2016-05-18100-Bed Community Nursing Unit at Tymon North Tallaght, Dublin 24 (Health Service Executive (HSE))
The development will consist of the construction of a new two/three storey
building (approx 6 500 sqm) and associated site works, to provide a new 100 bed
Community Nursing Unit and Day Care Centre including en-suite bedrooms, day
rooms, dining rooms, activity and therapy rooms, staff support rooms, central
kitchen, new vehicular and pedestrian site entrance off Tymon North Road,
perimeter fencing, car park and associated landscaping works.
View the procurement »
2016-05-16Maintenance of Fuel Systems Iarnród Éireann (Iarnrod Eireann-Irish Rail)
The fuel storage and fuel delivery systems are located at a number of railway running maintenance facilities nationwide primarily used to fuel diesel powered rolling stock as part of day to day regular operations. The contract will also include the maintenance of 2 bulk storage Seveso facilities, one in Dublin Port and the other in Inchicore.
Duties will include the provision of preventative maintenance, undertaking of safety checks, 24/7 emergency breakdown cover, installation improvement projects and …
View the procurement » Mentioned suppliers:Pumps and Fuel Installations (NI)Scott Engineering
2016-05-12Dunboyne Junior + Senior National Schools (Dunboyne Junior + Senior National School)
Expressions of Interest are invited from suitably qualified building contractors who wish to be considered for the refurbishment and minor alteration to the layout of the existing Junior school building and the construction of a 2 stories extension (c.2 120m). Demolition of the existing (c.2 125m) and construction of the new Senior School Building (c.4 450m). The removal of (c.1 088m) of existing prefabricated structures and construction of external stores, new vehicular and pedestrian entrance gates, 6 …
View the procurement »
2016-05-11100 Bed Nursing Facility and Catering Department (Peamount Healthcare)
Construction of a new 2 storey healthcare unit comprising residential accommodation for 100 people, ancillary healthcare services, catering, pharmacy and staff facilities, associated site works, access road, landscaping, an internal link to the existing rehabilitation unit, together with redistribution of existing car parking spaces and the demolition of a disused building. The proposed works are located on the site of Protected Structures.
View the procurement »
2016-05-062016 Davis College Major Extension (Cork Education and Training Board)
The project consists of the construction of a new standalone 5 000m(approx.) Post Primary School building to the rear of the existing Davis College, Summerhill, Mallow, Co. Cork, Ireland. The building will comprise of classrooms, laboratories, social areas, administration rooms, Special Education Needs Unit and Associated Ancillary Accommodation. The project will also include site works including car parking and landscaping, etc. and the construction of new external stores. The project will also include …
View the procurement »
2016-04-22GWM3145 National Painting Framework Agreement (ESB)
ESB Generation and Wholesale Markets (Generation) is a business unit of Electricity Supply Board, the state owned electricity utility in Republic of Ireland. Generation has a requirement for the provision of Scaffolding Services to its generating stations (see www.esb.ie for Power Stations). This portfolio of stations will also include its generating station at Pigeon House Road, Ringsend, Dublin 4, owned and operated by ESBs subsidiary companies Synergen Power Ltd. and Utility O&M Services Ltd. …
View the procurement »
2016-04-16GWM4576 Boiler Tube Replacement Money-point Framework (ESB)
This Framework is for the design, manufacture, delivery and installation of Boiler components on the 3 305-MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Money-point Generating Station — works for each unit are likely to be tendered individually. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the 3 units will take place during outages in 2017, 2018 and 2019. Outage dates may change …
View the procurement »
2016-04-15Landscaping Services for Kildare County Council (Kildare County Council)
Grass cutting, herbicide application, hedge and shrub pruning, planting, paving, litter picking, grass reinstatement works, watering.
Traffic Management were required to facilitate landscaping and landscaping maintenance.
To fulfil the role of Project Supervisor Construction Stage (PSCS).
View the procurement »
2016-04-06GWM2353 National Scaffolding Framework Agreement (ESB)
ESB Generation and Wholesale Markets (Generation) is a business unit of Electricity Supply Board, the state owned electricity utility in Republic of Ireland. Generation has a requirement for the provision of Scaffolding Services to its generating stations (see www.esb.ie for Power Stations). This portfolio of stations will also include its generating station at Pigeon House Road, Ringsend, Dublin 4, owned and operated by ESBs subsidiary companies Synergen Power Ltd. and Utility O&M Services Ltd. …
View the procurement »
2016-04-06Framework for EPC services for ground mounted solar farms (Electricity Supply Board (ESB ))
ESB plans to develop circa 20 to 30 ground mounted solar farms (up to circa 100 MW — with the potential that this may extend to 500MW — in aggregate) in the period from Q2, 2016 to Q4, 2021. The location of these proposed solar farms will be in both the Republic of Ireland and in Northern Ireland.
The potential scale of these individual solar developments is that they are expected to typically range between 5 MW and 20 MW. There is the potential that certain individual developments will be larger.
ESB is …
View the procurement »
2016-04-052016 Cork Training Centre — Mechanical Maintenance Services (Cork Education and Training Board)
The Mechanical Maintenance Service contract is required to provide a full maintenance service and will cover all aspects of Mechanical maintenance as defined herein. 2.10.1. The provision of the required services is to be based on a 51 week provision for all sites. 2.10.2. The Training Centre expects the successful Contractor to provide performance monitoring information that proves its delivery of a high quality service. 2.10.3. The Contractor will be expected to work in partnership with the Training …
View the procurement » Mentioned suppliers:Mechancial and Building Serives
2016-04-04Framework Agreement for Works (Mater Misericordiae University Hospital Ltd)
The Mater Misericordiae University Hospital (MMUH) is acting behalf of the hospitals that make up the Ireland East Hospital Group (IEHG) with respect to establishing a framework of 6 contractors who can be called-off to complete works contracts with a value in excess of 1 000 000 EUR.
