Procurements: Construction work (page 54)

2016-10-14   Construction of 31 apartments in St. John's Lane, Dublin 8 — Glazing Specialist (Focus Housing Association)
New 6 floor over basement 31 unit residential development at Johns Lane West, Dublin 8. The residential development will have a BER A3 rating, approximate gross internal floor area of 2 700 m and GSA of approximately 4 300 m The development will consist of 31 apartments and include for the loose furniture fittings and equipment fit-out of these apartments. Apartments will be a mix of 1, 2 and 3 bed units. View the procurement »
2016-10-14   Construction of 31 apartments in St. John's Lane, Dublin 8 — Cladding Specialist (Focus Housing Association)
New 6 floor over basement 31 unit residential development at Johns Lane West, Dublin 8. The residential development will have a BER A3 rating, approximate gross internal floor area of 2 700 m and GSA of approximately 4 300 m View the procurement »
2016-10-14   Construction of 31 apartments in St. John's Lane, Dublin 8 (Focus Housing Association)
New 6 floor over basement 31 unit residential development at Johns Lane West, Dublin 8. The residential development will have a BER A3 rating, approximate gross internal floor area of 2 700 m and GSA of approximately 4 300 m View the procurement »
2016-10-14   Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Mechanical Works... (Curragh Racecourse Ltd)
The mechanical services at the new Curragh Racecourse development comprise of the following systems; i) Incoming mains natural gas, ii) Incoming mains water, iii) Mains/Cold and Hot Water Storage and Distribution, iv) Low temperature Hot Water Heating Generation and Distribution, v) Chilled Water (CHW) Cooling Generation and Distribution, vi) Multiple ventilation systems including Kitchen Supply & Extract, Toilet Ventilation and comfort cooling to occupied spaces, comprising of AHU and distribution … View the procurement »
Mentioned suppliers: Kirby Group Engineering
2016-10-14   Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Lifts & Escalators... (Curragh Racecourse Ltd)
The vertical transportation services at the new Curragh Racecourse development comprise of the following; i) Passenger Lift Services — 1 No. VIP 1 000 kg 13-person — 1 No. Public lift 1 000 kg 13-person. — 1 No. Public passenger lift 1 275 kg 17 person ii) Goods Lift Services — 1 No. dirty goods lift 1 400 kg — 1 No. clean goods lift 5 000 kg. Five escalators shall also be provided, 2 No. serving level 00 and level 01, 2 No. serving level 01 and level 02 and 1 No. serving level 02 and 03. Note the … View the procurement »
Mentioned suppliers: Kone Ireland Limited
2016-10-11   Framework Agreement for Demolition Works Contracts (Limerick City and County Council)
Limerick City and County Council is seeking expressions of interest from Demolition Contractors for inclusion on a framework agreement for demolition works contracts. The works typically involves demolition of both individual houses and blocks of houses. Associated works may include, but is not limited to, asbestos removal, isolation of dwellings to be demolished from adjoining properties, temporary weathering of adjoining gables and new gable wall construction, as well as site perimeter works such as … View the procurement »
2016-10-07   ACC20161016 wildlife bird control (Air Corps Contracts Section)
ACC20161016 wildlife bird control. View the procurement »
Mentioned suppliers: Bird Control Ireland
2016-10-07   Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design and … View the procurement »
Mentioned suppliers: Roadbridge
2016-10-04   Archaeological Framework (daa plc)
Please see attached RFI. View the procurement »
2016-10-02   Regeneration works at St Mary's Mansions, Dublin 1 to provide 80 No new and refurbished apartments (Cluid Housing Association)
The proposed works include the refurbishment and deep retrofit of the existing structure and the addition of 2 new floors of accommodation over the existing building, to provide a total of 80 No housing units, to meet current apartment area standards. The total area of the completed development is c. 8550 sq. m. View the procurement »
2016-09-30   New Acute Mental Health Unit at Sligo University Hospital (Health Service Executive (HSE))
