Procurements: Installation services of electrical equipment (page 2)
2019-09-06Samuel Beckett Civic Campus Phase 2: Electrical Services (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line.
Phase 1 included a sports and community building, sports pitches and surface car parks.
Phase 2 will expand on phase 1 and will include the following:
A. The change of use of the Phase 1 sports and community building to a library and community building;
B. Refurbishment of the existing sports building to create a new library;
C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s …
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Electrical subcontractors (reserved specialist to the main appointed contractor) for electrical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement »
2018-10-02Kanturk National School — Pre-qualification for Selection as Electrical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 sqm on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil …
View the procurement »
2018-09-17RS Electrical — Construction of a new 3-storey Post-primary School Building (Scoil Mhuire Gan Smal (Blarney))
Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Electrical installation for a new 3-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and …
View the procurement » Mentioned suppliers:O KEEFFE ELECTRICAL
2018-08-22Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in …
View the procurement »
2017-06-29Carrigaline Education Campus — Electrical Installation (Cork Education and Training Board)
Cork Education and Training Board (CETB) invites Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Electrical installation for the new 3- school, 8.6 ha, Carrigaline Education Campus, comprising (i) a 2-storey, split-level Gaelcholáiste (5 680 m) for 500 pupils, including learning, administration and ancillary spaces, a physical education hall and outdoor ball courts; (ii) a 24 classroom, 2-storey, split level school (3 748 m), to accommodate the Gaelscoil, including …
View the procurement » Mentioned suppliers:H&F Electrical Contractors Ltd
2016-07-20Electrical Maintenance Services (Institute of Technology Tallaght)
The scope of the works is to provide:
Planned preventative maintenance of emergency lighting, medium voltage switchgear, low voltage switchgear and distribution boards.
Reactive maintenance of all other electrical systems on a time and material basis, together with new electrical installation works, based on the tendered ‘basket’ of hours submitted with this tender.
View the procurement »
2015-09-25Mechanical and Electrical Contractors Frameworks (daa plc)
The Contracting Authority proposes to set up a non-exclusive framework agreement with a number of Mechanical and Electrical Engineering Contractors for projects at Dublin Airport for the next 4 years (with an option to extend for 1 further year) subject to ongoing satisfactory performance and workload.
This RFT process is to identify suitable Tenderers for consideration for inclusion on the Framework Panel/s.
View the procurement »
2015-05-20Electric Vehicle Charge Point Installations (Electricity Supply Board ( ESB ))
This service requirement covers the installation of Domestic Electric Vehicle (EV) Charge Points suitable for charging electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEVs) for use in private premises, as part of a country wide roll out undertaken to support the use of electric vehicles in Ireland. The Charge Points equipment involved which may be manufactured by more than 1 supplier will be supplied free-of-charge to the appointed contractor(s) by ESB ecars. The scope covers the …
View the procurement » Mentioned suppliers:NMD Electrical
2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-03-20Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project …
View the procurement »
2015-03-06Process for the Designation of an Electrical Safety Supervisory Body (Commission for Energy Regulation)
The Commission for Energy Regulation (CER) is Ireland's independent energy and water regulator. The CER was established in 1999 and now has a wide range of economic, customer protection and safety responsibilities in energy. The CER is also the regulator of Ireland's public water and wastewater system. As provided for under the Electricity Act 1999 (as amended), the CER is operating a Designation Process in order to determine what party (if any), it shall appoint as an Electrical Safety Supervisory Body …
View the procurement » Mentioned suppliers:Register of Electrical Contractors of Ireland Ltd
2015-02-13Design, Installation and operation of CHP Plant at UCD (University College Dublin (UCD))
UCD requires the market to propose a solution for the design, installation, operation and maintenance of a CHP package that best suits UCD's goals as outlined. The primary goal of this project is to reduce UCD's energy consumption and provide long-term energy management solutions. It is likely that UCD will be entering into a long-term contract (maximum 15 years) with the successful candidate for the supply, commissioning and operation of new CHP high efficient plant, with an energy performance contract …
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-12-20FD/02/05/292 - Facilities Management Services (Irish Prison Service)
The Irish Prison Service (IPS) requires the provision of a
facilities management contract covering Mechanical and
Electrical planned and reactive maintenance.
Service provider must provide a fully managed service,
acting as a Prime Contractor with single point responsibility
for managing and delivering all the services at the specified
premises.
The scope of the contract shall be to provide a facilities
management service for the provision of specialist
contractor support with a managed service to cover …
View the procurement »
2013-09-23Tender for Electrical Maintenance and General Electrician Services (Athlone Institute of Technology)
AIT wishes to engage an electrical contractor in to provide electrical maintenance and general electrician services for all of the Institutes facilities. The campus has approximately 65 000 square metres of floor space on 53 acres over two campuses. The successful applicant will be responsible for the electrical maintenance, servicing and efficient, effective operation of equipment on campus. Theservices provided under the contract are listed in the Call for Expressions of Interest document which is …
View the procurement »
2013-07-1013.027 - Service Provider for Energy Data Logger Supply, Installation, Commissioning and Maintenance (Office of Public Works ( OPW ))
The Office of Public Works (OPW) has been funded to implement a large scale Staff Energy Awareness Campaign in the Public Service. This tender is to select.
suitable Service Providers to supply, install, commission and maintain Energy Data Logger (EDL) equipment in buildings participating in the programme. The EDL shall
collect pulse data from energy meters (electricity, gas, oil, heat, etc) and automatically transmit this data to the OPW's Central Energy Data Repository (CEDaR) database.
The tender is …
View the procurement »
2013-02-16MAY336655 - Cork Traffic Signal Maintenance and Related Services Tender (1) (Cork City Council)
Cork City Council invites tenders to carry out Traffic Signal Maintenance and Related Services in the Cork City Metropolitan Area. The tender's scope of supply will include at a minimum the following: - Routine preventative maintenance-Emergency call out response 24/7 - Annual lamp replacement and Inspections - Provision of an FMS system-Provision of a Local depot - Undertake PSDP and PSCS duties as appropriate. - Provide Traffic Management design and implementation facilitates - Provide small civil …
View the procurement »
2012-11-01LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows:
Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick.
Lot 2 Call Out Electrical Maintenance Works – LIT Thurles.
Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel.
The purpose of the first stage is to obtain information from the applicants to determine their suitability …
View the procurement »
2012-02-13Development of St Johns old church as a cultural, heritage educational and display centre (St Johns Old Cemetery Restoration Group)
The work comprises the renovation and refurbishment of St Johns Church Nobber Co Meath. Located in an area of significant archaeological sensitivity the works include, replacement of existing roof, retaining original materials as far as possible. Repair defects in masonary to include Belltower, gutters ane eaves. Rehabilitation of windows and doors and installation of new fire exit door. Construction of new glazed entrance structure and a new viewing window on the South gable. Construction of Toilet …
View the procurement »