2016-07-01   Galway Racecourse Tote Building Single Point Project Team (Galway Race Committee)
Galway Race Committee wish to appoint a Single Point Project Team to provide a full range of construction project related services for the design and delivery of a new Tote Building at Galway Racecourse. View the procurement »
Mentioned suppliers: AECOM Ireland Ltd
2016-06-29   RFT for appointment to a single party framework for the provision of Quantity Surveying advisory services in respect... (National Treasury Management Agency (NTMA))
Request for Tenders (RFT) for appointment to a single party framework for the provision of Quantity Surveying advisory services in respect of the Social Housing PPP Programme to be procured and delivered by the National Development Finance Agency (NDFA). Please see the RFT attached to this notice for further information. View the procurement »
Mentioned suppliers: Cyril Sweett Limited (t/a Sweett (Ireland))
2016-05-26   Single point architectural led multi-disciplinary design team for Civic Plaza at College Green, Dublin 2 (Dublin City Council)
Single point architectural led multi-disciplinary design team for Civic Plaza at College Green, Dublin 2. The contracting authority is seeking to establish a single point multi-disciplinary design team led by an architect. The contract will be for Design team services for stages (i) to (v) of the Capital Works Management Framework. Specialist skills required by the Design Team Lead include Employer's Representative for works contract. Conservation Architect Grade 1 (RIAI accreditation), Urban Design and … View the procurement »
Mentioned suppliers: Paul Keogh Architects
2016-05-03   Westmeath County Council — Housing capital works quantity surveying consultancy services (Westmeath County Council)
Westmeath County Council intends to appoint a Quantity Surveyor for 3 proposed social housing projects at Athlone, Mullingar and Kinnegad, Co. Westmeath. Estimated construction costs exclusive of VAT are: St Laurences Terrace, Mullingar 9 units 1 450 000 EUR; Arcadia Athlone 30 units 4 750 000 EUR; Bun Daire Kinnegad 32 units 4 820 000 EUR. The house types will be in the main be single storey or 2-storey, 2 or 3-bedroom semi-detached or terraced houses designed in accordance with Building Regulations and … View the procurement »
2016-04-29   Extension of St Luke‘s Radiation Oncology Centre at Beaumont Hospital (Health Service Executive (HSE))
A horizontal expansion, of approximately 4 500 sqm [Net Floor Area] over three [3Nr.] floors to the existing facility; To provide for departmental adjacencies required, including bunkers for six [6Nr.] Linear Accelerators and support accommodation; Provision of on-grade car-parking. The design shall allow for structural capability of a five [5Nr.] storey structure, to allow for future expansion. View the procurement »
2016-04-20   Establishment of a Multi-Supplier Framework of Construction Consultancy Teams for Development of Student... (University College Cork ( UCC ))
Establishment of a Multi-Supplier Framework of Construction Consultancy Teams for Development of Student Accommodation at Multiple Sites for UCC and Appointment of Construction Consultancy Team for the Development of New Student Accommodation facility at Victoria Cross, Cork. The Framework Agreement will be established on foot of competitive tenders received for the award of an initial services contract to design a new 200-250 bed student accommodation facility at Victoria Cross on a UCC Brownfield site. … View the procurement »
Mentioned suppliers: McCullough Mulvin Architects
2016-04-20   Establishment of a Multi-Supplier Framework of Construction Consultancy Teams for Small and Minor Capital Works projects (University College Cork ( UCC ))
Establishment of a Multi-Supplier Framework of Construction Consultancy Teams for Small and Minor Capital Works projects and Appointment of Construction Consultancy Team for the Development of New Staircase blocks at the UCC Civil Engineering and Geography Buildings. The Framework Agreement will be established on foot of competitive tenders received for the award of an initial services contract to design a new fire escape stairs block at the UCC Civil Engineering Building on College Road and the … View the procurement »
Mentioned suppliers: Atkins
2016-04-20   Architect Led Design team services for Portlaoise Town Library (Laois County Council)
