2019-06-14Provision of Owners Engineer Services for Coillte’s Bio Energy Opportunity — Project Shine (Coillte CGA)
Coillte CGA (Coillte, or the Company) has taken the decision to explore interest amongst suitably qualified service providers for the provision of certain services in relation to the Company’s opportunity for the development of a renewable energy project at one of its manufacturing sites. The project under consideration by Coillte encompasses the potential development of a bio-energy plant to produce thermal and electrical energy to meet the full operational needs of the on-site manufacturing …
View the procurement »
2019-06-08Design Team Services for Additional Accommodation for Dominican College (Dominican College Wicklow)
The project comprises:
— 3 science laboratories,
— 2 science preparation areas,
— 1 design and communication graphics room,
— student toilets including a universal toilet,
— staff toilets,
— locker space,
— conversion of 2 existing science laboratories to classrooms,
— gross floor area of new accommodation including circulation and partitions: 620 m.
View the procurement »
2019-05-29Construction of Tandy’s Lane Park (South Dublin County Council)
Construction of Tandy’s Lane Park in Adamstown. Works are to be undertaken on behalf of SDCC, the construction of a public park of approximately 8 hectares/19 acres. It includes earth work, drainage works, hard and soft landscape works and specialised works (via a novated specialist) for playgrounds. The drainage works include swales, French drains, drainage of 2 football pitches and drainage of a car park with a permeable surface. Some small pedestrian bridges are to be constructed. Earth works include …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2019-05-22N11 Parallel Service Road (Wicklow County Council)
Construction of a segregated service road on the southbound carraigeway of the N11 Parallel Service Road at Kilmacanoge between Junction 7 (Bray South) and Junction 8 (Kilmacanoge). The works will include carriageway widening into the central reserve by up to 3 m over a distance of 1,7 km, provision of 2 sign gantries, alterations to existing services, replacement of safety barrier and associated traffic management.
View the procurement »
2019-05-20T4 Alexandra Road Bridge (Dublin Port Company)
The construction of a 150 m long, 13 m wide 2 lane vehicular bridge with access ramps over Alexandra Road at Dublin Port. The works also include associated lighting columns of up to 8 m in height and all associated site development works. The bridge will connect the CDL Yard and Terminal 4. The bridge will be used for port related commercial and service vehicular traffic only and will not be for general public use.
View the procurement »
2019-05-02Foynes East Jetty Extension (Shannon Foynes Port Company)
The proposed contract consists of the intention to connect the existing West Quay to the existing East Jetty in Foynes Port (both of which will remain operational throughout the works), with the purpose of extending the length of the existing quay to facilitate the mooring of vessels and Port related operations. Further details in PQQ.
Note: PQQ shall be returned via post, courier or hand delivered to the address noted in the PQQ by the deadline date and time.
View the procurement »
2019-04-30Hazardous Waste Disposal (Irish Naval Service)
The Irish Naval Service request economic operators to submit responses for the service of the removal of hazardous waste from the Naval Base Haulbowline as part of the tender documents attached.
View the procurement » Mentioned suppliers:Enva
2019-04-25Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works.
Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2).
This RFI seeks to …
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-04-10Establishment of a Multi-Party Framework Agreement for Civil Engineering and Utility Works Contractors for Projects... (University College Dublin (UCD))
UCD are establishing a Multiple Operator Framework for Civil Engineering and Utility Works Contractors for projects in excess of 1 250 000 EUR. The framework agreement will be in operation for 4 years. The indicative works envisaged comprise of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement …
View the procurement »
2019-03-27UCD are Setting Up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors (University College Dublin (UCD))
UCD are setting up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors for large scale contracts.It is envisaged that the scope of works will typically consist of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement works, landscaping works, road, carpark and path …
View the procurement »
2019-03-04Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement » Mentioned suppliers:McGinty and O'Shea Ltd
2019-02-21Clonturk Temporary Accommodation (City of Dublin Education and Training Board)
City of Dublin ETB invites tenders for the construction of 2 storey temporary modular school building and single storey modular changing rooms at Clonturk Community College, Dublin 9.
