
View the procurement »
2016-03-01Appointment for services of Acquisition Manager for School Sites (Department of Education and Skills)
Expressions of interest are invited from suitably experienced firms who wish to be
considered for inclusion for consideration for a one-off contract to assist the
Planning and Building Unit of the Department of Education and Skills (DES) with
its Site Acquisition Programme.
The Department of Education and Skills is currently engaged in delivering a 6
year school building programme. Many of the schools included in this plan will
require new sites. In addition new sites will be required for other new …
View the procurement »
2016-02-04Single Party Framework Agreement for Post Design Engineering Services (Civil/Structural/M&E) in connection with the... (Dublin Port Company)
The purpose of this particular competition is the establishment of a Single Party
Framework Agreement for Post Design Engineering Services for a period of 5
years (with an option to extend for a further 2 years) which will assist in the
delivery of the Alexandra Basin Project.
Applicants should note that a procurement process for Preliminary and Detailed
Design for the ABR project was previously carried out. This current competition is
therefore for services which were not included in that procurement …
View the procurement »
2016-01-18MIC Single Point Design Team: Small Projects Framework (Mary Immaculate College)
Mary Immaculate College, Limerick, has on-going requirements for Design
Services for small projects and for studies / evaluations / reviews, as it seeks to
improve, adapt, and extend its Higher Education campus facilities, at it's main
campus in Limerick city, and at a new campus (from July 2016) at Thurles, Co.
Tipperary.
MIC wishes to make a single operator framework appointment of an Architect-led
single point design team (SPDT), with all design disciplines and ancillary services
engaged onder the …
View the procurement »
2015-12-21Establishment of Multiple Operator Single Discipline Frameworks — Construction Consultancy Services (Focus Housing Association)
This procurement is a competition to establish a Multi Operator Single Discipline Framework Design Team compromising the following Principal Services procured as independent appointments:
— Lot 1: Architect;
— Lot 2: Project manager;
— Lot 3: Civil/structural engineer;
— Lot 4: Mechanical and electrical engineer;
— Lot 5: Quantity surveyor;
— Lot 6: Archaeologist;
— Lot 7: Project supervisor design process;
— Lot 8: Fire safety/disability access consultant.
The establishment of the Framework Agreement …
View the procurement »
2015-12-18Provision of Rapid Delivery Housing Units in Dublin City Council Administrative Area for completion on site by 30.6.2016 (Dublin City Council)
Dublin City Council invites Expressions of Interest for the provision of rapid delivery housing units in 4 no project Lots, within Dublin City Councils administrative area.
The 2 storey dwellings will provide a housing mix of 1 bedroom-2 person units,
2 bedroom -4 person units and 3 bedroom-5 person units and will include:
— Design, Manufacture, Supply and Delivery of units to site;
— Associated site works including but not restricted to site preparation, foundations and ground floor slabs, site services …
View the procurement »
2015-10-21Louth County Council Single Party Framework for Integrated Design Team Services for the restoration of damaged long... (Louth County Council)
The purpose of this particular competition is the establishment of a single-party framework agreement for integrated design team services for the restoration of damaged long term vacant Local Authority housing units for Louth County Council. The framework agreement will be established with a single economic operator comprising the following disciplines: (a) Architect, (b) Quantity Surveyor (c) Building Surveyor‘ and (d) Structural Engineer. The single economic operator is to be Architect led and the …
View the procurement »
2015-10-16Establishment of a multi-party framework agreement for integrated design team services with the back-up of a... (Galway County Council)
The Contracting Authority is seeking to establish a multi-party framework agreement for integrated design team services for the re-mediation of 2 landfill sites, namely Pollboy Landfill, Ballinasloe and the East Galway Landfill, with the backup of a multi-disciplinary environmental consultancy team for the licence reporting and monitoring of the landfill sites. The framework agreement will be established comprising the following disciplines:
(a) Civil and Structural Engineering Services,
(b) Mechanical …
View the procurement » Mentioned suppliers:Fehily Timoney and Company
2015-10-16Single Point Project Team for Campus MV Upgrade (The University of Dublin Trinity College)
SPPT Services for a major medium volage infrastructural project to upgrade the main electrical connection point of the University and upgrading the internal Medium Voltage cables and Medium Voltage substations that distributes the electrical power within the main city centre campus. The SPPT will have overall responsibility and accountability for the planning, co-ordination, design, procurement, and implementation of the project.
View the procurement » Mentioned suppliers:Aecom
2015-10-12Appointment of Architect and Design Team Commercial Office Property Development Project (Shannon Commercial Properties)
The initial infrastructure in SFZ West was installed and the 1 buildings were erected on Shannon Free Zone in 1958/1959. The area has undergone continuous development since then with the result that facilities now range in quality from the most modern office complexes, advanced manufacturing, offices and warehouses to basic 1960's style north light factory buildings. Demand for the vacant north light style buildings has weakened and appropriate regeneration is now required.
