2023-03-21South East Greenway – Contract C – Ferrybank to Curraghmore Kilkenny (Wexford County Council)
This project involves the construction of Contract C which mainly entails 5.5kms of greenway (Lot
5a) from the Ferrybank, Kilkenny to Curraghmore, Kilkenny. This is part of the South East Greenway which involves the construction of circa 24kms of greenway from Waterford to New Ross
Summary of works include;
• Construct the Greenway Lot 5a Section pavement in accordance with Works Requirements, along with all ancillary works including site clearance, landscaping, finishes, fixtures and fittings, drainage, …
View the procurement »
2023-02-17CONTRACT FOR WORKS FOR THE FITZWILLIAM CYCLE ROUTE SCHEME (Dublin City Council)
Re-configuration of existing carriageway and construction of cycle facilities along the extents of the scheme. Works are located at Leeson Street Lower, Adelaide Road, Leeson St/Adelaide Road junction, Cumberland Road, Fitzwilliam Place, Fitzwilliam Square East, North, South, Baggot Street Lower, Fitzwilliam Street Upper and Lower, Merrion Square East, North, South, Mount Street Upper, Lower and Holles Street. Works include pavement works, earthworks, public lighting, traffic signs and road markings, …
View the procurement »
2022-07-08Glenamuck District Roads Scheme (Dun Laoghaire-Rathdown County Council)
DLRCC is seeking to establish a Single Party Framework Agreement for Major Civil Engineering Works with an initial contract for a works contractor to construct the Glenamuck District Roads Scheme (GDRS) comprising the following main elements;
• GDDR - approximately 890m of dual carriageway and 660m of two lane single carriageway road
• GLDR - approximately 1800m of single carriageway road
• Existing road upgrades
• New / upgraded Signalised Junctions
• Surface water drainage including sewers, culverts, a …
View the procurement »
2022-02-2322/003- Water and Wastewater Network Services and Works (WNSW) Sub – contractor List (Irish Water)
Irish Water wishes to appoint a number of Regional Services and Works Contractors (Regional Contractors) to assist in achieving its network improvement targets through targeted capital works. It is expected that these Regional Contractors will require large numbers of sub-contractors to supplement their own resources.
The purpose of this Expression of Interest (EOI) is to establish a list of sub-contractors that these Regional Contractors may choose to appoint over the duration of the project.
This …
View the procurement »
2021-09-28Major Civil Engineering Works Contractor Frameworks (Clonburris Infrastructure Ltd)
Clonburris Infrastructure Ltd (The Contracting Authority) is seeking to establish a multi-party framework agreement for Major Civil Engineering Works Contractor Frameworks (Large Works Plus €2million)). The successful framework members will also provide M&E specialist works for wastewater pumping station(s), landscaping specialist works for strategic parks, Traffic signals specialist works, public lighting specialist works and playground specialist works and small building/park pods works
View the procurement »
2021-03-19Royal Canal Greenway Phase 3 (Dublin City Council)
The project consists of a Greenway route along the bank of the Royal Canal over an approximate 2.1 km length between North Strand Rd (Newcomen Br) and Phibsborough Rd (Cross Guns Br).
Further details are provided in the tender documentation and RFT 185616 available on www.etenders.gov.ie
View the procurement »
2020-09-24Upper Cloghroe GWS — Watermain Upgrade (Upper Cloghroe Group Water Scheme)
This project involves the following works:
— construction of approximately 790 m of 110 mm OD HDPE SDR 17 waternain in road and road margin at Upper Cloghroe, Co. Cork;
— construction of domestic supply connections as specified in the works requirements;
— installation and commission of new pumping equipment as specified in the works requirements;
— construction of all valves as specified in the works requirements;
— installation of all of ancillary works as specified in the works …
View the procurement »
2020-07-09Bilberry to City Centre Greenway Link — Civil Works Contract (Waterford City and County Council)
Improvements to the 2.1 Km section of existing Greenway from the Bilberry Car Park to the Clock Tower at Waterford City Centre, works will comprise a combination of the following:
1) 1.6 Km's of 4 m wide Greenway along an existing road and 0.5 kms of 6 m wide Greenway parallel to an existing Quay Flood Wall;
2) construction of 2 x 4 m wide board walk structures approximately 150 m each in length;
3) boundary treatment comprising a combination of RC retaining walls, ‘perma crib’ type walls, stone faced …
View the procurement » Mentioned suppliers:John Cradock Ltd
2019-12-1619/223 — PQQ — Interreg Swell Wastewater Upgrades — Main Works Contract (Irish Water)
The Shared Waters Enhancement and Loughs Legacy (SWELL) project is supported by the European Union’s Interreg VA Programme, managed by the Special EU Programmes Body. The SWELL project’s aim is to improve the water quality, within the shared waters of Carlingford Lough and Lough Foyle. Through strategic catchment investigations and modelling, the SWELL project is planned to deliver optimised, sustainable capital upgrades to wastewater assets.