Tenders for 1 or more of the following 3 options only may be submitted at the discretion of tenderers under this open procedure:
Option 1: 3 year rental and subsequent removal from site (on basis of 36 monthly payments);
Option 2: 3 year rental and subsequent outright purchase by CDETB (on basis of 36 monthly payments and …
View the procurement »
2019-02-15Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document.
View the procurement »
2019-02-15It is the Intention of Meath County Council to establish a Multiparty Framework Agreement to undertake Public Realm... (Meath County Council)
It is the intention of Meath County Council to establish a Multiparty Framework Agreement to undertake Public Realm and Civil Engineering Works associated with the Navan Town Centre Plan – Navan 2030.
The Framework Agreement will consist of 4 suitably experienced and resourced Civil Engineering Contractors and the framework shall be for a duration of 4 years from appointment. The estimated total value of the works to be procured under the proposed Framework Agreement is circa 15 000 000 EUR.
View the procurement »
2019-01-31Supply of Temporary Buildings (South Dublin County Council)
Supply, delivery and installation of the listed temporary buildings below — including all electrical and mechanical installations — to accommodate 40 people to South Dublin County Council’s Public Realm depot, Tymon Park, Tallaght, Dublin 24
Canteen facility
Toilet block 4
Shower block
Drying room and lockers
View the procurement » Mentioned suppliers:Portakabin Allspace
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.
2018-12-17Aurora Civils Framework (Ervia)
Single supplier Framework Agreement for the completion of maintenance works on the existing network infrastructure, the design and construction of new customer connections and network extensions as required. The successful Applicants responsibilities will include but not be limited to:
— maintenance and emergency maintenance works,
— standby and emergency cover,
— telecommunications network design work and associated ancillaries,
— telecommunications duct network construction to include open trench, mole …
View the procurement » Mentioned suppliers:KN Network Services (Ire) Ltd
2018-12-11Procurement of Architect and Engineering Design Services (Leitrim County Council)
Architect Led Project Management Design Team Services for the detailed design, procurement, environmental & construction management and final certification of the proposed Public Realm Improvement Works at Carrick on Shannon, Co. Leitrim. The selected consultants shall also be responsible to take up roles of Designer, Employers Representative (ER) in construction contract and PSDP (Health and Safety). All details are available on attached tender documentation.
View the procurement »
2018-11-29SWSOS Site Upgrades (Ervia)
Scope includes for the design, construction, testing, commissioning, maintenance, and ultimately handover of upgrades to security systems and enhancements at a number of two existing Gas Transmission Stations and two existing compressor stations in Scotland. The upgrade works will include the installation of extensive (>1 km) lengths of high specification security fencing and gates, incorporating PIDs, electric toppers and associated security lighting, CCTV and video analytics. Ancillary upgrade works …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Marine Outfall DB Contract (Irish Water)
Scope of Works includes for the design, build, testing and commissioning of the following•Approximately 2 km length of 2 000 mm internal diameter outfall pipeline, installed using tunneling methods and passing beneath Baldoyle Bay to Velvet Strand:
— approximately 4 km length of 2 000 mm internal diameter outfall pipeline, installed using dredging methods from Velvet Strand to approximately 1 km North East of Irelands Eye,
— outfall diffuser,
— dredge crossing/protection works of existing fibre optic …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Terrestrial Pipelines DB Contract (Irish Water)
The Scope of Works includes for the design, build, testing and commissioning of the following:
— orbital sewer from Blanchardstown, Dublin 15 in the NW of Dublin to the WwTP at Clonshagh (approximately 13,8 km),
—— approx. 1 km length of gravity pipeline through Connolly hospital installed using trenchless techniques (1 800 mm internal dia., c. 10 m depth),
—— approximately 5,4 km length of 1 400 mm dia. rising main,
—— approximately 7,4 km length of 1 800 mm dia. gravity pipeline,
— live connection of …
View the procurement »
2018-07-27N59 Maam Cross to Bunnakill (Galway County Council)
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement / realignment of a number of local and access roads.The Project includes earthworks in challenging …
View the procurement » Mentioned suppliers:Clare Civil Engineering
2018-07-2460 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development.
