2015-08-12   Electrical Services Installation for the new Confucius Institute of Ireland Building located on the campus at UCD, Belfield (University College Dublin ( UCD ))
UCD wishes to appoint a competent Electrical Services Contractor for the Electrical Services Installations for the new UCD Confucius Institute of Ireland. Works include the supply, installation, testing and commissioning of the Electrical Services for a new 3 storey building circa 2 000 m². View the procurement »
Mentioned suppliers: CJK Engineering
2015-07-14   Louth Water Supply Schemes — Staleen & Cavanhill Upgrade Water Treatment Plants Upgrade (Ervia)
Refurbishment and upgrade of the existing Staleen Water Treatment Plant to ensure a minimum WTP output of 31,500m3/d is delivered into supply. Refurbishment and upgrade of the existing Cavanhill Water Treatment Plant to ensure a minimum WTP output of 27,300m3/d is delivered into supply. Operation of the plants for a minimum of 1 year with an option to extend by 2 further years. View the procurement »
Mentioned suppliers: AECOM Design Build Ireland Ltd
2015-06-29   2015 Cork Training Centre — Electrical Maintenance Services (Cork Education and Training Board)
The Electrical Maintenance Service contract is required to provide a full maintenance service and will cover all aspects of electrical maintenance as defined herein. 2.10.1 The provision of the required services is to be based on a 51 week provision for all sites. 2.10.2 The Training Centre expects the successful Contractor to provide performance monitoring information that proves its delivery of a high quality service. 2.10.3 The Contractor will be expected to work in partnership with the Training … View the procurement »
Mentioned suppliers: O‘Keeffe Electrical
2015-06-26   Supply of I.T. Infrastructure Services (Dublin Airport Authority plc (DAA))
The requirement for this RFI is to pre-qualify a panel of potential suppliers to tender for the supply of the following I.T infrastructure services and products throughout the Dublin Airport Campus in one complete package. 1. Fault resolution/maintenance on the daa owned I.T telecommunications cable infrastructure network. 2. Installation of data/UTP points. 3. Installation of copper patching. 4. Installation of fibre patching. 5. Installation of copper and fibre backbone cable. View the procurement »
2015-06-15   National Forensic Mental Health Service Hospital @ St. Ita‘s Hospital Campus, Portrane, Co. Dublin (Health Service Executive (HSE))
Main Building Works for National Forensic Mental Health Service Hospital @ St. Ita‘s Hospital Campus, Portrane, Co. Dublin. View the procurement »
2015-06-04   Integrated design team services (excluding project management and quantity surveying services) (Royal Irish Academy of Music)
Integrated design team services to include: Architectural, conservation, interior design, planning, assigned certifier, acoustic engineering, civil and structural engineering, mechanical and electrical engineering, fire safety consultant, project supervisor design process (psdp), project supervisor construction stage (pscs), signposting services. For the avoidance of any doubt project management and quantity surveying services are not included in this competition. View the procurement »
Mentioned suppliers: TODD Architects Limited
2015-05-27   120 bed development for the National Rehabilitation Hospital at Rochestown Avenue, Dunlaoghaire, Co Dublin (National Rehabilitation Hospital)
120 bed development for the National Rehabilitation Hospital at Rochestown Avenue, Dunlaoghaire, Co Dublin. View the procurement »
2015-05-26   Framework Agreement Small Capital Works Project Contractor to the University of Limerick (University of Limerick)
University of Limerick wish to establish framework panels of contractors for undertaking Small Capital Works Projects on the University Campus. The following framework panels will be established: — Lot 1: Main Contractors; — Lot 2: Mechanical Contractors; — Lot 3: Electrical Contractors; — Lot 4: Mechanical & Electrical Contractors. View the procurement »
2015-04-28   Belmullet DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the construction of a new wastewater treatment plant (2,500 PE) and new marine sea outfall together with modifications and upgrading of the existing wastewater collection system including the construction of two new pumping stations and associated rising mains. Contract to include for the operation and maintenance of the the works for a period of 2 years post construction. View the procurement »
2015-04-27   Maintenance Contracts 2016-2018 (Shannon Commercial Properties)
Lot 1 - General Services Contract; Lot 2 - Building Maintenance Contract; Lot 3 - Landscaping Contract. View the procurement »
Mentioned suppliers: Iss Facility Services K-Mac Redlough Landscapes Ltd