The proposed new library is to be located on Unit 52 and 53, Main Street, Portlaoise, previously owned by Shaws Department Store and acquired by Laois County Council for the purpose of a new central library and local studies centre. The site on Main Street is ideally located in the town centre and is on a Highly visibly and located near the historical core of the town. The new library space will be 1 500 sq. metre approx. with a ground floor space of 800 sq. metres and a possible first floor space of 700 … View the procurement »
Mentioned suppliers: McCarthy O Hora and Associates
2016-03-24   Shannon Airport Authority Ltd requires the services of a Design Consultancy to assist with an Aircraft Hangar... (Shannon Airport Authority plc)
The key aim of this project is to proceed immediately with the design and construction of a large circa 6,720 (72,300 sq ft) Painting Hangar of which 500 sq m (5,380 sq ft) relates to offices, canteen and ancillary storage / work place, 400 sq m (4,300 sq ft) relates to plant and storage areas while the balance relates to the high bay hanger accommodation for various aircraft. The project is expected to consist of an insulated steel painting hangar with all associated site development and concrete apron … View the procurement »
Mentioned suppliers: Patrick J Tobin & Co Limited
2016-03-22   Quantity Surveying Services Historic Leinster House (Office of Public Works (OPW))
Historic Leinster House — Conservation Works (to include Electrical Rewiring, Mechanical, Structural works, Fire Upgrading and Fabric repairs to Historic Leinster House). View the procurement »
Mentioned suppliers: Mott MacDonald Ireland Ltd
2016-03-18   Provision of Quantity Surveyor Services for works on Athlone Garda Station (Office of Public Works ( OPW ))
Provision of Quantity Surveyor Services for works on Athlone Garda Station. View the procurement »
Mentioned suppliers: McCauls
2016-03-02   Provision of 131 no. Rapid Delivery Housing Units in Dublin City Council‘s Administrative Area (Dublin City Council)
Dublin City Council invites Expressions of Interest for the provision of 131 no. rapid delivery housing units in 4 no. Lots, within Dublin City Council‘s administrative area. The 2-storey dwellings will provide a housing mix of 2 bedroom -4 person units and 3 bedroom-5 person units and will include: — Design, Manufacture, Supply and Delivery of units to site; — Associated site works including but not restricted to site preparation, foundations and ground floor slabs, site services and connections to … View the procurement »
Mentioned suppliers: ABM Construction/ABM Design and Build Adston Ltd Carey Group PLC
2016-02-23   Establishment of a Multi-Party Framework Agreement for Integrated Design Team Services with the Initial Contract for... (Dublin City Council)
The multi-party framework agreement will be established with up to five (5) economic operators, subject to the receipt of a sufficient number of valid tenders and comprising the following disciplines: (a) Architectural Services (incl. design team lead, fire safety design services, disability access design services, employer's representative for the Works Contract, design certifier and assigned certifier services as defined under the Building Control (Amendment) Regulations 2014). (b) Civil and Structural … View the procurement »
Mentioned suppliers: AECOM Ireland Limited JNP Architects McCullough Mulvin Architects Ltd McGarry NíÉanaigh Architects WS Atkins Ireland Ltd
2016-01-29   Procurement of an integrated design team for the fit-out design of the National Treasury Management Agency's... (National Treasury Management Agency (NTMA))
The National Treasury Management Agency (NTMA) is a State body which operates with a commercial remit to provide asset and liability management services to Government. View the procurement »
Mentioned suppliers: AECOM Ireland Limited AECOM Limited Perkins + Will UK Limited
2016-01-18   MIC Single Point Design Team: Small Projects Framework (Mary Immaculate College)
Mary Immaculate College, Limerick, has on-going requirements for Design Services for small projects and for studies / evaluations / reviews, as it seeks to improve, adapt, and extend its Higher Education campus facilities, at it's main campus in Limerick city, and at a new campus (from July 2016) at Thurles, Co. Tipperary. MIC wishes to make a single operator framework appointment of an Architect-led single point design team (SPDT), with all design disciplines and ancillary services engaged onder the … View the procurement »
2015-12-21   Establishment of Multiple Operator Single Discipline Frameworks — Construction Consultancy Services (Focus Housing Association)
