2020-01-24Architectural Services for Additional Accommodation at Presentation Secondary School, Listowel (Presentation Secondary School (Listowel))
Architectural services for additional accommodation at presentation secondary school, Listowel, Co. Kerry, comprising:
— 3 general classrooms 58 m each (prefab replacement),
— 2 science labs 88,6 m each,
— 1 science prep area 38 m,
— 2 general classrooms for moderate learning disabilities 28,6 m,
— student and staff toilets,
— locker space,
— circulation 119 m,
— internal partitions 39,8 m,
— staircases and lift 120 m,
— giving a gross floor area of 848,4 m,
— also clear out 2 existing labs and convert …
View the procurement » Mentioned suppliers:Kane Williams
2020-01-15Architectural Services for Additional Accommodation at St Mary's NS, Oldtown (St Mary’s National School (Dublin))
Architectural Services for additional accommodation at St Mary's NS, Oldtown, Co. Dublin, comprising:
(a) 2 Classroom SEN Base
— total area including walls and circulation 439 m, and
(b) 2 mainstream classrooms 80 m each including ensuite: 160 m
— 1 WC for assisted users 10,50 m,
— total area including walls and circulation 209 m,
— giving total floor area: 658 m, and
(c) secure hard and soft play area 200 m
— sensory garden 100 m,
— 6 parking spaces.
View the procurement » Mentioned suppliers:Demesne Architects
2020-01-05Architectural Services for Additional Accommodation at Mercy College, Sligo (Mercy College (Sligo))
Architectural services for additional accommodation at Mercy College, Sligo comprising:
(a) classroom and specialist room accommodation 896,2 m; and
(b) a 2 classroom SEN Base 524 m.
(a) classroom and specialist room accommodation:
— 1 general classroom 58 m (Prefab replacement),
— 1 textile room 88 m,
— 1 science laboratory 88,6 m,
— 1 science lab prep area 38,5 m,
— 1 art and craft room 118 m,
— 1 engineering (metal work) room 148 m,
— 1 engineering room prep area 58,6 m,
— 3 special education tuition …
View the procurement »
2019-11-20Architectectural Services for Additional Accommodation at Summerhill College (Summerhill College)
Architectectural services for additional accommodation at Summerhill College, Sligo, comprising:
— 4 x general classrooms 38,5 m each,
— 1 x pastoral office 15 m,
— 2 x science labs 88,6 m each,
— 1 x prep area(shared) 38,5 m,
— 1 x wood technology room 148 m,
— 1 x prep area 58 m,
— 2 x 70 m SEN class base 70 m each,
— 2 x12 m small safe spaces 12 m,
— 1 x Office 15 m,
— student and staff toilets,
— locker space,
— circulation 170 m.
Giving total floor area 1 037,6 m.
View the procurement »
2019-11-01Integrated Design Team for Spatial Masterplan for Shannon Town (Clare County Council)
Clare County Council invites tenders to this RFT from economic operators for the provision of integrated design team (IDT) services for the preparation of a spatial masterplan for a specific area (30 ha) in Shannon Town to focus and agree an economic and spatial pattern for Shannon Town. The IDT will comprise of the following principal specialist services.
Principal services:
— architect (project lead) and urban designer,
— planning consultant.
specialist services:
— landscape architect,
— engineering …
View the procurement »
2019-10-25Architectectural Services for Additional Accommodation at St Macartan's College (St Macartan's College)
Architectectural services for additional accommodation at St Macartan's College comprising:
1) Special education needs
— a 2 classroom Special education needs (SEN) Base 507 m,
— total floor area including internal walls, partitions and circulation 649,73 m.
2) Engineering room
— one engineering room 149 m,
— preparation area 59 m,
— circulation area 40 m,
Giving total floor area of 898 m.
3) Also
— secure hard and soft play area 200 m,
— sensory Garden 100 m,
— nine parking spaces.
View the procurement »
2019-10-16Architectural Services for Additional Accomodation at CBS New Ross (CBS Secondary School (New Ross))
Architectural services for additional accomodation at CBS New Ross comprising:
— 3 additional general classrooms 175,8 m,
— 1 general classroom to replace existing prefab 58,6 m,
— 1 DCG room 88,6 m,
— 1 home economics room 118,6 m,
— special education tuition room m,
— student and staff toilets 38 m,
— locker space 50,4 m,
Giving gross floor area including circulation and partitions: 701,4 m.
