Procurements: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (page 11)
2016-02-12Multiparty Framework Agreement for Road Resurfacing Works and Associated Minor Works 2016 — 2019 (Kildare County Council)
Kildare County
Council proposes to
establish and
operate a Framework
Agreement for Road
Resurfacing and
Associated Minor
Civil Works 2016 -
2019. The proposed
works includes:
— Site preparation,
planing and removal
of defective
material,
— Laying of
bituminous tack coat
(required under each
asphaltic layer),
— Laying of
asphaltic concrete
inlays, overlays and
surface course,
— Traffic and
Pedestrian
Management, and,
— Project Supervisor
Construction Stage
(PSCS).
Minor Civil Works
including, but …
View the procurement »
2016-02-1015/159 — Ballyshannon Regional Water Supply Scheme Contract No 1 — Water Treatment Plant and Primary Network Design... (Ervia)
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains.
The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an …
View the procurement »
2015-12-23Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold... (The Office of Government Procurement)
The Commissioners for Public Works in Ireland is seeking the Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures for various events of National and State importance including but not limited to the Decade of Centenaries. Many of the Decade of Centenaries Events are listed on the www.ireland.ie website, which is updated regularly, however, there are likely to be other events in addition to those listed. Please note that temporary …
View the procurement »
2015-12-11Inniscarra Sludge Upgrade Contract (Ervia)
Provision of sludge thickening and dewatering facilities and upgrade of existing sludge treatment facilities at Inniscarra Water Treatment Plant, and the operation and maintenance of only the sludge treatment facilities for 1 year with the option to extend this to 2 years.
View the procurement » Mentioned suppliers:Glan Agua Ltd
2015-11-20Service Concession Contract (Drogheda Port Company)
Drogheda Port Company hereby invites interested parties to participate in a competition for a ‘Service Concession Contract’ to operate and manage a proposed Industrial Emissions Licensed Facility at their Tom Roes Point Terminal for the purposes of exporting certain waste products.
View the procurement » Mentioned suppliers:Fast Terminals Ireland Ltd
2015-09-21Inistioge Water Supply Scheme (Ervia)
The proposed works will include the upgrade of the supply to Grennan WTP with the installation of a new borehole to supplement the existing boreholes, an upgrade to Grennan WTP, installation of 17,62 km of water main from Grennan to the existing reservoir at Ballygub, Inistioge, installation of a new reservoir at Kilmacshane, Inistioge, installation of a booster pumping station at Kilcross, Inistioge and decommissioning of the existing intake and treatment plant at Ballygub WTP, together with associated …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2015-09-07Runway 10/28 and Associated Taxiways Rehabilitation and Enhancements to (Dublin Airport Authority plc (DAA))
This particular project is located within Dublin Airport (airside) which opened to operations in 1941. In 1950, annual passenger traffic was recorded at 212 661 persons with 16 769 air transport movements. By 2008, passenger numbers had risen to some 23 500 000 (passengers) with more than 210 000 commercial air transport movements. During 2008-2012 these numbers reduced, however Dublin Airport has enjoyed steady growth since then and in 2014 there were 21 700 000 passengers. The airport has progressively …
View the procurement »
2015-09-04Enniscorthy Sewerage Scheme Phase 3: Contract 1 — Wastewater Treatment Plant Upgrade (Ervia)
Irish Water plan to undertake the following works:
— Refurbishment/Upgrade/Expansion of the existing Enniscorthy Wastewater Treatment Plant (WwTP).
— Refurbishment/Upgrade of the existing infrastructure at St Johns Pumping Station and Promenade Pumping Station.
— Provision of storm-water handling facilities.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Response/Ward and Burke JV
2015-08-29LESC District Energy System (University College Cork (UCC))
University College Cork will utilise the National Energy Services framework set up by Sustainability Authority of Ireland (SEAI) in order to seek proposals from the energy services market that will fund an upgrade of the existing heating system via energy performance related payments or local energy supply contracts. A contract for installation and construction works to a new CHP energy centre followed by ongoing operation and maintenance of the energy centre together with the supply of energy to the …
View the procurement »
2015-08-07Single Party Framework for Fibre-Optic Network and Infrastructure Management Services (Dublin Docklands Development Authority)
Dublin Docklands Development Authority invites applications to be considered for the competitive dialogue procedure for the awarding of a single party framework agreement for Fibre-Optic Network and Infrastructure Management Services at the Dublin Docklands Area.
The Authority wishes to appoint a company to provide and deliver a range of ducting related services to the Executive and the Board of the Authority and with its successor in Dublin City Council.
