Procurements: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (page 7)
2019-08-2019/122 — Beattock Compressor Station Upgrades (Ervia)
Contract for the construction of facility upgrades/modifications at GNI UK Beattock Compressor Station in Scotland.
The scope will include the construction, installation, commissioning and certification of the new temporary bypass tie-ins, splitting of suction and discharge headers, suction throttling facility and AGI DCS control system integration. The works will require interfaces with existing site infrastructure and equipment such as the suction and discharge headers, existing pipework, compressor …
View the procurement » Mentioned suppliers:Murphy International Ltd
2019-08-01Removal of Sludge and Hazardous Waste (Dublin Bus/Bus Atha Cliath)
Dublin bus require a service provider for the removal of sludge and hazardous waste from its fleet maintenance depots.
This will involve the cleaning of interceptors and the disposal of waste oil, oil filters, batteries, etc. The service will be required in eight Dublin locations.
The contract will operate as a single party framework agreement and run for 36 months with an option to extend for 2 further periods of 12 months.
The advertised value of the contract was estimated for a 5-year period.
View the procurement »
2019-07-08Liberty Square Enhancement Scheme — Main Works (Tipperary County Council)
The liberty square enhancement scheme works comprise:
— widening of existing footpaths in liberty square and provision of pedestrian crossing points (including one controlled pedestrian crossing in liberty square),
— re-configuration of existing carriageway in Liberty Square (N75),
— removal of existing car parking spaces from Liberty Square and construction of lay-bys for parking, loading and taxi rank,
— construction of an off-street public car park (approx. 100 spaces) and reconfiguration of existing …
View the procurement » Mentioned suppliers:David Walsh Civil Engineering Ltd
2019-07-0518/167 — Transmission Pipeline Emergency Response and Repair Services (Ervia)
Provision of emergency response and repair services including materials and equipment for the natural gas high-pressure onshore Ireland transmission network located in the Republic of Ireland (Refer to Appendix 3 of this PQQ for general network map).
Gas Networks Ireland (GNI) requires a single supplier agreement to provide the services as outlined in the scope of work.
For more information please refer to PQQ Document.
View the procurement » Mentioned suppliers:National Gas Transmission Plc
2019-07-04Construction of a New Carpark, Drainage Works, Public Lighting, Linemarking, Landscaping and all Ancillary Works @... (Carrick National School)
Project entails:
1) Laying of Type A granular material over the entire carpark site to levels shown on drawing 19-096-DWG-01. 1 layer of geogrid TX160 at base and 1 layer of Geogrid TX150 300 mm above base;
2) Installation of kerbing around the exterior of the carpark;
3) Installation of a drainage network (drainage channel, manhole, petrol interceptor);
4) Laying of a 125 mm base layer over the carpark;
5) Laying of a 60 mm wearing course over the carpark;
6) Installation of public lighting;
7) …
View the procurement »
2019-07-01Extension to IDA Infrastructure, Mullagharlin, Dundalk, Co. Louth (IDA Ireland)
The proposed works will comprise of the extension of the existing access road and utility infrastructure to facilitate the development of IDA Ireland’s 44,5 ha site at Mullagharlin, Dundalk, Co. Louth.
The works will include road construction (including 2 No roundabouts), footpaths, drainage, SuDS, foul pumping station (reinforced concrete tank and control building), rising mains, street lighting, utilities, signage, road markings and landscaping including screening mounds, deep excavations/trenchless …
View the procurement »
2019-06-11Provision of Cycling Design Office Services (National Transport Authority)
The core objective of the services is the provision of a cycling design office providing design services to assist in the delivery of cycling projects.
It is intended that the cycling design office will be based in the NTA’s offices. It will comprise of a number of personnel provided by the Service Provider (SP) and based in these offices, supplemented by off-site resources also provided by the SP.
The primary role of the office will be to develop various cycle schemes through the design and planning …
View the procurement » Mentioned suppliers:AECOM Ireland Ltd
2019-05-22N11 Parallel Service Road (Wicklow County Council)
Construction of a segregated service road on the southbound carraigeway of the N11 Parallel Service Road at Kilmacanoge between Junction 7 (Bray South) and Junction 8 (Kilmacanoge). The works will include carriageway widening into the central reserve by up to 3 m over a distance of 1,7 km, provision of 2 sign gantries, alterations to existing services, replacement of safety barrier and associated traffic management.
