2017-03-03Mechanical and Electrical Facilities Maintenance (Marine Institute)
The Marine Institute, a semi State body, wishes to invite tenders for the supply of Mechanical & Electrical Facilities Maintenance for Marine Institute, Rinville, Oranmore, Co. Galway for a period of 3 years with an option to extend for a further 2 years.
The Institute comprises buildings of 11 000 sq.m. on a 14 acre site. It is a two storey with mechanical plant rooms at level three. The complex can be divided into three main sections:
— Crescent Building accommodating administration offices, full staff …
View the procurement » Mentioned suppliers:LMC energy solutions
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-01-23RFI for Shannon Airport Aircraft Hangar and Taxiway Project (Shannon Airport Authority DAC)
The Works Contractor shall be responsible for the construction of a new 7 200 m² steel framed aircraft hangar clad with insulated panels within the airport lands at Shannon Airport, Co. Clare, Ireland. The area includes for ancillary office space, workshops, plant rooms and storage space. Site works including car parking, landscaping and civil works.
The hangar will have an approximate 90m clear span steel roof truss with the works being carried out in poor ground conditions requiring significant ground …
View the procurement » Mentioned suppliers:L&M Keating Ltd
2016-12-22Electrical Engineering — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-12-22Mechanical Engineering — Reserved Specialist (Office of Public Works (OPW))
The Mechanical Works generally comprise the following:
Identification, tracing and phased strip out of existing mechanical services installations in Historic Leinster House.
Supply, installation, testing and commissioning on a phased basis in Historic Leinster House of the following:
New Heating installation throughout
New Air Conditioning and Ventilation Systems
New Water Services and Soils and Waste Systems
New BMS system which shall be connected to the existing BMS network
Fit-out of a new RTE TV and …
View the procurement »
2016-12-22Historic Leinster House refurbishment Pre-Qualification — Lift — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-12-21Pre-qualification of Electrical Works (IDA Ireland)
The Electrical Works include the following:
— Complete Lighting and Emergency Lighting Installation;
— Complete Site Lighting Installation;
— Complete Fire Alarm and Protective Services Installation;
— Complete Lightning Protection Installation;
— Complete General Services Installation;
— Complete Mechanical Plant Wiring Installation;
— Complete supply and installation of all Main and Submain Boards and Cabling;
— Complete Lift Installation and associated Design;
— Complete Commissioning and …
View the procurement »
2016-12-15Extension & Refurbishment of Scoil Mhicil Naofa Athy (Scoil Mhicil Naofa)
Construction of a two-storey extension and refurbishment of the existing two storey school including 12 No General classrooms, 5 No Special Needs classrooms, GP Hall, Library, Administration rooms and ancillary accommodation with a total combined floor area of c. 5 812 m². The proposed development is located on the site of the existing school and includes repairs to existing site boundary, new site access from Convent View, new car parking and set down area, 2 No new ballcourts and all other associated …
View the procurement »
2016-11-25Public Lighting Maintenance and Related Services Contract — Kilkenny/Carlow (Kilkenny County Council)
Public Lighting Maintenance and Related Services Contract — Kilkenny/Carlow.
The Contract is for the repair and maintenance of public lighting equipment and related services in Counties Kilkenny and Carlow on behalf of Kilkenny and Carlow County Councils.
Time-scale: The Maintenance Contract will initially operate for a 2 year period. Subject to continued satisfactory compliance with the terms of the Contract, the Contract may be renewed on an annual basis up to a maximum period of 2 years.
View the procurement » Mentioned suppliers:SSE Airtricity Solutions
2016-11-23UCD Heritage Houses Capital Works (University College Dublin ( UCD ))
University College Dublin (UCD) wishes to establish a multi party framework agreement for Main Contractor Works to UCD Heritage Houses Capital Works with an initial contract Ulysses Centre at Newman House. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Mechanical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Mechanical Services/Works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Electrical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Electrical Services / works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Facade Reserve Specialist. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 m².
View the procurement »
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-14Framework for Energy Efficency Retrofitting Works for Local Authorities (Kerry County Council)
The Local Government Operational Procurement Centre (LGOPC) acting as a Central Purchasing Body (CPB) under the auspices of Kerry County Council is coordinating the establishment of a framework of contractors on behalf of the Contracting Authorities
Local Authorities intend carrying out energy efficiency upgrades to council owned properties at various locations around the country.
The purpose of this competition is to establish a multi-party framework agreement for the provision of Energy Efficiency …
View the procurement » Mentioned suppliers:Local Government Operational Procurement Centre
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Catering Equipment... (Curragh Racecourse Ltd)
The Catering Equipment contract involves the supply and installation of all identified ‘heavy equipment’ in relation to the Curragh Racecourse Redevelopment Project. As part of the contract the Catering Equipment Contractor will be responsible for all coordination drawings, based on the constructed structural spaces ensuring coordination with all equipment in the specification package. This shall include all bespoke and proprietary items (the detail design drawings shall be BIM models reflecting design …
View the procurement » Mentioned suppliers:Kaneco Limited
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Electrical Specialist... (Curragh Racecourse Ltd)
The electrical services contract comprises of the following systems; i) Electrical power distribution, incorporating medium/low voltage switchgear, incorporating uninterruptible power supplies, generators, metering and fault detection, ii) General and emergency lighting, incorporating a DALI addressable lighting control system, iii) Information and communication technology structured cabling, fire detection and alarm system incorporating public address/voice evacuation, iv) General services and small …
View the procurement » Mentioned suppliers:Mercury Engineering
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Mechanical Works... (Curragh Racecourse Ltd)
The mechanical services at the new Curragh Racecourse development comprise of the following systems;
i) Incoming mains natural gas,
ii) Incoming mains water,
iii) Mains/Cold and Hot Water Storage and Distribution,
iv) Low temperature Hot Water Heating Generation and Distribution,
v) Chilled Water (CHW) Cooling Generation and Distribution,
vi) Multiple ventilation systems including Kitchen Supply & Extract, Toilet Ventilation and comfort cooling to occupied spaces, comprising of AHU and distribution …
View the procurement » Mentioned suppliers:Kirby Group Engineering
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Lifts & Escalators... (Curragh Racecourse Ltd)
The vertical transportation services at the new Curragh Racecourse development comprise of the following;
i) Passenger Lift Services
— 1 No. VIP 1 000 kg 13-person
— 1 No. Public lift 1 000 kg 13-person.
— 1 No. Public passenger lift 1 275 kg 17 person
ii) Goods Lift Services
— 1 No. dirty goods lift 1 400 kg
— 1 No. clean goods lift 5 000 kg.
Five escalators shall also be provided, 2 No. serving level 00 and level 01, 2 No. serving level 01 and level 02 and 1 No. serving level 02 and 03.
Note the …
View the procurement » Mentioned suppliers:Kone Ireland Limited
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-09-30New Acute Mental Health Unit at Sligo University Hospital (Health Service Executive (HSE))
The works consist of the construction of a new part single storey and part 2 story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3 500 sqm. Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure …
View the procurement »
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »