2019-09-23Development of 42 Residential Units (Co-operative Housing Ireland)
Development of 42 Residential Units consisting of:
A. 8 No 3 bed houses in a terrace;
B. 16 No Duplex units over 18 No ground floor apartments.
Between Loughlinstown Wood and Cois Cualain roads, Loughlinstown, Co. Dublin.
The tender process will be through competitive dialogue.
We are seeking developer/contractors who can deliver completed units for some/all of the units providing their own construction finance for the duration of the works.
View the procurement »
2019-09-16Maynooth University Student Centre (Maynooth University)
Maynooth University wishes to construct a new 3 700 m student centre which will act as a hub for Maynooth Student Union (MSU), clubs, societies, events and the variety of activities that create that special sense of belonging at Maynooth University. The distinctive architecture and facilities will deliver a unique destination on campus that offers a welcoming and inclusive environment for our students. Construction will commence in early 2020 and the anticipated completion date is August 2021.
View the procurement »
2019-09-06Samuel Beckett Civic Campus Phase 2: Pool Tiling (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. The change of use of the Phase 1 sports and community building to a library and community building;
B. Refurbishment of the existing sports building to create a new library;
C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s …
View the procurement »
2019-09-06Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. the change of use of the Phase 1 sports and community building to a library and community building;
B. refurbishment of the existing sports building to create a new library;
C. the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-06-21Facade Installation Reserved Specialist for Leeson Lane Office Building (Office of Public Works (OPW))
Facade installation reserved specialist:
The development will consist of:
1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445sqm in area;
2) The construction of a new 7 storey (over basement) office building of c. 6 333 m;
3) Site development works include hard landscaping, boundary treatment and all other ancillary site works.
The façade works cover approximately 3 250 m. The building facade primarily consists of the following materials and systems:
— …
View the procurement »
2019-05-17Anti Corrosion Rail Coating System (Iarnrod Eireann-Irish Rail)
IE require a proven rail corrosion protection system (and associated touch up kits, etc.) for rails in tunnels, level crossings and coastal areas.
The proposed system must:
1) Offer an effective corrosion protection barrier, approved for use on an EU highspeed mainline railway undertaking;
2) Offer stray current protection — suitable for use in DC traction current areas;
3) Be damage resistant and offer sacrificial protection where damage occurs;
4) Be suitable for application on rails of any section or …
View the procurement »
2019-04-03Replacement of Studio Floors (Raidio Teilifis Eireann (RTE))
RTÉ invites tenders for the replacement of studio floors in 2 separate lots. Lot 1 is the studio 5 floor totalling 223 m and Lot 2 is the studio 4 floor totalling 626 m. The floors will be high-quality TV floors with a surface hardness, levelness and flatness suitable for modern TV studio requirements including ‘in shot’ camera tracking. Currently the Studio 5 works are programmed for August 2019 with the studio available for 3 weeks. Studio 4 works are planned for 2020 subject to internal RTÉ approval.
View the procurement » Mentioned suppliers:MVOHalloran Ltd
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2019-02-21Clonturk Temporary Accommodation (City of Dublin Education and Training Board)
City of Dublin ETB invites tenders for the construction of 2 storey temporary modular school building and single storey modular changing rooms at Clonturk Community College, Dublin 9.
Tenders for 1 or more of the following 3 options only may be submitted at the discretion of tenderers under this open procedure:
Option 1: 3 year rental and subsequent removal from site (on basis of 36 monthly payments);
Option 2: 3 year rental and subsequent outright purchase by CDETB (on basis of 36 monthly payments and …
View the procurement »
2019-01-23Framework for Office Fit Out and Associated Works (Raidio Teilifis Eireann (RTE))
RTE anticipate a requirement for office fit out contractors for furniture supply, painter/decorating, small scale carpentry and fitter and associated works. There exist parallel frameworks for electrical and small builders’ works. The main project work will be works carried out on the RTE Campus in Donnybrook, Dublin 4.
View the procurement »
2019-01-15Oweninny Visitor Centre (Bord Na Mona)
Summary of services for fit out pre-qualification request for tender for the manufacture, provision and installation of visitor centre fit out including welcome reception, cloaks, café including kitchen servery and permanent exhibition works at Oweninny Visitor Centre comprising joinery, metalwork, kitchen equipment, specialist paint and decorative finishes, audio visual hardware and graphics.
Insurances:
The successful tenderer shall be required to hold for the term of the services contract the …
View the procurement »
2018-11-30Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.