View the procurement »
2019-09-20Architectural Services for Additional Accommodation at Scoil Pól, Kilfinane (Scoil Pol)
Architectural services for additional accommodation at Scoil Pól, Kilfinane comprising:
— 3x 38.5m General classrooms (Prefab replacement),
— 1x 58.6m General classroom,
— 1x 127m Science Lab a,
— 1x 38.5m Science Preparation Area,
— 1x 118.6m Art room,
— 1x 88.6m Music room,
— 1x 149m Construction room,
— 1x 58.6m Materials Prep area,
— 1x 88.6m DCG room and Ancillary,
— Student and Staff Toilets,
— Locker Space.
Giving Gross Floor Area including circulation and partitions of 1 186.9 m.
View the procurement »
2019-09-20UCD Science Infrastructure: Programming, Laboratory Planning and Basis of Design (University College Dublin (UCD))
UCD is seeking submissions from suitably qualified parties to undertake, programming of space, laboratory and science facility planning and design services for the UCD Science Community. The services will also include brief refinement and provisional design services relating to science phase 3. This programming knowledge (stage 1) will allow the University to plan its infrastructural requirements for the medium to long term in the areas under study (focus schools and buildings detailed below). This will …
View the procurement » Mentioned suppliers:Hawkins Brown
2019-09-18Architectural Services for Additional Accommodation at Sacred Heart School Westport, Co. Mayo (Sacred Heart School (Westport))
Architectural services for additional accommodation at Sacred Heart School Westport, Co. Mayo comprising of:
— 1 general classroom 38,5 m,
— 2 science laboratories 177,2 m,
— 1 science prep area 38,5 m,
— 1 technology room 148,8 m,
— 1 technology prep area 58,6 m,
— 1 staff room 149 m,
— 1 special education tuition room 15 m,
— student toilets and 1 universal student toilet,
— staff toilets,
— locker space.
Giving gross floor area including circulation area and partitions of 889,8 m.
Also:
— removal of 7 …
View the procurement »
2019-09-17Multi-Operator Framework Agreement for Architectural Consultancy Services for AIT (Athlone Institute of Technology)
Athlone Institute of Technology (AIT) wishes to establish a 4-year multi-operator framework agreement for architectural consultancy services for all works projects and other professional architectural services requirements that arise during the lifecycle of the framework agreement. The initial project (and the project used to establish the multi-operator framework agreement) is the STEM quadrangle development project.
View the procurement »
2019-09-12ER Led Design Team Framework Tender (Fingal County Council)
Fingal County Council is seeking to establish a multi-party framework agreement for employers representative led integrated design team services for construction and refurbishment/upgrading/repair type projects including but not limited to residential use, estate/public space areas, public buildings and facilities, public realm type works, etc. The construction projects envisaged will range in value from 1 000 000 EUR – circa 20 000 000 EUR and may be a combination of a number of sub-projects for …
View the procurement »
2019-08-12Project Monitoring Team to Monitor Works (Central Bank of Ireland)
The Central Bank of Ireland (CBoI) has acquired Block 4 and 5 at the Dublin Landings Development, Dublin 1.
The developer will complete CAT B works, in addition to the base build and CAT A works.
CBoI now intends to appoint a project monitoring team to monitor these works on their behalf and are seeking to engage the services of a multi-disciplinary purchasers monitoring team, led by an architect, to perform the services set out in the scope of service document available at the abovementioned …
View the procurement » Mentioned suppliers:HLM
2019-08-01MetroLink Concept Architect (Transport Infrastructure Ireland (TII))
Transport Infrastructure Ireland require a concept architect for the MetroLink project. A key requirement of this role is to work with the engineering designer in ensuring that the developed concept design and architectural vision is consistently followed throughout the project from preliminary design stage through to project completion.
The MetroLink Project is the development of a north-south urban railway service that will run between Swords and Charlemont, linking Dublin Airport, Irish Rail, DART, …
View the procurement » Mentioned suppliers:Grimshaw LLP
2019-06-11Architectural Services for extension to Scoil Uí Riada Kilcock Co Kildare (Scoil Ui Riada)
Architectural services requested for the provision of additional accommodation to Scoil Uí Riada. The project comprises:
— 7 Classrooms incl WC and storage,
— 3 Special Education Tuition Rooms,
— 2 Staff WCs,
— sub-total additional accommodation: 609 m,
— gross floor area including walls, circulation stairs and possible lift: 780 m.