The works consist of the construction of a new part single storey and part 2 story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3 500 sqm. Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure … View the procurement »
2016-09-30   IDA Ireland Athenry Strategic Site Infrastructure Works — Road Works Phase 2 (IDA Ireland)
Construction of a new road, including two bridges. One of the bridges will cross a railway. The site is in the townland of Ballygarraun, Athenry, Co. Galway. The works are a continuation of the Phase 1 roadworks that were completed in 2010. Phase 1 links the M6 Motorway and regional Road R348. Phase 2 will extend northwards from the R348 and will include the following, along with other works: — Single carriageway over 600m in length; — Footway / Cycleway of varying widths and length; — A roundabout; — A … View the procurement »
Mentioned suppliers: Wills Bros Ltd
2016-09-28   Proposals for developing social residential schemes in Ireland (Cluid Housing Association)
Clúid hereby invites tenders from experienced housing developers to submit proposals for developing social residential schemes within the proximity of public services and amenities in various locations countrywide as listed. View the procurement »
2016-09-26   A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off. The framework is divided into 2 Lots. Lot 1: Works associated with wastewater treatment, collection systems and ancillaries. Lot 2: Civil engineering works and networks … View the procurement »
2016-09-22   A Multi — Supplier Framework For the Provision of Sewer Network Survey and Associated Services To Irish Water (Irish Water)
Irish Water wishes to appoint a number of Contractors to assist in carrying out surveys of a number of sewer networks. A key objective of the programme is to support the provision of efficient water services capital investment. View the procurement »
2016-09-21   The Irish Blood Transfusion Service tests approximately 145,000 donations per annum. One of the criteria required... (Irish Blood Transfusion Service)
IBTS policy dictates that approximately 9 months of frozen archive material is retained on-site (average temperature of -30̊C; range = -20̊C to -40̊C) before shipping to an off-site facility for secure storage under temperature controlled conditions. All IBTS archive material will have undergone routine viral screening in effect at the time of donation. Certain IBTS archive samples will be classified as infectious biological materials and all relevant archive boxes/containers containing such infectious … View the procurement »
Mentioned suppliers: Thermo Electron Corporation T/A Fisher BioServices
2016-09-20   N76 Callan Road Realignment (Kilkenny County Council)
The work comprises construction of a 4.4 km road improvement scheme, consisting of 2.3 km of new and/or realigned road, 2.08 km of online road improvements and all associated works including the provision of new drainage. It also includes the provision of approximately 2.8 km of facilities for vulnerable road users (cyclists & pedestrians) with new public lighting. The works include associated site clearance, drainage works and earthworks, farm access roads, fencing, pavement works, accommodation works, … View the procurement »
Mentioned suppliers: SIAC Construction Ltd
2016-09-15   Framework Agreement for Civil Engineering Small Works (Kildare County Council)
The description of the works as detailed in the attached Information Memorandum (Section 1 Introduction). Note: to register your interest in this notice and obtain any additional information please visit the eTenders. View the procurement »
2016-09-15   Colaiste Iosaef Extension and Associated Works (Limerick and Clare Education and Training Board)
Stand Alone Extension of 3 391 m² over three floors, PE Hall and associated site works at existing secondary school and grounds with connection link back into existing school building (Protected Structure). The works are within the grounds of a protected structure. View the procurement »
Mentioned suppliers: Conack Construction Limited
2016-09-10   Fibre Maintenance and Installation (Ervia)
It is envisaged that these services will be included in the single party framework, but not be limited to, the following: — Cable installation; — Cable removal; — Fibre splicing and Terminating; — Fibre testing; — Splice joint installation and associated works; — Splice joint repair; — Duct and sub-duct supply, installation, proving and testing; — Provision of photographic records both prior to and post each day's activity on site; — Emergency maintenance works; — Standby and Emergency Cover; — Provision … View the procurement »