The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in …
View the procurement »
2018-11-13Framework Agreement for the Painting of Steel Bridges and Other Structures (Iarnrod Eireann-Irish Rail)
This is a call to competition by Iarnród Éireann (IE) for the establishment of a multi-company Framework Agreement for the painting of steel bridges and other structures as required on an ad-hoc basis.
Iarnród Éireann has a continuous requirement for re painting of railway bridges on the rail network.
Iarnród Éireann intends to pre-qualify a number of suitably qualified companies to participate in the tender process for the provision of bridge painting services.
Under the proposed Framework Agreement all …
View the procurement » Mentioned suppliers:Highway Barrier Solutions Ltd
2018-11-13Framework Agreement for the Painting of Steel Bridges and other Structures (Iarnrod Eireann-Irish Rail)
This is a call to competition by Iarnród Éireann (IE) for the establishment of a multi-company Framework Agreement for the painting of steel bridges and other structures as required on an ad-hoc basis.
Iarnród Éireann has a continuous requirement for re painting of railway bridges on the rail network.
Iarnród Éireann intends to pre-qualify a number of suitably qualified companies to participate in the tender process for the provision of bridge painting services.
Under the proposed Framework Agreement all …
View the procurement »
2018-11-06Airport Services for Cork Airport (daa plc)
Tender for the procurement of airport services for Cork Airport for example cleaning, hold baggage screening, passenger with reduced mobility and other ancillary services.
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Electrical subcontractors (reserved specialist to the main appointed contractor) for electrical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Mechanical subcontractors (reserved specialist to the main appointed contractor) for mechanical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement » Mentioned suppliers:Murphy & Kelly (Thomastown) Ltd.
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the local authority’s record of protected structures, the provision of a new 1 231,5 m single storey post primary school extension, the provision of a new 3 312,3 m 2-storey …
View the procurement » Mentioned suppliers:Tom O'Brien Construction Ltd
2018-10-03Maynooth University Refurbishment of Existing Arts Building (Maynooth University)
The Works Contractor contract defined as the Refurbishment of the existing Arts Building of 4 700 m accommodation which may be delivered over 2 phases. Phase 1 is circa 1 390 m which provides for reconfiguration of existing offices into modern teaching spaces and courtyard. Phase 2 is circa 3 310 m which provides reconfiguration of existing toilets, office space into modern teaching spaces. Works also include provision of new courtyard and works to existing mechanical and electrical systems.
View the procurement »
2018-09-21Maynooth University Academic Building New Construction (Maynooth University)
The Works Contractor contract defined as the Academic Building New Construction comprises the new construction of 10,554 m accommodation which may be delivered across a single or 2 phases. Phase 1 is circa 5,287 m which provides for teaching spaces predominantly on ground and first floors with offices, reading and support spaces on second and third floors. Enclosed plant space is located at fourth floor. The main objective of the competition is the Phase 1, with the option to proceed with Phase 2, …
View the procurement » Mentioned suppliers:JJ Rhatigan and Company
2018-08-22LIT Single Operator Framework for Coonagh Internal Fit-Out (Limerick Institute of Technology)
Single Operator Framework for selected works at its new campus located at Coonagh Cross Shopping Centre. The Framework works may include, but are not limited to:
— General Building Works,
— Extensions, Demolitions and Alterations to and of Existing Structures,
— Construction of New Buildings,
— Repair and Refurbishment of Existing Buildings,
— Mechanical and Electrical works through reserved specialist subcontractors,
— Minor Civil Engineering Works,
— Miscellaneous Maintenance Projects.
The works …
View the procurement »
2018-08-11Phase II Works (The Ballinglen Arts Foundation)
Supply and fit of floor finishes (polished concrete), supply and fit passenger lift, Supply and fit of air-to-water heading system, together with other finishes including second fix joinery, painting and decorating and external landscaping works.
View the procurement »
2018-07-25Provision of Rolling Stock Fleet Painting Services (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) are seeking expressions of interest from companies with a proven track record in delivering on-site vehicle painting services to participate in a tender process for the provision of painting services to IÉ for a period of 4 years.
The required services will cover the supply, installation and commissioning of either an internal or external temporary painting facility which will operate in tandem with the existing fixed installation in Inchicore Railway Works. The services will also …
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »
2018-06-29Construction of Clare County Library (Clare County Council)
The overall project will comprise construction of a new County Library on a brownfield site. The proposed project when completed will be attached to the existing Glór Theatre and consequently there will be significant works required at the interface of the two buildings including some demolition work. Applicants should note that the works will be carried out in a live environment and safe access to and full use of the Glór Theatre will be required for the duration of the works. The new building measuring …
View the procurement » Mentioned suppliers:L&M Keating Ltd