2015-12-23Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold... (The Office of Government Procurement)
The Commissioners for Public Works in Ireland is seeking the Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures for various events of National and State importance including but not limited to the Decade of Centenaries. Many of the Decade of Centenaries Events are listed on the www.ireland.ie website, which is updated regularly, however, there are likely to be other events in addition to those listed. Please note that temporary …
View the procurement »
2015-12-18Haulbowline Island East Tip Remediation Project, Cork Harbour, Ireland (Cork County Council)
The Haulbowline East-Tip is located in Cork Harbour Ireland and is approximately 9ha in size. On the North, South and East it is bordered by the Cork Harbour Waters and on the West it is bordered by lands under the control of the Irish Naval Services. The Haulbowline Island East Tip Remediation Project is to be executed under a Design-Build Contract. The project is to be executed under the following regulatory consents:
— Planning Consent: The consent Ref: PL04.MT0001 can be viewed at www.pleanala.ie
— …
View the procurement » Mentioned suppliers:PJ Hegarty & Sons EMCC JV
2015-12-15The New Stewarts School (Stewarts School)
A new two storey school building of 7 076 m², with an enclosed external play area occupying part of the first floor. The new building is designed to occupy a 2.07ha brownfield site.
View the procurement »
2015-12-11Inniscarra Sludge Upgrade Contract (Ervia)
Provision of sludge thickening and dewatering facilities and upgrade of existing sludge treatment facilities at Inniscarra Water Treatment Plant, and the operation and maintenance of only the sludge treatment facilities for 1 year with the option to extend this to 2 years.
View the procurement » Mentioned suppliers:Glan Agua Ltd
2015-12-07Extension and refurbishment at Sancta Maria College, Louisburgh, County Mayo (Board of Management Sancta Maria College)
Tender for Extension and refurbishment at Sancta Maria College, Louisburgh, County Mayo. The works, as shown on the Tender Drawings, comprise the demolition of part of existing school building, the refurbishment of the remaining building and the construction of a new extension including new Entrance, Atrium/G.P. Hall, Teaching Spaces, Physical Education Hall, Administrative and Ancillary Spaces, Storage and Circulation. Works will also include mechanical and electrical installations and site works for …
View the procurement »
2015-12-04Works Contractor and PSCS for new build St. Laurence O‘Toole Special School, 15-16 Emerald Street and 42-43 Seville... (Sean Harrington Architects)
The site for the proposal consists of no’s 42 and 43 Seville Place and no’s 15-16 Emerald Street. These are all in a significant state of decay and are not habitable.
Recently, Dublin City Council listed these buildings as dangerous structures, and as a result no. 15 Emerald Street was part-demolished and hoarded off. The proposed new use for the site is a Special School. This is an educational establishment to educate and care for children with behavioural difficulties. The principles of the composition …
View the procurement »
2015-11-20Service Concession Contract (Drogheda Port Company)
Drogheda Port Company hereby invites interested parties to participate in a competition for a ‘Service Concession Contract’ to operate and manage a proposed Industrial Emissions Licensed Facility at their Tom Roes Point Terminal for the purposes of exporting certain waste products.
View the procurement » Mentioned suppliers:Fast Terminals Ireland Ltd
2015-11-19New 32 Classroom Primary School, St Mochta's National School, Clonsilla (St Mochta's National School)
Expressions of Interest are invited from suitable qualified building contractors
who wish to be considered for the demolition/removal of all existing buildings and
structures on the site and the construction of a new 32 classroom primary school
(approx. 5200 sq.m.), and ancillary accommodation, over two stories. The
project will be constructed over 4 separate phases, and includes the provision of
temporary building to serve the school during the construction of the new
building.
View the procurement »
2015-11-16DCU Campus Developement- Stokes Building Extension (Dublin City University ( DCU ))
As part of a Campus Development Plan, Dublin City University is progressing plans to construct two new facilities on Campus (Stokes Building Extension and Student Hub Redevelopment). This procurement process is for the construction of the new Stokes Building Extension. The project has an indicative value of approx. EUR 7 500 000. The project has planning permission as per Dublin City Council
planning reference 3207/14.
The Works are expected to include a new four storey extension (3 180 m² approx) to the …
View the procurement » Mentioned suppliers:Clancy Project Management
2015-10-09New 35 Classroom replacement Primary School (St. Oliver Plunkett School (Malahide))
The project will consist of the construction of a new 2/3 storey, 35 classroom replacement primary school building (approx 5 484 m), including phased demolition and removal of existing school buildings, provision of 2 storey temporary school accommodation (and removal of same on completion), temporary play areas and all associated site development works.
View the procurement »
2015-09-29Construction of a Radiation Oncology Centre at Cork University Hospital (Health Service Executive (HSE))
Construction of a Radiation Oncology centre at Cork University Hospital (CUH):
A new facility of approximately 8 800 m² (Gross Floor Area) over three storeys above ground level, including Bunkers for seven Linear Accelerators and support accommodation, a Brachytherapy Suite, Shelled Out MRI Suite, 2 no CT Scanners, On-Treatment Support, Technical and Administration support accommodation and associated site works.
The Works will be carried out on active hospital campus site and will involve the …
View the procurement »
2015-09-25Metal Fabrication Services (Iarnrod Eireann-Irish Rail)
The Chief Mechanical Engineer (CME), Chief Civil Engineer (CCE), Signal and Electrical (SET) and Building and Facilities (B&F) divisions of Iarnród Éireann (IÉ) have small scale regular requirements for Metal Fabrication Services using mild steel, stainless steel and aluminium. IÉ are therefore seeking applications from suitably qualified and experienced companies to participate in the Pre- qualification process to establish a multi-party framework agreement for Metal Fabrication Services on an ongoing …
View the procurement »
2015-09-25Mechanical and Electrical Contractors Frameworks (daa plc)
The Contracting Authority proposes to set up a non-exclusive framework agreement with a number of Mechanical and Electrical Engineering Contractors for projects at Dublin Airport for the next 4 years (with an option to extend for 1 further year) subject to ongoing satisfactory performance and workload.
This RFT process is to identify suitable Tenderers for consideration for inclusion on the Framework Panel/s.
View the procurement »
2015-09-24New Build Post Primary School (Dún an Rí College) (1) (Cavan and Monaghan Education and Training Board)
A new build 6 237 m² Post Primary School on a steeply sloping site in the town of Kingscourt, Co. Cavan. The project involves the construction of a mini roundabout and associated public road modifications on the main road through Kingscourt. The buildings are arranged in 2 blocks ranging from 2 to 4 storeys in height in addition to a double height sports hall. Site works include internal vehicular and pedestrian access routes, car parking for 68 No cars, drop off zone for buses, service yard, ball …
View the procurement »
2015-09-21Inistioge Water Supply Scheme (Ervia)
The proposed works will include the upgrade of the supply to Grennan WTP with the installation of a new borehole to supplement the existing boreholes, an upgrade to Grennan WTP, installation of 17,62 km of water main from Grennan to the existing reservoir at Ballygub, Inistioge, installation of a new reservoir at Kilmacshane, Inistioge, installation of a booster pumping station at Kilcross, Inistioge and decommissioning of the existing intake and treatment plant at Ballygub WTP, together with associated …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2015-09-182016 / 2017 Road Construction Framework (Coillte Teoranta)
Coillte has a national annual construction program of between approximately 100-130 km of new and upgrade of unbound forest roads and associated ancillary works. This program of works consists of a broad range of road construction projects including some small projects and projects with short lead in times. All works are to be completed to the standards and specifications as out- lined in the Coford Forest Road Manual — Guidelines for the Design, Construction and Management of Forest Roads (copies …
View the procurement »
2015-09-08Oaklee Housing Trust is seeking a further tranche of expressions of interest in the design and build of Social... (Oaklee Housing Trust)