Mentioned suppliers: Total Splicing Solutions Limited
2016-09-05   Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly … View the procurement »
2016-09-02   Establishment of Small Works Construction Framework (Irish Prison Service)
2.3 The purpose of this Competition is to conclude frameworks (the “Frameworks) for each geographical region for the execution of construction of works within the Prisons Estate as more particularly described hereunder at Part 5 of this Establishment Document (the “Works”). The 5 highest ranking Tenderers shall each be awarded a place on the Framework for the Lot applied for and invited to tender for works between 6 000 EUR and 500 000 EUR (ex VAT) in value. Tenderers can compete for a maximum of 2 Lots. … View the procurement »
2016-08-31   Provision of Telecommunication Services (An Post)
An Post is seeking to enter into a Single Party Framework Agreement for each of the following Lot's for a period of 3 (three) years with an option to extend for a period up to a further 2 (two) years. Lot 1: Provision of Fixed Voice Services; Lot 2: Provision of Fixed and Wireless WAN Data Services; Lot 3: Provision of Data Centre Metro and Mail Centres Data Services; Lot 4: Provision of Mobile Data and Voice for Postal Operatives; Lot 5: Maintenance and Support of Cabling Infrastructure. The tender will … View the procurement »
Mentioned suppliers: Eircom Power Communications Ltd Vodafone Ireland
2016-08-26   Multi Supplier Framework Agreement for the Provision of Rapid Delivery Housing (The Office of Government Procurement)
The Minister for Public Expenditure and Reform is issuing these tender documents as a central purchasing body for use by the Framework Clients (defined below). The Contracting Authority invites tenders from economic operators (‘Tenderers’) for appointment to a national multi-party framework agreement for the provision of rapid delivery housing projects (the ‘Framework Agreement’). The potential demand for this Framework is in the order of 1,700 rapid-delivery houses. The purpose of this competition is to … View the procurement »
Mentioned suppliers: ABM Construction Andrews Construction Limited Donaghmore Construction Limited Glenman Corporation Limited JJ Rhatigan & Company John Sisk & Son (Holdings) Limited Manley Construction Limited MEIC Limited Mythen Construction Limited P.J. Carey (Contractors) Limited Sammon Contracting Ireland Limited Western Building Systems Limited
2016-08-25   Tender for the maintenance of Public Lighting in Counties Longford and Westmeath (Longford County Council)
Tender for the maintenance of Public Lighting in Counties Longford and Westmeath. Contracts will be awarded separately for both counties. View the procurement »
2016-08-18   Skibbereen Regional Water Supply Scheme (Irish Water)
Irish water is undertaking the amalgamation of a number of water supply schemes formerly known as Schull WSS, Leap/Baltimore WSS Phase 2, Drimoleague WSS and Skibbereen WSS Stage 4. The facilitation of this amalgamation requires the construction of Water Treatment Plant upgrades, increased storage in key areas of the network, network capacity upgrades and mains rehabilitation. View the procurement »
Mentioned suppliers: Electrical and Pump Services Ltd
2016-08-12   Drainage Repairs Moneypoint and Aghada Generating Stations (Electricity Supply Board ( ESB ))
ESB invites expressions of interest for the following: Repairs to storm and foul water drainage infrastructure, with a range of pipe repairs based on CCTV findings including patching, lateral cuts, relining, excavation repairs and manhole sealing. Following repair work, hydrostatic pressure testing to EN1610 is to be carried out on the repaired infrastructure. Location of services Moneypoint Power Station, Kilrush Co. Clare and may also include some work in Aghada Power Station, Co. Cork. View the procurement »
2016-08-12   Shannon Lock Gate Supply Tender 2016 (Waterways Ireland)
Tender for the manufacture and supply of lock gates for the replacement of the upper and lower lock gates at Rooskey, County Leitrim, and the lower gates at Victoria Lock, Banagher, County Offaly. View the procurement »
Mentioned suppliers: Wijma Kampen B.V.
