2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-11-04Bantry to Kealkill Trunk Watermain Project (Irish Water)
Irish Water plans to undertake the construction of the following to deliver water from Bantry to Kealkill:
— Construction of new water mains.
— Replacement of defective water mains.
— Upgrade of river intake works.
— Construction of water booster pumping stations.
— Construct raw water mixing tank.
— Construction of treated water storage reservoirs.
— Associated ancillary works.
View the procurement »
2016-11-03Gas to Listowel (Ervia)
This works contract will be for the construction and commissioning of a distribution gas feeder main pipeline to Listowel Town Co. Kerry from Craggs Co. Limerick and include the installation of gas network and associated connections.
View the procurement » Mentioned suppliers:Murphys/GMC
2016-10-28N63 Abbeyknockmoy to Annagh Hill Road Scheme (Galway County Council)
The N63 Abbeyknockmoy to Annagh Hill Road Scheme comprises upgrade and improvement works to approximately 3.2km of the existing single carriageway near Abbeyknockmoy in Galway, Ireland.
The N63 National Secondary road links Moylough in East Galway to Galway City via the N17 national road. The proposed scheme, extends eastwards from the townland of Annagh Hill to immediately west of Abbeyknockmoy village. It will link the N17/ N18 Motorway Junction at Annagh Hill with a section of the N63 which has been …
View the procurement » Mentioned suppliers:Harrington Concrete & Quarries
2016-10-28Construction of 34 housing units at Dunmurry Rise, Kildare Town, Co. Kidlare (Kildare County Council)
The proposed project at Dunmurry Rise involves the construction of 34No. housing units with associated civil works. The development includes the construction of
— 6 no. one bedroom, single storey, terraced housing units.
— 6 no. two bedroom, two storey, terraced hosuing units.
— 18 no. three bedroom, two storey, terraced housing units.
— 2 no. four bedroom, two storey, end of terrace units.
— 2no. four bedroom, two storey, detached housing units.
The project also includes
— Construction of footpath …
View the procurement » Mentioned suppliers:MDY Construction Ltd
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 m².
View the procurement » Mentioned suppliers:Walls Construction Ltd
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the main Works Package — Main Contractor (Curragh Racecourse Ltd)
The Main Contract Works involves the construction of a new four storey grandstand building of approximately 10 500 m² including an atrium space, jockey and racing professional's facilities, restaurants, bars, premier members lounge, hospitality suites, broadcasting and media facilities, external terraces and seated viewing areas and associated back of house facilities.
The new grandstand will be covered by a visually dynamic cantilevering roof structure. A new single storey entrance arm which includes a …
View the procurement » Mentioned suppliers:John Sisk & Son (Holdings) Ltd
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Catering Equipment... (Curragh Racecourse Ltd)
The Catering Equipment contract involves the supply and installation of all identified ‘heavy equipment’ in relation to the Curragh Racecourse Redevelopment Project. As part of the contract the Catering Equipment Contractor will be responsible for all coordination drawings, based on the constructed structural spaces ensuring coordination with all equipment in the specification package. This shall include all bespoke and proprietary items (the detail design drawings shall be BIM models reflecting design …
View the procurement » Mentioned suppliers:Kaneco Limited
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-09-30New Acute Mental Health Unit at Sligo University Hospital (Health Service Executive (HSE))
The works consist of the construction of a new part single storey and part 2 story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3 500 sqm. Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure …
View the procurement »
2016-09-30IDA Ireland Athenry Strategic Site Infrastructure Works — Road Works Phase 2 (IDA Ireland)
Construction of a new road, including two bridges. One of the bridges will cross a railway.
The site is in the townland of Ballygarraun, Athenry, Co. Galway. The works are a continuation of the Phase 1 roadworks that were completed in 2010. Phase 1 links the M6 Motorway and regional Road R348. Phase 2 will extend northwards from the R348 and will include the following, along with other works:
— Single carriageway over 600m in length;
— Footway / Cycleway of varying widths and length;
— A roundabout;
— A …
View the procurement » Mentioned suppliers:Wills Bros Ltd
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »
2016-09-20N76 Callan Road Realignment (Kilkenny County Council)
The work comprises construction of a 4.4 km road improvement scheme,
consisting of 2.3 km of new and/or realigned road, 2.08 km of online road
improvements and all associated works including the provision of new drainage. It
also includes the provision of approximately 2.8 km of facilities for vulnerable road
users (cyclists & pedestrians) with new public lighting. The works include
associated site clearance, drainage works and earthworks, farm access roads,
fencing, pavement works, accommodation works, …
View the procurement » Mentioned suppliers:SIAC Construction Ltd
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly …
View the procurement »
2016-09-02Establishment of Small Works Construction Framework (Irish Prison Service)
2.3 The purpose of this Competition is to conclude frameworks (the “Frameworks) for each geographical region for the execution of construction of works within the Prisons Estate as more particularly described hereunder at Part 5 of this Establishment Document (the “Works”). The 5 highest ranking Tenderers shall each be awarded a place on the Framework for the Lot applied for and invited to tender for works between 6 000 EUR and 500 000 EUR (ex VAT) in value. Tenderers can compete for a maximum of 2 Lots. …
View the procurement »
2016-08-18Skibbereen Regional Water Supply Scheme (Irish Water)
Irish water is undertaking the amalgamation of a number of water supply schemes
formerly known as Schull WSS, Leap/Baltimore WSS Phase 2, Drimoleague WSS
and Skibbereen WSS Stage 4. The facilitation of this amalgamation requires the
construction of Water Treatment Plant upgrades, increased storage in key areas
of the network, network capacity upgrades and mains rehabilitation.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-08-12Drainage Repairs Moneypoint and Aghada Generating Stations (Electricity Supply Board ( ESB ))
ESB invites expressions of interest for the following: Repairs to storm and foul water drainage infrastructure, with a range of pipe repairs based on CCTV findings including patching, lateral cuts, relining, excavation repairs and manhole sealing. Following repair work, hydrostatic pressure testing to EN1610 is to be carried out on the repaired infrastructure. Location of services Moneypoint Power Station, Kilrush Co. Clare and may also include some work in Aghada Power Station, Co. Cork.
View the procurement »
2016-08-05Procurement of Works Contractor for UCC Student Hub at University College Cork (University College Cork (UCC))
The development will consist of the construction of a 6 storey Student Hub Building within the university campus adjoining College Road and Gaol Walk, Cork. The building will be used to provide student and administrative services and flexible learning spaces. The gross floor space will be 3 991 m .The proposed works will involve demolitions, alterations and extensions to the existing Windle Building, the removal of some existing car parking spaces and the provision of new hard and soft landscaping and lighting.
View the procurement » Mentioned suppliers:JJ Rhatigan & Co
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua