2017-05-08Mechanical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete mechanical services installation and sub-specialists works (Heating, plumbing, soils and Wastes, BEMS etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site boundary treatment with landscaping to include connection to external perimeter pavement. The total floor area of …
View the procurement » Mentioned suppliers:GMG Mechanical Services Ltd
2017-05-08Electrical Installations Reserved Specialists for Holy Family Special School, Cootehill (Holy Family School (Cootehill))
The works shall include complete electrical services installation and sub-specialists works (CCTV, Security, Fire alarms, Access controls, LV Switchgear, Lighting controls, Emergency Lighting, small power, induction loops, lightning protection etc) associated with the development of a new 1-2 storey replacement Special need's School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site …
View the procurement » Mentioned suppliers:MAC Electrics Ltd
2017-03-23Millstreet WWTP Upgrade Contract (Irish Water)
The Contracting Entity intends to appoint a Contractor who will be responsible for the design, construction and operation, for some elements, of major Civil, MEICA and process works (incorporating associated works and services) at Millstreet WWTP and within the wider agglomeration. These works will be part of Irish Water's Capital Investment Plan.
Please refer to the PQQ documents for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-03-01Cork Mid-West Bundle — Waste-water Treatment Plants DBO Contract (Irish Water)
The Contract consists of the detailed design, construction and testing of new waste-water treatment facilities and upgrades to the collection networks in 4 separate agglomerations in Ballyvourney/Ballmakeera, Dripsey, Innishannon and Coachford. Commissioning and testing of all works. The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) up to a period of 7-years, with the option to extend by 3 years, following completion …
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2017-02-03Bandon Sewerage Scheme — Wastewater Treatment Plant Upgrade (Irish Water)
This project spans 2 separate site locations on the outskirts of Bandon town; the Glasslinn Road Pumping Station and the Bandon Wastewater Treatment Plant. The sites are currently inter-connected by 2no. rising mains with a new 350mm rising main to be constructed under the current contract.
Please refer to the PQQ for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-12-22Electrical Engineering — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-12-22Historic Leinster House refurbishment Pre-Qualification — Lift — Reserved Specialist (Office of Public Works (OPW))
Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards — this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the …
View the procurement »
2016-12-21Pre-qualification of Electrical Works (IDA Ireland)
The Electrical Works include the following:
— Complete Lighting and Emergency Lighting Installation;
— Complete Site Lighting Installation;
— Complete Fire Alarm and Protective Services Installation;
— Complete Lightning Protection Installation;
— Complete General Services Installation;
— Complete Mechanical Plant Wiring Installation;
— Complete supply and installation of all Main and Submain Boards and Cabling;
— Complete Lift Installation and associated Design;
— Complete Commissioning and …
View the procurement »
2016-12-15Extension & Refurbishment of Scoil Mhicil Naofa Athy (Scoil Mhicil Naofa)
Construction of a two-storey extension and refurbishment of the existing two storey school including 12 No General classrooms, 5 No Special Needs classrooms, GP Hall, Library, Administration rooms and ancillary accommodation with a total combined floor area of c. 5 812 m². The proposed development is located on the site of the existing school and includes repairs to existing site boundary, new site access from Convent View, new car parking and set down area, 2 No new ballcourts and all other associated …
View the procurement »
2016-11-25Public Lighting Maintenance and Related Services Contract — Kilkenny/Carlow (Kilkenny County Council)
Public Lighting Maintenance and Related Services Contract — Kilkenny/Carlow.
The Contract is for the repair and maintenance of public lighting equipment and related services in Counties Kilkenny and Carlow on behalf of Kilkenny and Carlow County Councils.
Time-scale: The Maintenance Contract will initially operate for a 2 year period. Subject to continued satisfactory compliance with the terms of the Contract, the Contract may be renewed on an annual basis up to a maximum period of 2 years.
View the procurement » Mentioned suppliers:SSE Airtricity Solutions
2016-11-23UCD Heritage Houses Capital Works (University College Dublin ( UCD ))
University College Dublin (UCD) wishes to establish a multi party framework agreement for Main Contractor Works to UCD Heritage Houses Capital Works with an initial contract Ulysses Centre at Newman House. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Mechanical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Mechanical Services/Works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works — Electrical (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Electrical Services / works. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-23UCD Heritage Houses Capital Works (University College Dublin (UCD))
University College Dublin wishes to establish a multi party framework agreement for various Specialists — Mechanical, Electrical, Vertical Transportation (lifts) and Facade Reserve. This competition relates to Facade Reserve Specialist. Full details available to download from www.etenders.gov.ie
View the procurement »
2016-11-10LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Contract (Irish Water)
LLVRSS Leixlip Transfer Pipeline and Wastewater Network Upgrade Project involves the Design and Build of the following (but not limited work) works:
— Approximately 3.3km of 560mm HDPE PE100 SDR 17 rising main (ranging in depths up to 2.1m deep).
— Approximately 1.1km of 750mm concrete sewers (ranging in depths up to 6m deep).
— Approximately 7.9km length of twin 630mmOD PN16 HDPE SDR 11 rising mains (ranging in depths up to 5m deep).