2015-04-27   Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionnaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2015-04-22   15/027 — Portrane, Donabate, Rush and Lusk Waste Water Treatment Scheme — Rush Waste Water Collection Network (Bord Gáis Éireann/Ervia)
Irish Water is currently advancing the Portrane, Donabate, Rush and Lusk Waste Water Treatment Scheme (PDRL WWTS) comprising a number of different contracts to upgrade various aspects of the collection network and waste water treatment facilities in the Fingal area. This scheme involves the elements in the area of Rush and its environs. It comprises the upgrade to the waste water collection network and includes the construction of new pumping and rising mains. View the procurement »
Mentioned suppliers: Jons Civil Engineering Company Limited
2015-04-22   Tubbercurry, Grange, Strandhill and Ballinafad Wastewater Treatment Plant Bundle DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water plan to undertake the upgrade of the existing Tubbercurry, Grange, Strandhill and Ballinafad wastewater treatment plants (WwTP) and the Strandhill Pumping Station. Other works include the construction of a new combined sewer overflow (CSO) diversion and outfall discharge pipelines in Tubbercurry and associated ancillary works. There will also be a 2 year operational period and it is intended that the works will be implemented under a Design, Build and Operate (“DBO”) Contract. View the procurement »
Mentioned suppliers: Coffey Northumbrian Ltd
2015-04-10   Installation of a new wireless control thermostat system for the European Commission (European Commission)
Contract for the installation of a new wireless control thermostat system for the European Commission at its premises at Grange, Dunsany, County Meath. View the procurement »
2015-04-10   15/026 — Sligo and Environs Water Supply Scheme — Foxes Den/Cairns Hill Water Treatment Plants DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water, on behalf of Ervia, plan to undertake the upgrade of the existing Foxes Den Water Treatment Plant (WTP) and to decommission the existing Cairns Hill WTP together with associated ancillary works as part of the Sligo and Environs Water Supply Scheme — Foxes Den/Cairns Hill Water Treatment Plants DBO Contract. The planned works are necessary to facilitate the efficient supply of water to consumers while also eliminating water quality issues associated with the Cairns Hill WTP. The project will … View the procurement »
2015-01-16   Design and construction of 2 no Radiation Oncology centres at Cork and Galway University Hospitals (Health Service Executive (HSE))
Design and construction of 2 no Radiation Oncology centres. Cork University Hospital (CUH): A new facility of approximately 8 800 square metres (Gross Floor Area) over 3 storeys above ground level, including Bunkers for 7 Linear Accelerators and support accommodation, a Brachytherapy Suite, Shelled Out MRI Suite, 2 no CT Scanners, On-Treatment Support, Technical and Administration support accommodation and associated site works, and University Hospital Galway (UHG): A new facility of approximately 8 000 … View the procurement »
2015-01-05   Airside Electrical Installation Framework (daa plc)
The Contracting Authority proposes to appoint between 4 and 8 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield Electrical construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2015 to 2019 inclusive. View the procurement »
2014-10-29   Dublin City Water Supply Scheme — Ballymore Eustace Water Treatment Plant — Sludge Treatment — M&E Contract for Irish Water (Ervia)
Irish Water is undertaking the provision of a new sludge treatment facility for the Ballymore Eustace Water Treatment Plant, to cater for the increase in capacity of the upgraded water treatment plant. The Ballymore Eustace plant is the largest Water Treatment Plant in Ireland, and requires Works to provide additional sustainable sludge treatment capacity to meet medium and long term water demands. Please refer to the Pre-Qualification Questionnaire for full scope. View the procurement »
2014-10-10   Kerry Central Water Supply Project and North East Roscommon Water Supply Project — DBO Contracts for Irish Water (Bord Gais Eireann / Ervia)
Irish Water is undertaking this project to provide appropriate water treatment for the areas served by the Kerry Central Regional Water Supply Scheme (KCRWSS) and the North East Roscommon Regional Water Supply Scheme (NERRWSS). View the procurement »
2014-06-21   CE/5281/SS - Mechanical Systems and Services (Iarnrod Eireann-Irish Rail)