This procurement is a competition to establish a Multi Operator Single Discipline Framework Design Team compromising the following Principal Services procured as independent appointments: — Lot 1: Architect; — Lot 2: Project manager; — Lot 3: Civil/structural engineer; — Lot 4: Mechanical and electrical engineer; — Lot 5: Quantity surveyor; — Lot 6: Archaeologist; — Lot 7: Project supervisor design process; — Lot 8: Fire safety/disability access consultant. The establishment of the Framework Agreement … View the procurement »
2015-12-18   Provision of Rapid Delivery Housing Units in Dublin City Council Administrative Area for completion on site by 30.6.2016 (Dublin City Council)
Dublin City Council invites Expressions of Interest for the provision of rapid delivery housing units in 4 no project Lots, within Dublin City Councils administrative area. The 2 storey dwellings will provide a housing mix of 1 bedroom-2 person units, 2 bedroom -4 person units and 3 bedroom-5 person units and will include: — Design, Manufacture, Supply and Delivery of units to site; — Associated site works including but not restricted to site preparation, foundations and ground floor slabs, site services … View the procurement »
2015-12-10   Trinity Visitor Experience Project — Project Management and Quantity Surveying Services (The University of Dublin Trinity College)
— Trinity Visitor Experience Improvements Project — Project Management and Quantity; — Surveying Services including cost control. View the procurement »
Mentioned suppliers: Wh Stephens
2015-11-11   Establishment of Multiple Operator Framework Agreements for Design Consultancy Services (University of Limerick)
The University of Limerick now wish to establish Multiple Operator Framework Agreements for Small Capital Works Projects. Separate Framework Agreements will be established for the following Design Consultancy services: — Architect; — Project Manager; — Civil / Structural Engineer; — Mechanical and Electrical Engineer; — Quantity Surveyor; — Landscape Architect; — Project Supervisor Design Process; — Fire Safety Consultant. View the procurement »
Mentioned suppliers: Aecom Aegis Safety Management Arup ASM Group BDP Brady Shipman Martin Bruce Shaw Carr Cotter Naessens & Co Ltd Cronin Sutton Consulting Delap & Waller Consulting Engineers DJF Engineering Services Ltd Don O'Malley & Partners Doyle O'Troithigh Landscape Architecture Edward Cotter Partnership eml Architects Garland Safety Management Homan O'Brien Hugh Kelly Architects J V Tierney & Co. JWHA Consulting Kelly Barry O'Brien Whelan Architects Kerin Contract Management Malachy Walsh & Partners Matt O'Mahony & Associates Ltd McCullough Mulvin Architects Molloy QS & John Cuddy & Partners Nicholas O'Dwyer Ltd O'Connor Sutton Cronin Consulting Engineers O'Reilly Hyland Tierney & Associates ORS Peter F Costello & Partners Punch Consulting Engineers Quin Architects Reddy Architecture Reddy Architecture + Urbanism Rogerson Reddan & Associates Tim Murphy Chartered Surveyors Tobin Consulting Engineers Tom McNamara & Partners
2015-10-27   Integrated Design Services for Academic, Support and Associated Facilities (University College Dublin (UCD))
University College Dublin is seeking to establish a multi party framework agreement for the provision of Integrated Design Services for Academic, Support and Associated Facilities. Please see Questionnaire attached by logging on to www.etenders.gov.ie View the procurement »
Mentioned suppliers: Coady Partnership Heneghan Peng Architects MCA Architects Moloney O'Beirne Architects Reddy Architecture Rkd Architects
2015-10-21   Louth County Council Single Party Framework for Integrated Design Team Services for the restoration of damaged long... (Louth County Council)
The purpose of this particular competition is the establishment of a single-party framework agreement for integrated design team services for the restoration of damaged long term vacant Local Authority housing units for Louth County Council. The framework agreement will be established with a single economic operator comprising the following disciplines: (a) Architect, (b) Quantity Surveyor (c) Building Surveyor‘ and (d) Structural Engineer. The single economic operator is to be Architect led and the … View the procurement »
2015-10-20   Pilot Project for the Rapid Delivery of Housing Units in Dublin City Council Administrative Area for completion and... (Dublin City Council)
Dublin City Council invites Expressions of Interest for the erection /installation of 22 no. 3 bed — 5 person 2-storey, rapid delivery housing units to include: Design, Manufacture, Supply and Delivery of units to site; Site works including but not restricted to site preparation, foundations and ground slabs, site services and connections to utility services, boundary treatments, hard and soft landscaping; Erection /installation of the rapid delivery housing units on site; Associated finishings and … View the procurement »