View the procurement »
2019-04-30Hazardous Waste Disposal (Irish Naval Service)
The Irish Naval Service request economic operators to submit responses for the service of the removal of hazardous waste from the Naval Base Haulbowline as part of the tender documents attached.
View the procurement » Mentioned suppliers:Enva
2019-04-25Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works.
Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2).
This RFI seeks to …
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-04-23N67 Ballinderreen to Kinvara Phase 2 Road Realignment (Galway County Council)
The N67 Ballinderreen to Kinvara Road Realignment Scheme consists of the improvement of approximately 3 km of the N67 National Secondary Road between Ballinderreen and Kinvara. Galway County Council is advancing this road re-alignment, which includes:
— approx. 3 km,
— re-alignment of 7 side road junctions,
— various reconfigured accommodation works accesses,
— the scheme comprises of online widening with some sections of off-line construction,
— combined Cycletrack and Footway,
— various retaining walls.
View the procurement » Mentioned suppliers:Fox Building and Engineering Ltd
2019-04-10Establishment of a Multi-Party Framework Agreement for Civil Engineering and Utility Works Contractors for Projects... (University College Dublin (UCD))
UCD are establishing a Multiple Operator Framework for Civil Engineering and Utility Works Contractors for projects in excess of 1 250 000 EUR. The framework agreement will be in operation for 4 years. The indicative works envisaged comprise of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement …
View the procurement »
2019-03-27UCD are Setting Up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors (University College Dublin (UCD))
UCD are setting up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors for large scale contracts.It is envisaged that the scope of works will typically consist of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement works, landscaping works, road, carpark and path …
View the procurement »
2019-03-20N56 Drumbeigh to Inver Road Scheme (Donegal County Council)
Construction of 2,42 km of single lane carriageway split approx. 50/50 between online/offline alignment. The works also include site clearance, fencing, safety barriers, drainage, earthworks, pavements, kerbs and paved areas, road signs and markings, public lighting and electrical work associated therewith, CCTV survey of drains, landscaping, contractor designed structures, accommodation works, services ducts for Utilities and watermain works including temporary diversion.
View the procurement » Mentioned suppliers:Wills Bros Ltd
2019-03-06WH9601 — Westmeath County Council Framework for Pavement and Associated Minor Works on National Roads (Westmeath County Council)
The Procuring Authority on behalf of Westmeath, Longford and Offaly County Councils wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for Transport Infrastructure Ireland (TII) funded road schemes.
The number of works Contracts awarded under the framework in a year is unlikely to exceed 20. Typically, the value of each works contract would approximately range from 100 000 EUR to 1 000 000 EUR. The values and number of works …
View the procurement »
2019-03-04Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement » Mentioned suppliers:McGinty and O'Shea Ltd
2019-02-25Construction of a Food Innovation and Incubator Hub Campus (BIA Innovator Campus CLG)
Construction of a food innovation and incubator Hub Campus at Mellows, Teagasc Campus, Athenry, Co. Galway. The Campus consists of the construction of 3 separate buildings: Building 1 — BIA EOLAS/BIA OBAIR — construction of a 2 storey Learning Centre (1 200 m Gross Floor Area), Building 2 H.P.S.U. Units — construction of a single storey building (700 m Gross Floor Area), Building 3 — Incubation Units — single storey building (700 m Gross Floor Area) and general site works.
View the procurement » Mentioned suppliers:Glenman Corporation Ltd
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2019-02-20Provision of Water Management Services (St Vincent's University Hospital)
St Vincent’s University Hospital (SVUH) wishes to engage a service provider (the Operator) to provide a complete water management service, including full time technician dedicated to SVUH to be based on site; the facility of a call-out service; and day-works to support the hospital over a 24/7 period with maintenance management system.
View the procurement » Mentioned suppliers:Clearwater Compliance Ltd
2019-02-15Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document.