2016-08-12   2016 Delineation Programme Framework Agreement (Transport Infrastructure Ireland (TII))
The provision of road markings and ancillary works on single, dual carriageway and motorway sections of the national road network as well as delineation asset surveys, over a 36 month period or such time as may be determined by the Contracting Authority in accordance with the provisions of the Framework Agreement. View the procurement »
Mentioned suppliers: Bridgepoint Roadmarking Ltd Highway Markings Ltd Kelly Bros.(Roadline) Ltd Northern Road Markings Ltd Road Maintenance Services Ltd. Road Safety Contracts Ltd Shannon Roadmarking Ltd Tim Doody & Co. Ltd
2016-08-10   New Student Centre Development, University of Limerick (University of Limerick)
Plassey Campus Developments Ltd (the ‘Authority’) wish to appoint a design team for a New Student Centre Development. The following design team services are required; — Lot 1: Architect including PSDP, Fire Safety Design, Façade Design and Acoustics — Lot 2: Project Manager — Lot 3: Civil / Structural Engineer — Lot 4: Mechanical & Electrical Engineer — Lot 5: Quantity Surveyor — Lot 6: Landscape Architect Further information regarding this competition can be found in the Project Information Memorandum … View the procurement »
Mentioned suppliers: Brady Shipman Martin Carr Cotter Naessens Architects Don O'Malley & Partners Kerin Contract Management Mulcahy McDonagh & Partners Punch Consulting Engineers
2016-08-10   Sports Pitches Development, University of Limerick (University of Limerick)
The University of Limerick now wish to appoint a design team for the Sports Pitches Development. The following design team services are required; — Lot 1: Civil / Structural Engineer including Sports Pitch Specialist and PSDP — Lot 2: Project Manager — Lot 3: Mechanical and Electrical Engineer — Lot 4: Quantity Surveyor — Lot 5: Landscape Architect Further information regarding this competition can be found in the Project Information Memorandum (also available to download from www.etenders.gov.ie or … View the procurement »
Mentioned suppliers: Brady Shipman Martin Don O'Malley and Partners Kerin Contract Management Rogerson Reddan and Associates Ltd Tobin Consulting Engineers
2016-08-10   Framework Agreement for Provision of Geological Services to Coillte Land Solutions (Coillte Teoranta)
Coillte invites expressions of interest from suitably qualified candidates for provision of Geological services as detailed in the summary document attached to this notice. This is a framework agreement with 4 lots. View the procurement »
2016-08-09   Expression of Interest for Provision for the Maintenance of Fire alarms, Emergency Lighting, Fire Smoke dampers,... (St James's Hospital)
Expression of Interest for Provision for the Maintenance of Fire alarms, Emergency Lighting, Fire Smoke dampers, Fire extinguishers and Fire Safety training. View the procurement »
2016-08-09   Provision of Tellus Sample Preparation of Geochemical Soil Samples by Drying, Disaggregation and Sieving Followed by... (Education Procurement Service (EPS))
Request for Tenders to establish a Single Supplier Framework contract for the Provision of Tellus Sample Preparation of Geochemical Soil Samples by Drying, Disaggregation and Sieving Followed by Further Preparation by Agate Milling to Fine Powder Pulps for the Minister of Communications, Climate Action and Environment as represented by the Geological Survey of Ireland (GSI). View the procurement »
Mentioned suppliers: British Geological Survey
2016-08-09   Single Supplier Framework Contract for the provision of Tellus Sample Preparation of Geochemical Fine Stream... (Education Procurement Service (EPS))
Single Supplier Framework Contract for the provision of Tellus Sample Preparation of Geochemical Fine Stream Sediment Samples by Agate Milling to Fine Powder Pulps for the Minister of Communications, Climate Action and Environment as represented by the GSI. A regional geochemical survey of soils, stream sediments and stream waters in the border region of Ireland was recently completed by the Geological Survey of Ireland (GSI). Further stream sediment sampling at approximately 10 000 sites will take place … View the procurement »
Mentioned suppliers: British Geological Survey
2016-08-06   Multi-Contractor Framework Agreement for Timber Cutting and Associated Works at or near Overhead Lines in the... (Electricity Supply Board (ESB))
It is proposed that the Multi-Contractor Framework Agreement scope of works will include but will not be limited to (non-exhaustive list): — Remove timber related safety hazards which may present a danger to members of the public or to ESB staff; — Prevent physical damage to Overhead Network. It comprises planned timber cutting and associated works under the following headings: — 38kV: 3 year cycle; — 10/20kV: Rural Network, 3 year cycle; — Low Voltage: Rural Network, 6 year cycle; — 10/20kV: Urban … View the procurement »
Mentioned suppliers: 36 contractors awarded — details...