Mentioned suppliers: Western Building Systems Ltd
2015-10-16   Single Point Project Team for Campus MV Upgrade (The University of Dublin Trinity College)
SPPT Services for a major medium volage infrastructural project to upgrade the main electrical connection point of the University and upgrading the internal Medium Voltage cables and Medium Voltage substations that distributes the electrical power within the main city centre campus. The SPPT will have overall responsibility and accountability for the planning, co-ordination, design, procurement, and implementation of the project. View the procurement »
Mentioned suppliers: Aecom
2015-10-12   Appointment of Architect and Design Team Commercial Office Property Development Project (Shannon Commercial Properties)
The initial infrastructure in SFZ West was installed and the 1 buildings were erected on Shannon Free Zone in 1958/1959. The area has undergone continuous development since then with the result that facilities now range in quality from the most modern office complexes, advanced manufacturing, offices and warehouses to basic 1960's style north light factory buildings. Demand for the vacant north light style buildings has weakened and appropriate regeneration is now required. View the procurement »
2015-10-02   Establishment of a Single-Party Framework Agreement for an Architect led Integrated Design Team Service (Galway Mayo Institute of Technology)
The establishment of a single-party framework for an integrated Architect led Design Team Service. The initial contract at our GMIT Mayo Campus, Castlebar, Co Mayo is for roof remedial works, including investigation and survey of existing roof structure, removal of asbestos containing slates, roof replacement, downpipe and gutter replacement to buildings at GMIT Mayo Campus, Westport Road, Castlebar, Co Mayo. It is intended that the initial contract forms part of this Framework Agreement. Subsequent … View the procurement »
Mentioned suppliers: Taylor Architects Limited T/A Taylor Architects
2015-09-24   Establishment of a Multi-Operator Framework Agreement for Design Team Services (4 Lots) (Wexford County Council)
The contracting Authority is seeking to establish a multi-operator framework agreement for the provision of design team services in 4 lots, being architectural services, civil and structural engineering services, mechanical and electrical engineering services and quantity surveying. The projects will be varied in nature, including new build and refurbishment projects of housing, civic, community and recreational nature and feasability studies. The framework agreement will be established with 5 operators … View the procurement »
2015-07-31   Limerick City Footbridge — Consultants — (Lot 1 — Project Manager/Employers Representative and Quantity Surveyor and... (Limerick City and County Council)
Limerick City and County Council (The Authority) wish to appoint a design team to complete the Limerick Footbridge project. Applicants should note that the proposed development will form an iconic landmark on the Limerick City landscape and all members of the design team should have relevant bridge experience and expertise for a project of this nature. The following design team services are required: 1. Lot 1: Project Manager/Employers Representative and Quantity Surveyor, 2. Lot 2: Single Point Design … View the procurement »
2015-07-24   Framework Agreement for the Provision of Architect Lead Design Team Services (Kildare County Council)
Kildare County Council proposes to establish and operate multi-party Framework Agreements for Architect Lead Design Team Services primarily to provide consultancy services in connection with the provision of or alteration to the Contracting Authorities new social housing stock. The range of projects which will fall under the scope of the Framework Agreement will include but is not limited to: — New multi-unit social housing schemes on green or brown field sites — Small infill housing schemes — Major … View the procurement »
Mentioned suppliers: Deaton Lysaght Architects
2015-07-23   Circle VHA Multi-Operator Frameworks for Construction Design Team Services (Circle Voluntary Housing Association)