The works associated with this particular contract PQQ involve …
View the procurement » Mentioned suppliers:BSG Civil Engineering Ltd
2018-12-11Ballycoolen to Forrest Little and Ballycoolen to Ratoath Trunkmain Scheme (Irish Water)
— Lot 1 Ballycoolen to Forrest Little Trunkmain Scheme: It has been identified that a new trunk main is required to augment the supply to North County Dublin and to ensure security of supply,
— Lot 2 Ballycoolen to Ratoath Trunkmain Scheme: It has been identified that a new regional trunk main is required to enable the transfer of available treated water between the Greater Dublin Area and Meath.
View the procurement » Mentioned suppliers:Roadbridge Ltd
2018-11-26Ballycoolen to Forrest Little Trunkmain Scheme (Irish Water)
The existing trunk main network capacity to the northern area of Fingal is considered deficient. The current peak demand for the supply area is in excess of the capacity of the existing trunk main. As a result, levels of service to customers in the area occasionally fall below desired levels. It has been identified that a new trunk main is required to augment the supply to this area and to ensure security of supply. This is also required to ensure that water supply does not hamper future development in the area.
View the procurement »
2018-11-07Greater Dublin Drainage Project – Marine Outfall DB Contract (Irish Water)
Scope of Works includes for the design, build, testing and commissioning of the following•Approximately 2 km length of 2 000 mm internal diameter outfall pipeline, installed using tunneling methods and passing beneath Baldoyle Bay to Velvet Strand:
— approximately 4 km length of 2 000 mm internal diameter outfall pipeline, installed using dredging methods from Velvet Strand to approximately 1 km North East of Irelands Eye,
— outfall diffuser,
— dredge crossing/protection works of existing fibre optic …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Terrestrial Pipelines DB Contract (Irish Water)
The Scope of Works includes for the design, build, testing and commissioning of the following:
— orbital sewer from Blanchardstown, Dublin 15 in the NW of Dublin to the WwTP at Clonshagh (approximately 13,8 km),
—— approx. 1 km length of gravity pipeline through Connolly hospital installed using trenchless techniques (1 800 mm internal dia., c. 10 m depth),
—— approximately 5,4 km length of 1 400 mm dia. rising main,
—— approximately 7,4 km length of 1 800 mm dia. gravity pipeline,
— live connection of …
View the procurement »
2018-08-07Cork City Water Supply Scheme Networks Upgrades (Irish Water)
Irish Water is responsible for the treatment and distribution of drinking water in Cork City.
As part of the implementation of a Water Conservation Project for the city, watermains in the network have been identified for rehabilitation. These include watermains that:
— Are not suitably responsive to active leakage control measures,
— Have water quality issues,
— Have reached the end of their service life, and
— Have insufficient hydraulic capacity and are impacting on the efficient operation of the …
View the procurement » Mentioned suppliers:Northstone (NI) Lt T/A Farrans Construction
2018-04-13Cork City and Mallow Network Contracts (Irish Water)
Irish Water is responsible for the treatment & distribution of drinking water & the provision of sewer collection systems in Cork City & Co.
— Lot 1: A number of Combined Sewer Overflows (CSOs) have been identified for removal from the sewer network in Mallow as they are currently in breach of the urban wastewater treatment directive & are the subject of an European Court of Justice (ECJ) infringement notice. The removal of these CSOs will necessitate new trunk sewers to be constructed within the town.
— …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2018-01-10Saggart Reservoir – Construction works (Irish Water)
Saggart Reservoir site is a key strategic operational water transfer and storage facility. It comprises existing storage reservoirs and secondary chlorination plant from where water is distributed to other strategic service reservoirs in the Dublin region.
It is intended that the works will be implemented under a design and build contract.
Scope of works.
Works are now required at the existing Saggart site comprising the following:
- 100000 m3 covered storage comprising 2 cells with inlet and outlet …
View the procurement »
2017-11-13FCC/199/17 Establishment of a multi-operator Framework Agreement for Consultant Engineering Services for Development... (Fingal County Council)
FCC intends to set up a framework of Consultant Engineers to
tender for the provision of Engineering Consultancy Services on Development Resolution Projects of a general nature up to an estimated value of 1 000 000 EUR ex. VAT.
This will involve surveying and examining the condition of all the infrastructure in Developments, designing remediation and establishing cost estimates to bring all infrastructure up to FCC taking in charge standards.
The consultants will be required to provide professional …
View the procurement »
2017-09-05Project Indigo Green — Contract 2 (Irish Water)
The scope consists of water pumping station, watermain, foul sewer rising main, and gas related works as per Part 3 — Scope document.
The works will consist of approximately 4.2 km of 140 mm PE SDR17 foul sewer rising main, 4.8 km watermain of various sizes ranging from 355 mm PE SDR17 to 560 mm PE SDR17, a new water pumping station at Loughsallagh and all associated ancillaries.