The primary objective of this contract is to provide support and maintenance to Chief Civil Engineer (CCE) Buildings & Facilities department of Iarnród Éireann for Mechanical Systems and Services currently in use at asset locations throughout the rail network. The list of sub systems shall be categorised as follows: 1) Oil & Gas Boiler Heating Systems 2) Heat Recovery Systems 3) Solar Heating Systems 4) Air Handling Systems 5) Air Conditioning Systems 6) Water Storage & Pumped Systems 7) Hot and Cold … View the procurement »
2014-05-29   Kevin Street Garda Divisional HQ – Phase 2 – Main Contractor Prequalification (Office of Public Works (OPW))
Scope of the proposed work comprises a New Garda Divisional Headquarters (Phase 2) which will be adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace). This project is a 2 phase development, the first phase of which is now complete. This second phase of the works will consist of the construction of a new 6 840 sqm Garda Divisional Headquarters building with a 5 400 sqm double basement. The development consists of a 2-3 storey building … View the procurement »
2014-05-02   LYIT Ref: 02/14 Local Energy Supply Contract for Biomass Fuelled Heat Centre with Local District Heating Distribution (Letterkenny Institute of Technology)
Letterkenny Institute of Technology (LYIT) through the National Energy Services Framework as developed by the Department of Communications, Energy and Natural Resources and the Sustainable Energy Authority of Ireland propose to enter a Local Energy Supply Contract to design, finance, install, commission and operate a wood fuelled Biomass heat centre with district heating distribution to the Main Building, Nursing and CoLab buildings all on the LYIT Campus at Port Rd., Letterkenny Co. Donegal. The … View the procurement »
2014-04-17   Courts Bundle Public Private Partnership (PPP) (National Development Finance Agency)
Following on from the Prior Information Notice ("PIN") (RFT 80008), the National Development Finance Agency, acting for and on behalf of the Department of Justice and Equality (“DJE”) (as Sanctioning Authority ) and the Courts Service (as Sponsoring Agency) intends to procure the Courts Bundle PPP (the Project) to design, build and/or extend and/or refurbish (as outlined in the Project Information Memorandum/Pre-Qualification Questionnaire document attached to the eTender's notice), finance and maintain … View the procurement »
Mentioned suppliers: BAM PPP PGGM Infrastructure Cooperatie UA
2014-03-28   Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-03-27   CE/5218/GM - Mechanical & Electrical Services [Framework Agreement] (Iarnrod Eireann-Irish Rail)
Iarnród Éireann are advertising a call for competition for the establishment of a multi-party framework agreement. This framwework agreement will be split into 3 lots (East Region, South Region, West Region) with each lot containing a provision for Planned Preventative Maintenance Works, Un Planned Asset replacement Works, Planned Preventative Renewal Works (PPR), Provision of Technical & Skilled personal with Transport, associated tools, test equipment and CAD terminals; and Provision of Call Out / … View the procurement »
2014-02-21   Novation for WGB Phase 2 Fit Out - Novation of Mechanical, Electrical & Facade Installation works for UCC Western... (University College Cork (UCC))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical ,Electrical & Facade Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF … View the procurement »
Mentioned suppliers: Gunn Lennon Fabrications Ltd Kiernan Electrical Ireland Ltd. Winthrop Engineering Ltd
2014-02-14   Novation of M & E Installations - Mechanical & Electrical Installations for The ASSERT Centre Project -UCC... (University College Cork (UCC))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical & Electrical Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF Model Form … View the procurement »
Mentioned suppliers: KD Mechanical Ltd Mercury Engineering Ltd
2014-02-05   Department of Education & Skills - Design and Build Contractor Framework for Rapid Build Schools, 2014–2016 (Department of Education & Skills)
The Contracting Authority intends to establish a Design & Build Contractor Framework for the delivery of school projects in rapid developing areas across Ireland. The framework will be established following short listing of candidates and will be based on the results of a first tender competition. This first competition will include the award of one school project. The Contracting Authority is seeking expressions of interest from Design & Build Contractors who have the capability of delivering a minimum … View the procurement »
2013-12-19   Primary Care Centres PPP Contract (National Development Finance Agency (as agent acting on behalf of HSE and Dept. of Health))
The National Development Finance Agency (NDFA), as agent acting on behalf of HSE and Dept. of Health, intends to procure a Public Private Partnership (PPP) within the Primary Care Centres (PCCs) Programme to design, build, finance and provide facility management services to between 10-14 PCCs. The NDFA intends to include provisions within the contract and tender documents relating to the provision of social and/or community benefits, including in particular training and/or employment opportunities for … View the procurement »