— Four trenchless crossings:
— River Rye: 750mm 70m bore.
— M3: 1500mm …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 sqm.
View the procurement »
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Electrical Specialist... (Curragh Racecourse Ltd)
The electrical services contract comprises of the following systems; i) Electrical power distribution, incorporating medium/low voltage switchgear, incorporating uninterruptible power supplies, generators, metering and fault detection, ii) General and emergency lighting, incorporating a DALI addressable lighting control system, iii) Information and communication technology structured cabling, fire detection and alarm system incorporating public address/voice evacuation, iv) General services and small …
View the procurement » Mentioned suppliers:Mercury Engineering
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package — Lifts & Escalators... (Curragh Racecourse Ltd)
The vertical transportation services at the new Curragh Racecourse development comprise of the following;
i) Passenger Lift Services
— 1 No. VIP 1 000 kg 13-person
— 1 No. Public lift 1 000 kg 13-person.
— 1 No. Public passenger lift 1 275 kg 17 person
ii) Goods Lift Services
— 1 No. dirty goods lift 1 400 kg
— 1 No. clean goods lift 5 000 kg.
Five escalators shall also be provided, 2 No. serving level 00 and level 01, 2 No. serving level 01 and level 02 and 1 No. serving level 02 and 03.
Note the …
View the procurement » Mentioned suppliers:Kone Ireland Limited
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-09-30New Acute Mental Health Unit at Sligo University Hospital (Health Service Executive (HSE))
The works consist of the construction of a new part single storey and part 2 story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3 500 sqm. Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure …
View the procurement »
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »
2016-09-10Fibre Maintenance and Installation (Ervia)
It is envisaged that these services will be included in the single party framework, but not be limited to, the following:
— Cable installation;
— Cable removal;
— Fibre splicing and Terminating;
— Fibre testing;
— Splice joint installation and associated works;
— Splice joint repair;
— Duct and sub-duct supply, installation, proving and testing;
— Provision of photographic records both prior to and post each day's activity on site;
— Emergency maintenance works;
— Standby and Emergency Cover;
— Provision …
View the procurement » Mentioned suppliers:Total Splicing Solutions Limited
2016-09-02Establishment of Small Works Construction Framework (Irish Prison Service)
2.3 The purpose of this Competition is to conclude frameworks (the “Frameworks) for each geographical region for the execution of construction of works within the Prisons Estate as more particularly described hereunder at Part 5 of this Establishment Document (the “Works”). The 5 highest ranking Tenderers shall each be awarded a place on the Framework for the Lot applied for and invited to tender for works between 6 000 EUR and 500 000 EUR (ex VAT) in value. Tenderers can compete for a maximum of 2 Lots. …
View the procurement »
2016-08-31Provision of Telecommunication Services (An Post)
An Post is seeking to enter into a Single Party Framework Agreement for each of the following Lot's for a period of 3 (three) years with an option to extend for a period up to a further 2 (two) years.
Lot 1: Provision of Fixed Voice Services;
Lot 2: Provision of Fixed and Wireless WAN Data Services;
Lot 3: Provision of Data Centre Metro and Mail Centres Data Services;
Lot 4: Provision of Mobile Data and Voice for Postal Operatives;
Lot 5: Maintenance and Support of Cabling Infrastructure.
The tender will …
View the procurement » Mentioned suppliers:EircomPower Communications LtdVodafone Ireland
2016-08-05Procurement of Works Contractor for UCC Student Hub at University College Cork (University College Cork (UCC))
The development will consist of the construction of a 6 storey Student Hub Building within the university campus adjoining College Road and Gaol Walk, Cork. The building will be used to provide student and administrative services and flexible learning spaces. The gross floor space will be 3 991 m .The proposed works will involve demolitions, alterations and extensions to the existing Windle Building, the removal of some existing car parking spaces and the provision of new hard and soft landscaping and lighting.
View the procurement » Mentioned suppliers:JJ Rhatigan & Co
2016-07-27Killala, Foxford and Charlestown Sewerage Schemes — Wastewater Treatment Plants and Collection Networks — Design,... (Irish Water)
Irish Water proposes to construct new Wastewater Treatment Plants (WWTP) at Killala and Foxford and undertake upgrade works on the Charlestown WWTP and collection networks (including pumping stations) including:
— Foxford;
— Charlestown;
— Killala.
The Contract will include for operation and maintenance of the existing Charlestown WWTP during the design-build period and will also include for operation and maintenance of some elements of the completed works (primarily the WWTPs) for a 2 year period after …
View the procurement » Mentioned suppliers:Glan Agua
2016-07-2016/167 — Blanchardstown Regional Drainage Scheme (BRDS) — 9C Sewer Duplication and Storage Contract (Irish Water)
Irish Water plan to undertake the duplication of the existing 9C sewer and associated storage as part of the Blanchardstown Regional Drainage Scheme (BRDS) project. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design Build (‘DB’).
Contract with a 24 month Operation Service period with a possibility to extend to 48 months.
Further …
View the procurement » Mentioned suppliers:Ward and Burke Group Ltd