N59 Maam Cross to Bunnakill

Galway County Council

The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement / realignment of a number of local and access roads.The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls.
The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.

Deadline

The time limit for receipt of tenders was 2018-08-31. The procurement was published on 2018-07-27.

Suppliers

The following suppliers are mentioned in award decisions or other procurement documents:

Who? What? Where?
Procurement history
Date Document
2018-07-27 Contract notice
2019-11-21 Contract award notice
Contract notice (2018-07-27)
Object
Scope of the procurement
Title: Main road construction works
Reference number: N59 Maam Cross to Bunnakill
Short description:
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement / realignment of a number of local and access roads.The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls. The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.
Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Main road construction works ๐Ÿ“ฆ
Additional CPV: Construction work ๐Ÿ“ฆ
Place of performance
NUTS region: Ireland ๐Ÿ™๏ธ

Procedure
Procedure type: Restricted procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Regional or local authority
Awarding authority name: Galway County Council
Postal address: County Hall
Postal code: Prospect Hill
Postal town: Galway
Contact
Internet address: http://www.galway.ie/en/ ๐ŸŒ
E-mail: bgallagher@galwaycoco.ie ๐Ÿ“ง
Phone: +353 91509002 ๐Ÿ“ž
URL for documents: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=133002&B=ETENDERS_SIMPLE ๐ŸŒ
URL for participation: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=133002&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Dates
Date dispatched: 2018-07-27 ๐Ÿ“…
Submission deadline: 2018-08-31 ๐Ÿ“…
Publication date: 2018-07-31 ๐Ÿ“…
Identifiers
Notice number: 2018/S 145-330893
Refers to notice: 2018/S 095-214673
OJ-S issue: 145
Additional information
The construction of this 5km section of national road in the Connamara region will require careful construction mitigation to meet the requirements laid out in the environmental impact statement. The Project includes some bridge works with a considerable amount of peat excavation.
Show more

Object
Scope of the procurement
Short description:
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement / realignment of a number of local and access roads.The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls.
Show more
The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.
Estimated total value: 7 500 000 EUR ๐Ÿ’ฐ
Short description:
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway.
This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement / realignment of a number of local and access roads.
Show more
The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and five material deposition sites.
Show more
There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls.
Estimated value excluding VAT: 7 500 000 EUR ๐Ÿ’ฐ
Duration: 14 months
Additional information:
The construction of this 5km section of national road in the Connamara region will require careful construction mitigation to meet the requirements laid out in the environmental impact statement. The Project includes some bridge works with a considerable amount of peat excavation.
Show more
Place of performance
Main site or place of performance: Co. Galway

Procedure
Legal basis: 32014L0024
Envisaged number of candidates: 5
Objective criteria for choosing the limited number of candidates: All details are included in the documents uploaded
Time of receipt of tenders: 17:00
Date of dispatch of invitations: 2018-10-05 ๐Ÿ“…
Languages in which tenders or requests to participate may be submitted: English ๐Ÿ—ฃ๏ธ
Tender validity period: 14 months

Contracting authority
Identity
National registration number: N/a
Contact
Contact point: Brendan Gallagher
Address of the buyer profile: https://irl.eu-supply.com/ctm/Company/CompanyInformation/Index/423 ๐ŸŒ
Documents URL: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=133002&B=ETENDERS_SIMPLE ๐ŸŒ
Awarding authority name: Heather Gibbons
Postal address: Galway National Roads Office
Postal town: Ballybritt, Galway
Postal code: H91 KT67
Contact point: Heather Gibbons
Phone: +353 91509000 ๐Ÿ“ž
E-mail: hmgibbons@galwaycoco.ie ๐Ÿ“ง

Complementary information
Review body
Name: N59 Maam Cross to Bunnakill
Postal town: Galway
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Source: OJS 2018/S 145-330893 (2018-07-27)
Contract award notice (2019-11-21)
Object
Scope of the procurement
Short description:
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement/realignment of a number of local and access roads.The project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls. The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.
Show more
Total value of the procurement: 16561764.60 EUR ๐Ÿ’ฐ
Notice metadata
Document type: Contract award notice

Procedure
Type of bid: Not applicable
Award criteria
Lowest price

Contracting authority
Contact
E-mail: cjoyce@galwaycoco.ie ๐Ÿ“ง
Phone: +353 91509096 ๐Ÿ“ž

Reference
Dates
Date dispatched: 2019-11-21 ๐Ÿ“…
Publication date: 2019-11-25 ๐Ÿ“…
Identifiers
Notice number: 2019/S 227-556344
Refers to notice: 2018/S 145-330893
OJ-S issue: 227
Additional information
The construction of this 5 km section of national road in the connamara region will require careful construction mitigation to meet the requirements laid out in the environmental impact statement. The project includes some bridge works with a considerable amount of peat excavation.
Show more

Object
Scope of the procurement
Short description:
The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement/realignment of a number of local and access roads.The project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.There are a number of structures on the scheme possibly including 2 new bridges and 2 retaining walls.
Show more
This section of road is approximately 5 km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6 m carriageway, 0,5 m hard strips and verges of approximately 2 m to 3 m. Upgrades also include the improvement/realignment of a number of local and access roads.
Show more
The project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of 2 peat restoration areas and 5 material deposition sites.
Show more
Additional information:
The construction of this 5 km section of national road in the connamara region will require careful construction mitigation to meet the requirements laid out in the environmental impact statement. The project includes some bridge works with a considerable amount of peat excavation.
Show more
Place of performance
Main site or place of performance: Co. Galway.

Award of contract
Date of contract conclusion: 2019-11-01 ๐Ÿ“…
Name: Clare Civil Engineering
National registration number: 4633874G
Postal address: 608 Jordanstown Road, Co. Dublin, Greenogue Business P
Postal town: Dublin
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Phone: +353 12572740 ๐Ÿ“ž
E-mail: info@clarecivil.ie ๐Ÿ“ง
Total value of the procurement: 16561764.60 EUR ๐Ÿ’ฐ
Information about tenders
Number of tenders received: 4

Contracting authority
Contact
Contact point: Cathal Joyce
Source: OJS 2019/S 227-556344 (2019-11-21)