A further tranche of expressions of interest are sought from suitably resourced and experienced contractors/developers for the design and build of Social Housing on developer owned/controlled land banks. It is envisaged that the developments will consist of between 10 and 50 dwellings (other quantities outside these parameters will be considered based on location, cost and demand) and the sites will be in areas where there is a strong social housing demand. The proposed sites should have the requisite …
View the procurement »
2015-09-07Runway 10/28 and Associated Taxiways Rehabilitation and Enhancements to (Dublin Airport Authority plc (DAA))
This particular project is located within Dublin Airport (airside) which opened to operations in 1941. In 1950, annual passenger traffic was recorded at 212 661 persons with 16 769 air transport movements. By 2008, passenger numbers had risen to some 23 500 000 (passengers) with more than 210 000 commercial air transport movements. During 2008-2012 these numbers reduced, however Dublin Airport has enjoyed steady growth since then and in 2014 there were 21 700 000 passengers. The airport has progressively …
View the procurement »
2015-09-07Proposed Mixed Use Development at 144 Richmond Road, Drumcondra, Dublin 3 for NABCO (National Association Of Building Co-Operatives (NABCO))
A 4-storey mixed use development (39 No apartments and 2 No commercial units) over basement car parking, i.e. 9 No 1 bed apartments (61,88 m each), 24 No 2 bed apartments (80,58 m- 84,67 m), 6 No 3 bed apartments (106,08 m each), 1 No Commercial Unit (28,84 m), 1 No Commercial Unit (73,09 m), new single storey ESB substation and switch room (20 m), bin stores, new pedestrian/vehicular access road from Richmond Road at the north-west end of the site and access ramp to the basement car park including 32 No …
View the procurement »
2015-09-04Enniscorthy Sewerage Scheme Phase 3: Contract 1 — Wastewater Treatment Plant Upgrade (Ervia)
Irish Water plan to undertake the following works:
— Refurbishment/Upgrade/Expansion of the existing Enniscorthy Wastewater Treatment Plant (WwTP).
— Refurbishment/Upgrade of the existing infrastructure at St Johns Pumping Station and Promenade Pumping Station.
— Provision of storm-water handling facilities.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Response/Ward and Burke JV
2015-08-29LESC District Energy System (University College Cork (UCC))
University College Cork will utilise the National Energy Services framework set up by Sustainability Authority of Ireland (SEAI) in order to seek proposals from the energy services market that will fund an upgrade of the existing heating system via energy performance related payments or local energy supply contracts. A contract for installation and construction works to a new CHP energy centre followed by ongoing operation and maintenance of the energy centre together with the supply of energy to the …
View the procurement »
2015-08-27Works Specialists with Design Input for the new children‘s hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
— The demolition of all buildings on the site of the new children's hospital;
— Construction of a new children's hospital building and associated helipad;
— A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
— Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps …
View the procurement »
2015-08-07Single Party Framework for Fibre-Optic Network and Infrastructure Management Services (Dublin Docklands Development Authority)
Dublin Docklands Development Authority invites applications to be considered for the competitive dialogue procedure for the awarding of a single party framework agreement for Fibre-Optic Network and Infrastructure Management Services at the Dublin Docklands Area.
The Authority wishes to appoint a company to provide and deliver a range of ducting related services to the Executive and the Board of the Authority and with its successor in Dublin City Council.
The Authority owns a substantial multi-operator …
View the procurement »
2015-08-06Castlerea and Environs Water Supply Scheme — Phase 1 Ballyhaunis to Garranlahan and Williamstown (Ervia)
Irish Water propose to extend the Lough Mask Regional Water Supply Scheme to supply Castlerea and a number of further towns and villages in Counties Roscommon and Galway. The first phase is to supply treated water from an existing service reservoir in Ballyhaunis County Mayo onward to Garranlahan in County Roscommon and to Williamstown in County Galway. Under the proposals the existing sources would be abandoned and the schemes will be supplied with water from the Lough Mask scheme via Ballyhaunis using …
View the procurement » Mentioned suppliers:BSG Group