2013-12-10   13/113 - The Provision of Major Process and MEICA Works (Incorporating Associated Civil Works) to Irish Water (Bord Gais Eireann)
Irish Water is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Major Process and MEICA Works (Incorporating Associated Civil Works) to support the provision of Water Services (water and wastewater) Capital Investment. It is envisaged that these Major Process and MEICA Works will be carried out in a planned manner where work packages are identified in advance of each call off. The works will be sub-divided into two … View the procurement »
2013-10-31   DIT Campus at Grangegorman PPP - Contract Notice for DIT Campus at Grangegorman Central & East Quads PPP (National Development Finance Agency)
Following on from the Prior Information Notice ('PIN') (RFT 75915), the National Development Finance Agency, acting for and on behalf of the Minister for Education and Skills, intends to procure the Dublin Institute of Technology ('DIT') Campus at Grangegorman Central & East Quads PPP (the 'Project') to design, build, finance and maintain 2 third level education buildings within the proposed DIT campus. It is expected that the Project will have an ex VAT capital value of the order of EUR 200 million in … View the procurement »
Mentioned suppliers: Eriugena Designated Activity Company
2013-10-24   13/101 - Provision of Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to Irish Water (Bord Gais Eireann)
Irish Water wants to establish a multi-supplier framework agreement for the provision of all required works and services associated with Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to support the provision of water services capital investment. It is envisaged that these Minor MEICA Works will be carried out in a planned manner where work packages are identified in advance of each call off. The works will be sub-divided into five separate lots detailed below. Lot 1: … View the procurement »
2013-10-09   Energy Efficient Retro-Fit Works - Framework Agreement for Energy Efficient Retrofit Works to some School Buildings... (Kildare and Wicklow Education and Training Board)
The Kildare and Wicklow Education and Training Board (KWETB) plan to establish a Framework Agreement for Energy Efficiency retrofit works in a number of existing school buildings in the Kildare and Wicklow Areas. View the procurement »
2013-08-29   Server Room Fit out - Open Tender for a complete Server Room Fit Out in the Dublin City Area (FAS - Foras Aiseanna Saothair, Training and Employment Authority)
FÁS plans to vacate its current Baggot Street offices in the coming months. A new location for HO has not yet been identified, but it will be within the central Dublin area. There are currently two server rooms in Baggot Street and these will be merged and relocated to our new premises. Our two server rooms support FÁS in all its business functions. There are currently over 100 offices on our WAN, in addition to the services we provide our own staff – our internal applications are accessed by the DSP, … View the procurement »
2013-08-15   13/086 - A Multi-Supplier Framework for the Provision of Water Services Repair and Maintenance Works to Irish Water (Bord Gais Eireann)
IW is tendering to establish a Multi-Supplier Framework Agreement for the Provision of Water Services Repair and Maintenance in respect of: (1) Civil Engineering Works; (2) Mechanical and Electrical Works; (3) SCADA and Telemetry Works; and (4) Instrumentation, Servicing, Calibration and Certification Works. View the procurement »
2013-07-19   Novation of M and E Installations – Mechanical and Electrical Installations for New Beaufort Maritime and Energy... (University College Cork ( UCC ))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical and Electrical Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF Model Form … View the procurement »
2013-07-18   Childcare Special Care Units – Proposed new HSE Childcare Special Care Residential Units at Portrane, Co. Dublin,... (Health Service Executive (HSE))
Proposed New HSE Childcare Special Care Residential Units at Portrane, Co. Dublin, Castleblayney, Co. Monaghan and Glanmire, Co. Cork. View the procurement »
2013-03-14   2013/03/1 - Framework Agreement for General Maintenance and Small Building Works (The National Maternity Hospital)
Framework Agreement for General Maintenance and Small Building Works. You must expressed you interest via www.etenders.gov.ie. All documents are available for download and submission via www.etenders.gov.ie View the procurement »