The Authority owns a substantial multi-operator …
View the procurement »
2015-08-06Castlerea and Environs Water Supply Scheme — Phase 1 Ballyhaunis to Garranlahan and Williamstown (Ervia)
Irish Water propose to extend the Lough Mask Regional Water Supply Scheme to supply Castlerea and a number of further towns and villages in Counties Roscommon and Galway. The first phase is to supply treated water from an existing service reservoir in Ballyhaunis County Mayo onward to Garranlahan in County Roscommon and to Williamstown in County Galway. Under the proposals the existing sources would be abandoned and the schemes will be supplied with water from the Lough Mask scheme via Ballyhaunis using …
View the procurement » Mentioned suppliers:BSG Group
2015-08-05Supply of Heating and Domestic Hot Water to Cromcastle Court (Dublin City Council)
Tenders are invited for a service provider to enter into a fixed term agreement to provide heating and domestic hot water to apartments in Cromcastle Court.
It is expected that the proposal from the successful service provider, shall include a commitment to the upgrade of the existing heating system or the installation of a new system of boilers and hot water tanks to increase the energy efficiency and reduce the environmental impact of heat and hot water.
View the procurement » Mentioned suppliers:Heat Angels & Co Ltd
2015-07-08Swords Watermain Rehabilitation Scheme (Ervia)
Design and Construction of the rehabilitation of an existing 30“ diameter pre-stressed concrete watermain by a combination of open cut and sliplining techniques.
In total approximately 5 200 m of watermain is to be rehabilitated.
View the procurement » Mentioned suppliers:GMC Utilities Group
2015-05-29N61 Ratallen and Treanagry Road Improvement Scheme (Roscommon County Council)
The N61 Ratallen and Treanagry Road Improvement Scheme comprises of the realignment and widening of approximately 2,7 km of Type 2 Standard Single Carriageway of the existing N61, split between approximately 1,2 km in the townland of Ratallen and approximately 1,5 km in the townland of Treanagry. The Scheme will include sections of online cycleway. In addition, there will be realignment and widening of a number of side roads and private accesses. The Works will include Contractor design of structural …
View the procurement » Mentioned suppliers:Clare Civil Engineering
2015-05-20Single-Party Framework Agreement for the Supply and Installation of Working at Height Equipment (Beaumont Hospital)
The Contracting Authority intends to establish a framework agreement with a suitably qualified and experienced economic operator for the supply and installation of working at height equipment. Over the duration of the framework agreement, the Contracting Authority intends to install necessary measures to provide a safe working at height environment on a programmed basis through a series of defined work packages. The initial contract to be awarded under this framework agreement comprises the installation …
View the procurement » Mentioned suppliers:Skyway Safe Access Equipment
2015-05-14Capacity Development Management Building Contract at Dublin Airport (daa plc)
A 5 year capacity development plan has been prepared to improve functionality and capacity of Dublin Airport. The output of this plan is a requirement to enhance components of the existing building infrastructure. As part of this overall plan, the following works are proposed to be carried out:
1. Pier 2 Segregation;
2. T1 and T2 Bussing Gates;
3. T2 Transfer Facility;
4. Pier 3 Wide Body Facility;
5. T1 Security Screening Facility;
6. New areas created to facilitate displaced staff;
7. Any associated …
View the procurement »
2015-05-08Public Lighting and Associated Services Maintenance 2015 (Mayo County Council)
Mayo County Council (the Lead Contracting Authority) is procuring on its own behalf and on behalf of the following local authorities; Galway County Council, Galway City Council, Roscommon County Council, Leitrim County Council and Sligo County Council a contract for the repair, service/maintenance of its public lighting. The successful Tenderer (Contractor) will be required to enter into a contract with each individual local authority once the tender has been evaluated. However, the contracting authority …
View the procurement » Mentioned suppliers:Electric Skyline Ltd
2015-04-28Belmullet DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the construction of a new wastewater treatment plant (2,500 PE) and new marine sea outfall together with modifications and upgrading of the existing wastewater collection system including the construction of two new pumping stations and associated rising mains.
Contract to include for the operation and maintenance of the the works for a period of 2 years post construction.
View the procurement »
2015-04-22Tubbercurry, Grange, Strandhill and Ballinafad Wastewater Treatment Plant Bundle DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the upgrade of the existing Tubbercurry, Grange, Strandhill and Ballinafad wastewater treatment plants (WwTP) and the Strandhill Pumping Station. Other works include the construction of a new combined sewer overflow (CSO) diversion and outfall discharge pipelines in Tubbercurry and associated ancillary works. There will also be a 2 year operational period and it is intended that the works will be implemented under a Design, Build and Operate (“DBO”) Contract.
View the procurement » Mentioned suppliers:Coffey Northumbrian Ltd
2015-03-1315/019 — North Docklands Sewerage Scheme for Irish Water (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the construction of a new sewerage collection network along Sheriff Street Upper and Castleforbes Road in the North Docklands area of Dublin City. The scheme will facilitate the transfer of flows from Sheriff Street Upper, Castleforbes Road and Alexandra Road to the Spencer Dock Pumping Station.