View the procurement »
2015-09-24Establishment of a Multi-Operator Framework Agreement for Design Team Services (4 Lots) (Wexford County Council)
The contracting Authority is seeking to establish a multi-operator framework agreement for the provision of design team services in 4 lots, being architectural services, civil and structural engineering services, mechanical and electrical engineering services and quantity surveying. The projects will be varied in nature, including new build and refurbishment projects of housing, civic, community and recreational nature and feasability studies. The framework agreement will be established with 5 operators …
View the procurement »
2015-07-31Limerick City Footbridge — Consultants — (Lot 1 — Project Manager/Employers Representative and Quantity Surveyor and... (Limerick City and County Council)
Limerick City and County Council (The Authority) wish to appoint a design team to complete the Limerick Footbridge project. Applicants should note that the proposed development will form an iconic landmark on the Limerick City landscape and all members of the design team should have relevant bridge experience and expertise for a project of this nature.
The following design team services are required:
1. Lot 1: Project Manager/Employers Representative and Quantity Surveyor,
2. Lot 2: Single Point Design …
View the procurement »
2015-07-24Framework Agreement for River Bridge and Channel Surveys for CCE Structures (Iarnrod Eireann-Irish Rail)
Iarnród Éireann has over 350 bridges (structures greater than 2 m) over water. All these bridges and riverbeds require periodic inspections. Some inspections are carried out yearly, other are every 3 years and more are on a 6 yearly cycle.
Iarnród Éireann is looking to appoint specialist expertise to undertake inspection of railway bridges as well as carry out bridge and river surveys.
The consultant is to provide expertise in the following areas:
1. Provide divers/surveyors for a bridge and riverbed …
View the procurement »
2015-07-24Framework Agreement for the Provision of Architect Lead Design Team Services (Kildare County Council)
Kildare County Council proposes to establish and operate multi-party Framework Agreements for Architect Lead Design Team Services primarily to provide consultancy services in connection with the provision of or alteration to the Contracting Authorities new social housing stock. The range of projects which will fall under the scope of the Framework Agreement will include but is not limited to:
— New multi-unit social housing schemes on green or brown field sites
— Small infill housing schemes
— Major …
View the procurement » Mentioned suppliers:Deaton Lysaght Architects
2015-06-25Multiparty Framework Agreement for Architect Led Third Level Integrated Design Team Services for Educational... (Grangegorman Development Agency)
As part of the Project Vision for the development of
Grangegorman, Section 3.1.3 of the Grangegorman
Planning Scheme 2012 (adopted by Dublin City
Council) provides for an Academic Hub-Library
Complex/DCC Branch Library; Business Complex
and other Third Level Educational and ancillary
facilities on the site. It is intended that the initial
contract Academic Hub — Library Complex forms part
of this Multi-party Framework Agreement. Subsequent call-off contracts for the other Third Level Educational …
View the procurement »
2015-06-18Multi-Operator Framework Agreement for the provision of Road Design Consultancy Services (Kildare County Council)
Kildare County Council as Contracting Authority wishes to establish and operate a multi-supplier Framework Agreement for the Provision Road Design Consultancy Services, including the provision of Project Supervisor Design Process (PSDP) services.
The Framework Agreement shall cover all aspects of Road Design including:
— New alignments/ re-alignments;
— Footpaths and cycle routes;
— Roundabout design;
— Junction design;
— Drainage design;
— Public lighting;
— Preliminary design;
— Public consultation …
View the procurement »
2015-05-26Appointment of Design Consultant Industrial Building Upgrade and Refurbishment Project (Shannon Commercial Properties)
The proposed project will include the upgrade and refurbishment of industrial buildings at Bay 37 Shannon Free Zone.
The key aim of the project is to proceed immediately with the planning, design and upgrade of a large industrial building with all associated site development and building modification works.
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant to deliver and manage all …
View the procurement »
2015-05-01Framework Agreement for M& E Design Consultancy Services (Iarnrod Eireann-Irish Rail)
The consultancy services will typically include but are not limited to the following:
1. New train stations — mechanical, electrical and telecom installations;
2. Refurbishment and upgrading of existing train stations and buildings;
3. Train Depots and services for train maintenance such as fuelling, water, vacuum discharge systems, fume extraction systems, train wash systems, electrical services etc.;
4. Office accommodation and facilities for staff;
5. M&E design services for various bus stations and …
View the procurement »
2015-04-29Consultancy Services to Carry Out Special Inspections of Talbot Memorial Bridge and Butt Bridge, Dublin (Including... (Dublin City Council)
The Contracting Authority is seeking to appoint a consultant to carry out Special Inspections (Including PSDS & PSCS Roles) of Talbot Memorial Bridge and Butt Bridge on the River Liffey in Dublin which entails detailed visual inspections, structural condition testing, duct and tendon exposures on post tensioning tendons, mathematical modelling to determine repairs and rehabilitation for various service life options and recommending repair and rehabilitation option based on minimum whole life cost principles.
View the procurement » Mentioned suppliers:AECOM Ltd