View the procurement »
2016-04-01New Block — Replacement in-patient beds and Palliative Care Unit (Health Service Executive (HSE))
The construction of a new Palliative Care Unit & Ward Block at University Hospital
Waterford which is an operational acute hospital. The proposed works of
approximately 7 900 m2 comprise of Palliative Care in Patient accommodation on
lower ground floor, Palliative Care Day Care Services at ground floor, 3 floors
of general single en-suite single rooms and a roof level plant room enclosure.
View the procurement »
2016-03-31N52 Cloghan to Billistown Phase 1 — Cloghan to Turin Realignment (Westmeath County Council)
N52 Cloghan to Billistown Phase 1 — Cloghan to Turin Realignment is located in
the townlands of Mountrobert, Cloghanumera, Killynan (Cooke) and Killynan
(Pratt) and is 7km northeast of Mullingar and 8km southwest of Delvin. The
project comprises the construction of 3.64km of Type 1 Single Carriageway (S2)
and the following associated Works:
(1) Two at grade ghost island junctions and simple junctions
(2) Site Clearance and Earthworks
(3) Realignment and tie in to the existing N52 and local roads.
(4) …
View the procurement » Mentioned suppliers:Fox Building & Engineering Ltd
2016-03-30TG4 invites tender submissions from suitably qualified applicants to provide roof replacement and associated... (TG4)
The project entails the preparation of the existing roof including the stripping off of the present surface, cleaning, surface preparation and priming, etc. and the laying of a new roof system to provide a fully weatherproofed roof covering.
The Employers, TG4 and their Employer's Representative are particularly interested in working with an experienced, proactive and practical Contractor and his site staff, all capable of working together within the Contract Sum and multi-phased project time-scales …
View the procurement » Mentioned suppliers:Deane Roofing and Cladding Ltd
2016-03-24Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package (Curragh Racecourse Ltd)
Contract Phase 1: Enabling Works
The enabling works contract involves the demolition of the existing east and west
grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of
hard landscaping, sections of perimeter walls, removal and disposal of asbestos,
termination and diversion of services, installation of new services such as surface
water and wastewater infrastructure within the main site, felling of a select
number of trees and tree protection.
A specialist requirement under the …
View the procurement » Mentioned suppliers:Murphy International Ltd
2016-03-18Upper Liffey Valley Regional Sewerage Scheme Contract 2A Networks (Ervia)
Irish Water plan to undertake the construction of a new sewerage collection
network from Kilbelin in Newbridge to Osberstown WwTP including gravity
sewers, 3 No new pumping stations, 3 No new storm tanks and rising mains. The
project will convey flows from Newbridge, reducing storm water overflows to the
River Liffey, to Osberstown WwTP.
View the procurement » Mentioned suppliers:Roadbridge Ltd
2016-03-15Single-Party Framework Agreement for the Refurbishment and New Build of the Stable Yard (Curragh Racecourse Ltd)
Contract Phase 2 — Stable Yard: The overall works requirements are split into two
separate contracts.
Contract 1 involves the refurbishment of 76 existing stables. The extent of the
refurbishment works is dependent on the condition of the individual stable.
Applicants should note that there will be limited conservation works to a small
number of stables marked for refurbishment and this will require close
consultation with the project Conservation Architect. It is envisaged that Contract
1 will commence …
View the procurement » Mentioned suppliers:Purcell Construction Ltd
2016-03-07Inspection of Oil Jetty and report generation (National Oil Reserves Agency)
The jetty is
currently used to
off load / supply
oil product to a
tank farm. At
present the tankfarm
is only partially in
use to provide an
emergency supply of
Diesel for the
adjacent ESB Power
station which is
supplied from 2 No.
Tanks (D1 and D2).
To achieve a fully
functioning facility
for the off load of
distillate products
at the Jetty, it
will be necessary to
complete a
comprehensive
inspection of the
Jetty.
The inspection will
include the
provision of
recommendations, and
subsequent scopes …
View the procurement »
2016-03-03Framework Agreement for Network Wide Roofing and Canopy Repair Works at Railway Stations and associated Buildings... (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of suitably qualified companies to a long term framework agreement for roofing and canopy repair works at railway stations and associated buildings throughout the Iarnród Éireann-Irish Rail network (the ‘Framework’).
The extent and details of these works will vary from location to location. Project works shall be awarded in separate packages based on the ‘Call Off’ set out in the Framework Agreement.
It is anticipated that the value of Individual …
View the procurement »
2016-03-02Provision of lift and escalator maintenance and repair services 2016 — 2019 (Iarnrod Eireann-Irish Rail)
Iarnród Éireann's wish to enter into a single party 3-year framework
agreement for the supply of lift and escalator maintenance and repair services at
various locations throughout the railway network.
Refer to Regional Map 0.0-G00-001- Quantities of Lift and Escalator assets are
follows:
East Region — 48 Lifts — 3 Escalators — 2 Wheel chair lifts;
South Region — 56 Lifts — 10 Escalators — 5 Wheel chair lifts;
West Region — 26 Lifts — 2 Escalators — 1 Wheel chair lift.
Iarnród Éireann's existing contract …
View the procurement » Mentioned suppliers:Orona Midwestern Lifts Ltd
2016-02-26Student Hub Re-development (Dublin City University ( DCU ))
As part of a Campus Development Plan, Dublin City University is progressing plans to construct 2 new facilities on Campus (Stokes Building Extension and Student Hub Re-development). This procurement process is for the construction of the Student Hub Building Re-development. The project has an indicative value of approx. 13 000 000 EUR.
View the procurement » Mentioned suppliers:Duggan Brothers Contractors Ltd