Circle Voluntary Housing Association (Circle VHA) intends to set up Multi- Operator Frameworks in 5 No. Lots for the provision of Consultant Construction Design Team Services and Building Advisory Services, across New Build Housing Projects, Refurbishment, and Other Projects of a General Nature. Lot 1: Architectural Services; Lot 2: Civil and Structural Engineering; Lot 3: Mechanical and Electrical Services; Lot 4: Quantity Surveying; Lot 5: Project Management / Employers Representative. A maximum of 10, … View the procurement »
Mentioned suppliers: Aecom Austin Reddy & Co C J Falconer & Associates Architects Carr Cotter Naessens Architects and Denis... CS Consulting Group Delap and Waller Downes Associates Consulting Engineers Duffy Chartered Engineers Fearon O'Neill Rooney Consulting Engineers Gardiner and Theobald Garland Consulting Engineers Hamilton Young Architects Hanly Pepper Consulting Engineers Hayes Higgins Partnership HOH Partnership Homan O'Brien Kane Crowe Kavanagh Kenny Lyons Associates & OBFA Martin Peters Associates Consulting Engineers McCauls McCullagh Lupton Quinn Mcgahon Surveyors McMahon Associates Paul Keogh Architects Rogerson Reddan & Assoc Ltd Scollard Doyle Construction Consultants Sean Harrington Tom McNamara & Partners Van Dijk Architects
2015-07-17   Valuer required to value Fibre Optic Metropolitan Area Network for Valuation Tribunal Appeal (Department of Communications, Energy and Natural Resources)
1.1 Between 2002 and 2009, the State constructed 88 Metropolitan Area Networks (MANs) in towns and cities around the country. These optical fibre networks were built in order to make telecommunications services available to licensed telecommunications operators on an ‘open access’ basis. The MANs are owned by the Minister for Communications, Energy & Natural Resources (the beneficial owner) and the Local Authority in which each MAN is located (the legal owner). The MANs are managed, maintained and … View the procurement »
2015-07-13   Child and Family Centre, Southside Education Campus, Roxboro, Limerick (The Child and Family Centre)
The Diocese of Limerick wish to appoint a design team for a Child and Family Centre. the following design team services are required; Lot 1: Architect including PSDP and Fire Safety Design; Lot 2: Civil / Structural Engineer; Lot 3: Mechanical & Electrical Engineer; Lot 4: Quantity Surveyor; Lot 5: Project Manager. Further information regarding this competition and the Design Team Services required can be found in the Project Information Memorandum (also available to download from www.etenders.gov.ie or … View the procurement »
2015-07-10   Integrated Design Team Services for; Clonmacken, Limerick City. Deerpark, Adare. Lisheen Park / Laurel Park,... (Limerick City and County Council)
Limerick City and County Council wish to appoint an integrated design team for the four (4) housing projects. The following design team services are required; — Architect including PSDP and Fire Safety Design, — Project Manager, — Civil / Structural Engineer, — Mechanical and Electrical Engineer, — Quantity Surveyor. Further information regarding this competition and the Design Team Services required can be found in the Project Information Memorandum (also available to download from www.etenders.gov.ie … View the procurement »
2015-07-03   Appointment of design consultant industrial / commercial property development project (Shannon Commercial Properties)
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant (Architect) to deliver and manage all consultancy services required to carry out a full detailed design which will then form the basis for the tender for construction. Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant … View the procurement »
2015-07-02   Full, integrated Design Team Services (Architect-led) — for the Design and Construction of 15-24 no. social housing... (Kilkenny County Council)
The Design and Construction of 15-24 no. social housing units at Donaguile, Castlecomer, Co. Kilkenny. View the procurement »
Mentioned suppliers: McGarry Ni Eanaigh Architects Limited
2015-07-02   Full, integrated Design Team Services (Architect-led) for the Design and Construction of 15-25 no. mixed housing... (Kilkenny County Council)
Architect Led Design Team — The Design and Construction of 15-25 no. mixed housing units at Cantwell‘s Yard,The Butts, Kilkenny, County Kilkenny — Restricted Procedure. View the procurement »
Mentioned suppliers: Reddy Associates Architects Limited t/a...
2015-07-02   Full, integrated Design Team Services (Architect-led) — for the Design and Construction of 20-30 no. social housing... (Kilkenny County Council)
Architect Led Design Team — The Design and Construction of 20-30 no. social housing units at Bolton, Callan, Co. Kilkenny. View the procurement »
Mentioned suppliers: Reddy Associates Architects Limited t/a...
2015-06-30   Stage 1 — SAQ — Appointment of Architect Led Design Team — Housing Project at former Diageo site, Kilkenny (Kilkenny County Council)
Stage 1 — SAQ — The Design and Construction of 60-70 no. mixed housing units at former Diageo site, Kilkenny, County Kilkenny (note: this may be in two phases). View the procurement »
Mentioned suppliers: Van Dijk Architects Limited
2015-06-25   Multiparty Framework Agreement for Architect Led Third Level Integrated Design Team Services for Educational... (Grangegorman Development Agency)
As part of the Project Vision for the development of Grangegorman, Section 3.1.3 of the Grangegorman Planning Scheme 2012 (adopted by Dublin City Council) provides for an Academic Hub-Library Complex/DCC Branch Library; Business Complex and other Third Level Educational and ancillary facilities on the site. It is intended that the initial contract Academic Hub — Library Complex forms part of this Multi-party Framework Agreement. Subsequent call-off contracts for the other Third Level Educational … View the procurement »
2015-06-16   Integrated Design Team for Moss Street Development, Dublin 2 (National Association Of Building Co-Operatives (NABCO))
NABCO wish to appoint an integrated design team for the Moss Street Development, Dublin 2. The following design team services are required: — Architect including PSDP, Fire Safety Design and Conservation; — Civil / Structural Engineer; — Mechanical and Electrical Engineer; — Quantity Surveyor. View the procurement »
2015-06-12   Client Representative Project Opera, Limerick City and County Council (Limerick City and County Council)
The Client Representative will comprise a single integrated project management led multi-disciplinary team and will provide technical advice and services to the Contracting Authority on Project Opera (the ‘Project’). These multi-disciplinary professional consultancy services include but are not limited to the following principle services and support services; Principle Services: (a) project management; (b) quantity surveying ; Support Services: (a) planning / urban design / conservation; (b) … View the procurement »
2015-06-04   Quantity surveying services (Royal Irish Academy of Music)
Quantity surveying services. View the procurement »
Mentioned suppliers: WH Stephens Partnership
2015-05-29   Multiple Operator Framework Agreement for Integrated Design Team Services (National Association Of Building Co-Operatives (NABCO))
Integrated design team services associated with the NABCO housing development and refurbishment programme. The design team services to be provided comprise the following principle services / disciplines and specialist services: Architect including Fire Safety Design and PSDP, Civil/Structural Engineer, Mechanical and Electrical Engineer, Quantity Surveyor. View the procurement »
2015-05-27   120 bed development for the National Rehabilitation Hospital at Rochestown Avenue, Dunlaoghaire, Co Dublin (National Rehabilitation Hospital)
120 bed development for the National Rehabilitation Hospital at Rochestown Avenue, Dunlaoghaire, Co Dublin. View the procurement »
2015-05-26   Appointment of Design Consultant Industrial Building Upgrade and Refurbishment Project (Shannon Commercial Properties)
The proposed project will include the upgrade and refurbishment of industrial buildings at Bay 37 Shannon Free Zone. The key aim of the project is to proceed immediately with the planning, design and upgrade of a large industrial building with all associated site development and building modification works. Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant to deliver and manage all … View the procurement »
2015-05-21   Stage 1 - Suitability Assessment Questionnaire for Design Team for completion of Hanging Gardens Development, Henry... (Limerick City and County Council)
Stage 1 - Suitability Assessment Questionnaire for Design Team Services for the completion of the development of the Hanging Gardens site and the adjacent site at no. 19 Henry Street, Limerick City. The Design Team will be appointed on the basis of either a design and build procurement route or a traditional procurement route. View the procurement »
2015-04-22   Establishment of a single-party framework for an integrated consultancy service for a Spatial Implementation and... (Wexford County Council)
The Contracting Authority is seeking to establish a single-party framework agreement for an integrated multi-specialist consultancy service to deliver a Spatial Implementation Plan and an Economic Development Plan for the revitalisation of the Wexford Quay Area in Wexford Town. The framework agreement will be established with a single economic operator comprising at a minimum the following disciplines: Spatial and Urban Planning Services; Economic and Business Service; Architectural Services; Cultural … View the procurement »
2015-04-10   Quantity Surveying Consultancy Services — National Archives, Ireland (Office of Public Works (OPW))
Provision of Quantity Surveying consultancy services in relation to renovation works at the National Archives, Dublin, Ireland. View the procurement »
Mentioned suppliers: Henley Kavanagh McGowan
2015-04-02   Multi Operator Framework Agreements of 4 Years Duration for Civil Engineer Led Multi-disciplinary Design Team... (Horse Racing Ireland (HRI))
Horse Racing Ireland (HRI) wishes to engage in a competitive process to establish a Multi -party framework agreement of 4 years' duration for the provision of a Civil Engineer Led Multi-disciplinary Design Team Services for Minor Capital/Remedial Works at Horse Racing Ireland Race Courses. The Racecourses covered under this framework are as follows: · Leopardstown Racecourse · Fairyhouse Racecourse · Navan Racecourse · Tipperary Racecourse. View the procurement »
Mentioned suppliers: Please refer to details below
2015-03-20   Single-Party Framework Agreement for integrated design team services for the development of the Institute of... (Institute of Technology Tallaght)
The Contracting Authority is seeking to establish a single-party framework agreement for integrated design team services for the development of its campus. The framework agreement will be established with a single economic operator comprising the following disciplines: (a) Project Management Services, (b) Architectural Services, (c) Civil and Structural Engineering Services, (d) Quantity Surveying Services, (e) Mechanical and Electrical Engineering Services and (f) Project Supervisor for the Design … View the procurement »
Mentioned suppliers: Aecom Professional Services Ltd