View the procurement »
2019-01-30Construction of New Distributor Road from Ongar to Barnhill, Dublin 15 (Fingal County Council)
The proposed Ongar to Barnhill Distributor Road is to be constructed south of Ongar and will provide improved access the Barnhill LAP lands. The proposed road includes the construction of a new bridge over the Clonsilla-M3 Parkway rail spur. There is to be approx. 1,1 km of dual carriageway road embankment of which only the southbound carriageway will be built out. There is to be a further approx. 1,2 km of single carriageway road built out to completion, including 2 No. signalised crossroads and 2 No. …
View the procurement »
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.
2018-12-17Aurora Civils Framework (Ervia)
Single supplier Framework Agreement for the completion of maintenance works on the existing network infrastructure, the design and construction of new customer connections and network extensions as required. The successful Applicants responsibilities will include but not be limited to:
— maintenance and emergency maintenance works,
— standby and emergency cover,
— telecommunications network design work and associated ancillaries,
— telecommunications duct network construction to include open trench, mole …
View the procurement » Mentioned suppliers:KN Network Services (Ire) Ltd
2018-12-11Ballycoolen to Forrest Little and Ballycoolen to Ratoath Trunkmain Scheme (Irish Water)
— Lot 1 Ballycoolen to Forrest Little Trunkmain Scheme: It has been identified that a new trunk main is required to augment the supply to North County Dublin and to ensure security of supply,
— Lot 2 Ballycoolen to Ratoath Trunkmain Scheme: It has been identified that a new regional trunk main is required to enable the transfer of available treated water between the Greater Dublin Area and Meath.
View the procurement » Mentioned suppliers:Roadbridge Ltd
2018-11-26Ballycoolen to Forrest Little Trunkmain Scheme (Irish Water)
The existing trunk main network capacity to the northern area of Fingal is considered deficient. The current peak demand for the supply area is in excess of the capacity of the existing trunk main. As a result, levels of service to customers in the area occasionally fall below desired levels. It has been identified that a new trunk main is required to augment the supply to this area and to ensure security of supply. This is also required to ensure that water supply does not hamper future development in the area.
View the procurement »
2018-11-15N52 Cloghan to Billistown Phase 2 — Turin to Billistown Realignment (Westmeath County Council)
The N52 Cloghan to Billistown Phase 2 — Turin to Billistown Realignment comprises the construction of 6,0 km of Type 1 Single Carriageway (S2) National Secondary road and associated works including:
(1) At grade junctions and links to existing road network;
(2) Accommodation works underpasses;
(3) Surface water drainage infrastructure;
(4) Utility diversions works, including ESB, Eir and Irish Water;
(5) Road signs, road markings and road studs;
(6) Site clearance and earthworks;
(7) Boundary treatment …
View the procurement » Mentioned suppliers:Fox Building and Engineering Ltd
2018-11-07Greater Dublin Drainage Project – Wastewater Treatment Plant and Abbotstown Pumping Station DBO Contract (Irish Water)
The WwTP and Abbotstown Pumping Station are the subject of this competition and will be constructed utilising a design, build and operate contract. Within the WwTP site, a second pumping station is required to lift the incoming North Fringe Sewer (NFS) intercepting pipeline to the inlet works. Scope of works for this competition — Detailed design and construction and Operation of a WwTP with an initial capacity of 500 000 PE to treat a Dry Weather Flow (DWF) of 112 500 m/day and a total sludge tonnage of …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Marine Outfall DB Contract (Irish Water)
Scope of Works includes for the design, build, testing and commissioning of the following•Approximately 2 km length of 2 000 mm internal diameter outfall pipeline, installed using tunneling methods and passing beneath Baldoyle Bay to Velvet Strand:
— approximately 4 km length of 2 000 mm internal diameter outfall pipeline, installed using dredging methods from Velvet Strand to approximately 1 km North East of Irelands Eye,
— outfall diffuser,
— dredge crossing/protection works of existing fibre optic …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Terrestrial Pipelines DB Contract (Irish Water)
The Scope of Works includes for the design, build, testing and commissioning of the following:
— orbital sewer from Blanchardstown, Dublin 15 in the NW of Dublin to the WwTP at Clonshagh (approximately 13,8 km),
—— approx. 1 km length of gravity pipeline through Connolly hospital installed using trenchless techniques (1 800 mm internal dia., c. 10 m depth),
—— approximately 5,4 km length of 1 400 mm dia. rising main,
—— approximately 7,4 km length of 1 800 mm dia. gravity pipeline,
— live connection of …
View the procurement »