View the procurement »
2019-06-10Architectural Services for Extension to St Patrick's Classical School, Navan (St Patrick's Classical School)
Request for architectural services for the provision of additional accommodation to St Patrick's Classical School. The project comprises:
— 1 science laboratory,
— 1 science preparation area,
— 6 general classrooms,
— 1 home economics room,
— 1 textiles room,
— 1 technology room,
— 1 technology preparation area,
— 1 technical graphics room,
— removal of existing prefabs,
— student toilets,
— universal toilet,
— staff toilets,
— locker space,
— circulation, staircases, lift,
— giving a total floor area of …
View the procurement » Mentioned suppliers:Gaffney and Cullivan
2019-06-08Design Team Services for Additional Accommodation for Dominican College (Dominican College Wicklow)
The project comprises:
— 3 science laboratories,
— 2 science preparation areas,
— 1 design and communication graphics room,
— student toilets including a universal toilet,
— staff toilets,
— locker space,
— conversion of 2 existing science laboratories to classrooms,
— gross floor area of new accommodation including circulation and partitions: 620 m.
View the procurement »
2019-05-10Provision of Consultancy Services to Dublin City Council in 6 Lots as follows to support a Feasibility Study under... (Dublin City Council)
Dublin City Council proposes to engage in a competitive process for the award of 6 contracts as specified hereunder. Each service provider appointed will be required to work as part of the feasibility team to deliver the objectives set out in Section 2.1. of the tender document. The Lot 5 successful tenderer (building development and project management consultant) will take the lead role in coordinating the Team.
Lot 1: Communications Consultants.
Lot 2: European Cultural Project Management and …
View the procurement »
2019-05-03Architect Led Design Team for new National Learning College at Rehab Group, Park House, Stillorgan (The Rehab Group)
The project consists of the provision of consultancy services — architect led design team which shall include lead architect, conservation architect, structural and civil engineer, quantity surveying, mechanical/electrical services, Project Supervisor Design Process (PSDP), design and assigned certifier and employer’s representative, planning consultancy, traffic management and landscape architect for the proposed development of a new National Learning Network (NLN) College at Rehab Group, Park House, …
View the procurement » Mentioned suppliers:McCullough Mulvin Architects
2019-04-18City Block 19, Grand Canal, Dublin — IDT Services (Waterways Ireland)
The Contracting Authority is holding a competition to select an architect led design team to both design and obtain planning permission for the development of City Block 19, Grand Canal, Dublin — Government Capital Works Management Framework (CWMF) Stages I and II. It is intended that the contract to be awarded will be with a single economic operator. Details in relation to the required competencies and criteria for the successful economic operator are set out in procurement documents (in particular the …
View the procurement »
2019-04-11LWETB 2019 — Architect led Design Team Services (Longford and Westmeath Education and Training Board)
LWETB invites tenders for an architect led design team — architectural, civil/structural engineering, building services (M&E) engineering and quantity surveying services for additional accommodation building project at Columba College, Killucan, Co. Westmeath. The project is type 2a(2) and includes a double class special educational need suite, general classroom, science lab and prep area, construction studies room and prep area, general purpose room, standard WCS and WCS for assisted users.
View the procurement » Mentioned suppliers:Quinn Barnwall Buggy
2019-03-12Single Point Architectural led Multi-Disciplinary Design Team (Technological University Dublin)
Full architectural services:
This competition is for the appointment of a single point architectural led multi-disciplinary design team for the delivery of a renovation of the existing TU Dublin buildings at Broombridge for the new Broombridge Design/Construct and Recreation Centre on behalf TU Dublin. The overall gross floor area of proposed building will be circa 8 000 m. The existing building floor area is approx. 5 721 m. The architect will be the design team leader. Refer to the project information …
View the procurement »
2019-02-19Provision of a Multi-Party Framework for Services relating to Construction Projects (Bus Eireann/Irish Bus)
Bus Eireann intends to establish a multi-party framework agreement of service providers to complete project management from concept through to completion, ensuring that at each phase the client’s needs are understood and delivered on under Lot 1 and/or Lot 2. Projects will be mixture of new build and existing building renovation.
Lot 1 – Minor projects up to construction value of 200 000 EUR;
Lot 2 – Medium to large works over 200 000 EUR.
View the procurement »
2018-12-19Single Point Design Team Historic Accommodation Buildings Project (Trinity College Dublin, the University of Dublin)
The Trinity College Dublin Historic Accommodation Buildings Project proposes to refurbish the Rubrics Building and the Chief Steward’s House, for residential and support uses. The Rubrics Building is the oldest building on Campus, dating from c. 1699. The Chief Steward’s House is a valued building situated within the historic 19 century campus environs. Trinity College plans to refurbish both buildings for ongoing residential accommodation and support uses. The refurbishment will seek to provide modern …
View the procurement » Mentioned suppliers:Pascall + Watson