The works will also construction and testing of circa 5 km of 315 mm diameter PE100 4 bar gas main and all associated …
View the procurement » Mentioned suppliers:GMC Utilities Group Ltd
2017-05-22A Multi-Supplier Framework for the provision of Minor Civil Engineering Works (Irish Water)
The Contracting Entity intends to establish a multi-supplier framework for the provision of Minor Civil Engineering Works to Irish Water.
It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 4 Lots. A high level description is given below. Further details of the Lots are given in the pre-qualification document.
— Lot 1: All works and services associated with Sewer Rehabilitation Works …
View the procurement »
2017-03-23Carlow Watermains Rehabilitation Phases 2 and 3 (Irish Water)
Irish Water proposes to carry out rehabilitation works on sections of the water distribution network in County Carlow. Works will involve:(i) the rehabilitation of approximately 10km of watermains in Carlow Town, Tullow, Bagenalstown and Tinnahinch (ii)The replacement of back yard water mains and service connections with new service connections from either existing or new water mains located in public property, in Carlow Town, Bagenalstown and Tinnahinch. The replacement shall include both public …
View the procurement »
2017-03-23Millstreet WWTP Upgrade Contract (Irish Water)
The Contracting Entity intends to appoint a Contractor who will be responsible for the design, construction and operation, for some elements, of major Civil, MEICA and process works (incorporating associated works and services) at Millstreet WWTP and within the wider agglomeration. These works will be part of Irish Water's Capital Investment Plan.
Please refer to the PQQ documents for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-11-04Bantry to Kealkill Trunk Watermain Project (Irish Water)
Irish Water plans to undertake the construction of the following to deliver water from Bantry to Kealkill:
— Construction of new water mains.
— Replacement of defective water mains.
— Upgrade of river intake works.
— Construction of water booster pumping stations.
— Construct raw water mixing tank.
— Construction of treated water storage reservoirs.
— Associated ancillary works.
View the procurement »
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-25Howth Balbriggan Kingstown Malahide Water Supply Scheme (Irish Water)
This contract is for the design and construction of an upgrade to the existing water supply network in Howth, Balbriggan, Malahide and between Ballycoolen and Kingstown in Fingal. The works included in this contract include the construction of large diameter water mains, a pumping station, reservoir and ancillary controls and telemetry.
The above is the anticipated scope of the contract but 1 or more of the above schemes may not be included in the tender stage of this competition, and thus may not be …
View the procurement » Mentioned suppliers:John Cradock Ltd/TES NI JV
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd
2016-06-2816/095 — Bandon Watermain and Sewer Network Upgrade (Irish Water)
— Replacement of approx. 4km of water mains (dia. ranging from approx. 75mm-225mm) to be installed using open cut techniques;
— Approx. 2,2km of new trunk mains (dia. ranging from approx. 100mm-200mm) using open cut techniques;
— Replacement of approx. 1km of backyard distribution water mains;
— Replacement of approx. 110 no backyard domestic customer service connections with individual front of property service connections (to include house surveys and connection design);
— Removal of 10 No Storm-water …
View the procurement » Mentioned suppliers:Ward and Burke Constraction Ltd
2016-03-18Upper Liffey Valley Regional Sewerage Scheme Contract 2A Networks (Ervia)
Irish Water plan to undertake the construction of a new sewerage collection
network from Kilbelin in Newbridge to Osberstown WwTP including gravity
sewers, 3 No new pumping stations, 3 No new storm tanks and rising mains. The
project will convey flows from Newbridge, reducing storm water overflows to the
River Liffey, to Osberstown WwTP.
View the procurement » Mentioned suppliers:Roadbridge Ltd
2016-02-24Dunlavin WwTW and Satellite Plants — Operation and Maintenance Contract (Ervia)
This scheme involves provision of services to areas in West Wicklow. It comprises
4 No wastewater treatment facilities, 2 No pump stations and associated
foul/combined waste water collection network. A drawing showing the location of
the proposed works is included in Appendix 3.
Scope of Works.
The services to be provided by the Contractor include but are not limited to the
following:
— Design-Build: Enabling works at Knockannana, Kiltegan and Rathdangan to
facilitate operation (instrumentation and …
View the procurement »
2016-02-23Blanchardstown Regional Drainage Scheme (BRDS) 9C Sewer Duplication and Storage (Ervia)
— Approximately 3.2 km of pipeline (diameters ranging from approximately
1 500 mm to 1 800 mm) installed using trenchless techniques
— Underground storage tanks with an approximate total capacity of 30 000 m³ to cater for stormwater flows and flow balancing
— New Pump Station to lift flows (approximately 350l/s) from the proposed sewer to the existing sewer
— Stormwater return pumps to return flows from the storage tanks to the existing
9C Sewer (approximately 320/ls)
— Diversion of the existing live 1 …
View the procurement »