2013-02-06   ITT13-003 - Supply of engineering project management support for Marine Institute, Rinville, Oranmore, Co. Galway (Marine Institute)
The Marine Institute, a semi State body, wishes to invite tenders for the supply of Engineering Project Management Support to the Marine Institute, Rinville, Oranmore, Co. Galway. It is anticipated that this will be for a period of up to 2 years, however this may be extended to into a third year if there are delays in the granting of a foreshore licence or other unforeseen delays. View the procurement »
2012-12-18   NDFA DSBP D&B Framework - National Development Finance Agency Devolved Schools Build Programme Design and Build Framework (National Development Finance Agency)
The NDFA is seeking to establish a Framework Agreement of contractors in respect of school projects to be procured and delivered on a design and build basis by the NDFA acting on behalf of the Department of Education and Skills (DoES) - (the 'NDFA Devolved Schools Build Programme' or 'DSBP'. Documents relevant to this competition are set out in the Tender Document Index and attached to this notice. Parties to the Framework Agreement will be chosen by means of this Framework tender competition. View the procurement »
Mentioned suppliers: ABM Construction and Clancy Conctruction... JJ Rhatigan Sammon Contracting Ireland Ltd Stewart - Treacy Brothers Joint Venture Western Building Systems
2012-11-01   LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows: Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick. Lot 2 Call Out Electrical Maintenance Works – LIT Thurles. Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel. The purpose of the first stage is to obtain information from the applicants to determine their suitability … View the procurement »
2012-05-10   Frameworks for mechanical & electrical maintenance services & electrical minor works services (University College Dublin (UCD))
UCD is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three multi-party framework agreements ("the framework agreements") as follows: Lot 1 mechanical maintenance & operational services. Lot 2 electrical maintenance & operational services. Lot 3 electrical minor works services. The purpose of the first stage is to obtain information from the applicants to determine their suitability on the basis of financial capacity, technical … View the procurement »
2012-03-29   Maintenance contracts 2013 - 2015 (Shannon Development Co. Ltd.)
Shannon Development is a regional development company. The brief of Shannon Development is to generate industry, tourism and regional development in the Shannon Region which includes counties Clare, Limerick, North Tipperary, South Offaly and North Kerry. The Company’s extensive property portfolio throughout the region includes approximately 3.7 m sq. ft. of industrial space, 58 business parks/enterprise centres and 29 multi-tenanted buildings. Shannon Development wishes to create three separate … View the procurement »
2011-11-30   Single-party framework agreements for general small works and maintenance services (Galway Mayo Institute of Technology)
Galway-Mayo Institute of Technology (GMIT) is based at five locations in the west of Ireland. Full general information concerning GMIT is available on the Institute’s website: www.gmit.ie. GMIT proposes to engage in a competitive process for the establishment of nine (9) single-operator framework agreements for general small works and maintenance service as follows: — Lot 1: Call Out Electrical Maintenance Works – GMIT Galway, — Lot 2: Call Out Electrical Maintenance Works - GMIT Castlebar, — Lot 3: Call … View the procurement »
Mentioned suppliers: Coffey M&E Services t/a Coffey Water Ltd Joe Mongan Building Contractor Ltd John Griffin & Sons Ltd John Higgins Building Contractor Ltd
2011-10-31   Electrical contracts relating to Bord Gáis Éireann wind farm development (Bord Gais Eireann)
It is anticipated that the applicants can provide all services outlined in this section. 2.1 Bord Gáis wind farms. It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all … View the procurement »
2011-02-02   Partial revision of steam turbine generator, Tarbert no. 4 (revised scope) (Endesa Ireland Ltd.)
In September 2010 a notice was published in OJEU (ref. # 2010/S 176-269048) via eTenders (ID # SEP168816) for "Revision of steam turbine generator, Tarbert no. 4. Including supply of turbine blades". As a result of a material change in scope this notice is being issued for a revised and reduced scope of work and supersedes the previous notice. Endesa Ireland wishes to invite expressions of interest for the partial revision of steam turbine generator, Tarbert no. 4. The scope of works shall include the … View the procurement »
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under … View the procurement »
Mentioned suppliers: Denis Moriarty The Kerries Limited