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »
2018-07-20Ringsend WwTP — Phosphorus Fixation Contract (Irish Water)
The Ringsend WwTP treats most of the wastewater arising in the Greater Dublin Area. Irish Water is currently planning an upgrade to the Ringsend Treatment Plant based on the application of aerobic granular sludge technology (Nereda®) which will provide for nutrient removal, including Enhanced Biological Phosphorus Removal (EBPR). The introduction of aerobic granular sludge and EBNR will be carried out in phased upgrades of the Ringsend plant, with the aim (inter alia) of reducing the Phosphorus (P) …
View the procurement » Mentioned suppliers:Murphy International Ltd
2018-07-06Framework Agreement for Provision of Waste Management Services (daa plc)
The core purpose of the waste service at Dublin Airport is the provision of a disposal service for waste generated in public and back of house areas as the result of the normal operation of Dublin Airport. The service is contracted to a specialised waste management service provider who operates the service on a day to day basis.
View the procurement »
2018-07-04New Centre for Radiation Oncology at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8,050 sqm in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:John Paul Construction
2018-07-02CNG — Design Build Framework Contract (Ervia)
Multi-supplier Framework Agreement for Design Build and Maintenance of CNG stations including full project life cycle from preliminary design through to construction and commissioning, roles of PSDP and PSCS and handover of the completed station to GNI. Scope includes supply, delivery and installation of fast fill CNG filling station with compressors, high pressure storage and dispensers. Supplier to provide 24 hrs per day, 365 days per year remote support and provision of scheduled and demand …
View the procurement » Mentioned suppliers:GMC Utilities Group Ltd
2018-06-19Coillte CGA Forest Engineering Services 2018-2021 (Coillte CGA)
Pre-qualification questionnaire:
Multi-Party Framework Agreement for the provision of Forest Engineering Services 2018-2021:
— Lot 1: Hourly Contracts,
— Lot 2: Linear Metre Contracts,
— Lot 3: Preventative Upgrade Contracts.
This is the first stage of this Competitive Procedure with Negotiation whereby any interested party may submit a response to this Questionnaire in order to be considered for inclusion on the tender list. Following evaluation of the Qualification Questionnaires submitted, suitable …
View the procurement »
2018-06-14Western Distributor Road Phase 2 Main Construction Contract (Sligo County Council)
The Western distributor road Phase 2 comprises a new single carriageway south west of Sligo Town commencing at the Ballydoogan Road (Phase 1) and terminating at the Caltragh Interchange, the scheme will improve access to the existing IDA Business Park at Finisklin and provide access to the new IDA Business Park at Oakfield and zoned land in the area.
View the procurement » Mentioned suppliers:SIAC Construction Ltd
2018-05-25N5 Westport to Turlough Road Project (Design and Build Contract) (Mayo County Council)
The N5 Westport to Turlough Road Project comprises the construction of new national primary road (approximately 23km long), new national secondary road (approximately 2,5 km long) and all ancillary works. The 25,5 km overall length of the route consists of approximately 20,3 km of Type 2 Dual Carriageway and approximately 5,2 km of Single Carriageway including a section of online improvement.
It is currently envisaged that the scheme includes the following elements of infrastructure:
— 2 nr. compact …
View the procurement » Mentioned suppliers:BAM Civil LtdWill Bros Ltd
2018-04-26N22 Baile Bhuirne to Macroom Road Development Design and Build Contract (Cork County Council)
This road development comprises of the construction of an approximately 22 km upgrade to the main N22 Cork — Tralee road, to be constructed offline. It will require construction of Type 2 dual carriageway, a number of both grade separated and at-grade interchanges, river bridges, local road re-alignments, road bridges, accommodation underpasses and culverts, environmental mitigation and traffic management, all in close proximity to environmentally sensitive sites, and sites of historical and cultural …
View the procurement » Mentioned suppliers:John Cradock LtdJons Civil Engineering Ltd
2018-03-27Westmeath County Council is seeking expressions of interest from suitably qualified economic operators to deliver a... (Westmeath County Council)
Westmeath County Council (“the Contracting Authority”) is seeking expressions of interest from suitably qualified economic operators who are interested in the delivery of a sustainable mixed tenure residential development including an access road at Brawny Road, Lissywollen, Athlone, County Westmeath (“the Development”). The Contracting Authority is seeking to identify an economic operator that is capable of working in collaboration with the Contracting Authority to identify the optimal solution for the …