It is intended that the works will be implemented under a Design and Build (‘DB’) Contract, Irish Water Major Civils Works Networks Contract.
View the procurement »
2015-03-06N84 Luimnagh Realignment Scheme (Galway County Council)
— The proposed works will involve construction of approximately 4.5 km of Standard Single Carriageway, typically with 2 x 3.65 m carriageway, 2 x 2.5 m hard shoulder, and verges of approximately 3.0 m. Approximately 3 km will comprise predominantly online realignment widening, 1.5 km approximately is new alignment construction.
— This section will also entail modification and re-alignment of 3 no. existing local side road junctions and 2 no. new junctions including numerous access points, domestic and …
View the procurement » Mentioned suppliers:Carey Group PLC
2015-02-27N59 Rossow Bends (Mayo County Council)
Improvement of the existing N59 National Secondary Route comprising the construction of a Type 3 single carriageway road (6,0 m carriageway road with 0,5 m hard strips and verges of approximately 2,0 m to 3,0 m) for a distance of approximately 2 km, with approximately 650 m of the scheme being constructed off-line.
Construction of a cycleway 2,5 m wide alongside the improved N59 in sections.
Improvement of existing side road junctions.
Construction of two new river bridges and widening one existing river …
View the procurement » Mentioned suppliers:Ward & Burke Construction Ltd
2015-01-24Galway County Council framework for pavement works and associated works on national roads (Galway County Council)
The Contracting Authority wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be minimum 3 and maximum 8 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 18 months. The Contracting Authority may, at its absolute discretion, extend the Framework Period by a further 24 months in 12 month increments and a …
View the procurement »
2015-01-23Framework Agreement for Pavement and Associated Minor Works for National Roads (Sligo County Council)
Sligo County Council wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be minimum 3 and maximum 8 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 24 months. Sligo County Council may, at its absolute discretion, extend the Framework period by a further 24 months in 12 months increments such that the …
View the procurement »
2015-01-05Automatic Tray Return Systems (ATRS) (daa plc)
Daa currently has a number of passenger search areas in service across its 2 Terminals at Dublin (Terminal 1 and Terminal 2) Airport. These Search areas are an essential component of the Terminal operations at each Airport. As well as being required to be efficient and smooth they must first and foremost comply with both EU and International Compliance Regulations. As a result, daa plc intends to upgrade the existing passenger screening systems between 2015 and 2016 to accommodate enhanced security …
View the procurement »
2015-01-05Airside Electrical Installation Framework (daa plc)
The Contracting Authority proposes to appoint between 4 and 8 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield Electrical construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2015 to 2019 inclusive.
View the procurement »
2014-12-12N56 Boyoughter to Kilkenny Road Scheme (Donegal County Council)
The Contract comprises the execution and completion of the N56 Boyoughter to Kilkenny Road Scheme, including without limitation, the provision of:
— On-line improvements and off-line realignment of approximately 4.95 kilometres of sub-standard national secondary road to the standard of Type 3 single carriageway (T3SC) national secondary road, together with the provision of a segregated cycle facility;
— Realignment of various single carriageway local roads;
— Various Minor Structures necessary as part of …
View the procurement » Mentioned suppliers:Wills Bros Ltd
2014-12-12N15 Blackburn Bridge — Phase 1 (Donegal County Council)
The N15 Blackburn Bridge Phase 1 comprises the construction of approximately 2.4 kilometres of standard single carriageway which is located to the southwest of Ballybofey Town.
— On-line improvements and off-line realignment of national road to the standard of Type 1 single carriageway (S2);
— Realignment of 2 single carriageway local roads;
— 1 no. Bridge Structure, together with all other Structures necessary as part of the Design and the Works, including 3 no. culverts;
— Various earthworks in areas …
View the procurement » Mentioned suppliers:Wills Bros Ltd
2014-12-01Signs Programme Framework Agreement 2015 (National Roads Authority (NRA))
Signs Programme incorporating, but not limited to:
The provision of and maintenance of road signs and ancillary works on single, dual carriageway and motorway sections of the national road network and ancillary road networks to be outlined in Works Contracts issued during the duration of the Framework Agreement.
View the procurement »
2014-10-29Dublin City Water Supply Scheme — Ballymore Eustace Water Treatment Plant — Sludge Treatment — M&E Contract for Irish Water (Ervia)
Irish Water is undertaking the provision of a new sludge treatment facility for the Ballymore Eustace Water Treatment Plant, to cater for the increase in capacity of the upgraded water treatment plant. The Ballymore Eustace plant is the largest Water Treatment Plant in Ireland, and requires Works to provide additional sustainable sludge treatment capacity to meet medium and long term water demands.
Please refer to the Pre-Qualification Questionnaire for full scope.
View the procurement »