2016-08-05   Procurement of Works Contractor for UCC Student Hub at University College Cork (University College Cork (UCC))
The development will consist of the construction of a 6 storey Student Hub Building within the university campus adjoining College Road and Gaol Walk, Cork. The building will be used to provide student and administrative services and flexible learning spaces. The gross floor space will be 3 991 m .The proposed works will involve demolitions, alterations and extensions to the existing Windle Building, the removal of some existing car parking spaces and the provision of new hard and soft landscaping and lighting. View the procurement »
Mentioned suppliers: JJ Rhatigan & Co
2016-08-03   Single supplier framework contract for the Provision of Tellus Multi-element Analyses of Soil and Stream Sediment... (Education Procurement Service (EPS))
The Education Procurement Service, (EPS), on behalf of The Minister for Communications, Climate Action & Environment as represented by the Geological Survey of Ireland (GSI) invites responses (‘Tenders’) to this Request for Tenders (‘RFT’) from economic operators (‘Tenderers’) for the provision of the services as described in Appendix 1 to this RFT, ‘Requirements and Specifications’, (‘the Services’). The Geological Survey of Ireland is the contracting authority for this public procurement competition … View the procurement »
Mentioned suppliers: Panalytical Ltd
2016-07-27   Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including: — Foxford; — Charlestown; — Killala. The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after … View the procurement »
Mentioned suppliers: Glan Agua
2016-07-26   Construction of 45 New Housing Units (35 Houses and 10 apartments) and associated site-works (Cluid Housing Association)
Construction of 45 Housing Units (35 Houses and 10 Apartments) and associated site-works and services with an approximate Construction Value 6 500 000 EUR excluding VAT. View the procurement »
2016-07-25   Howth Balbriggan Kingstown Malahide Water Supply Scheme (Irish Water)
This contract is for the design and construction of an upgrade to the existing water supply network in Howth, Balbriggan, Malahide and between Ballycoolen and Kingstown in Fingal. The works included in this contract include the construction of large diameter water mains, a pumping station, reservoir and ancillary controls and telemetry. The above is the anticipated scope of the contract but 1 or more of the above schemes may not be included in the tender stage of this competition, and thus may not be … View the procurement »
Mentioned suppliers: John Cradock Ltd/TES NI JV
2016-07-20   16/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design Build (‘DB’). Contract with a 24 month Operation Service period with a possibility to extend to 48 months. Further … View the procurement »
Mentioned suppliers: Ward and Burke Group Ltd
2016-07-20   Electrical Maintenance Services (Institute of Technology Tallaght)
The scope of the works is to provide: Planned preventative maintenance of emergency lighting, medium voltage switchgear, low voltage switchgear and distribution boards. Reactive maintenance of all other electrical systems on a time and material basis, together with new electrical installation works, based on the tendered ‘basket’ of hours submitted with this tender. View the procurement »
2016-07-20   Irish language and cultural centre in Tallaght Village (Gaelphobal Thamhlachta)
Gaelphobal Thamhlachta have purchased a building in Tallaght Village which we intend to develop as an Irish language and cultural centre for the area. This project will entail the demolition of a 15 sq m single storey area at the rear of the existing building and the construction of a new single — storey extension on the same footprint. It will also entail the development of the building from a commercial office and garage to a cultural centre, café and bookshop. Planning permission has been recently … View the procurement »
2016-07-18   TII046 (Transport Infrastructure Ireland (TII))
TII have a requirement to modify the existing tram maintenance depot at Sandyford in order to accommodate longer trams. It is necessary to extend the existing depot workshop and administration section of the building. TII requires a contractor with expertise in the construction of industrial building works and expertise in the procurement and management of a range of particular subcontractors, including roofing and cladding, curtain walling and glazing, building services (mechanical and electrical), … View the procurement »
Mentioned suppliers: Bam Civil Limited
2016-07-18   St. Finians Community College Renovation and Extension (Dublin and Dun Laoghaire Education and Training Board)
— Construction of Standalone extension to the existing school (3 996 m²); — Renovation and Extension to the existing School GP Hall (139 m²); — Renovations to existing school specialist classrooms and replacement of entire flat roof (5 223 m²); — Renovations to existing PE Hall (349 m²). View the procurement »
2016-07-15   Rebuild and Extension of Radiology Department at Letterkenny University Hospital (Health Service Executive (HSE))
Demolition and adjustment of existing sub-standard and flood damaged accommodation. Construction of new buildings and re-planning existing buildings to provide and extended, re-planned and refurbished Radiology Department. View the procurement »