2021-02-16   Supply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DAC (Shannon Airport Authority DAC)
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in … View the procurement »
Mentioned suppliers: SHENZHEN CIMC-TIANDA AIRPORT SUPPORT LTD
2021-01-13   Construction Works (Works Contractor) for the White Water Rafting Centre, George's Dock, Dublin 1 (Dublin City Council)
Dublin City Council (DCC) is inviting Expressions of Interest from applicants wishing to tender for the complete works including the specialist works, to build a new White-Water Rafting Centre (WWRC) in George's Dock, Dublin 1. Panel specialists will be named in tender documents issued to short-listed applicants. The WWRC will consist of the white-water rafting course, swift water rescue training facility, kayaking and canoe polo pool and urban street scene including a new plantroom building. On the … View the procurement »
2020-12-22   Head Quarters Building Fit Out (An Post)
This is a call to competition by An Post for the provision of fit out services for a new head quarters building in Dublin City (referred to below as the Site) (the ‘Contract’). An Post intends to procure a contract for the fit out of the category B new office fit-out, c. 100 000 sq., ft. (Net Internal Floor Area) over 6 floors and ancillary spaces including basement and ground floor spaces at the building. The building will be finished to a ‘shell and core with Category A fit-out, and this contract will … View the procurement »
2020-12-18   Framework Agreement for Greenway and Cycleway Civils, Paving and Ancillary Works in Co. Cork 2021 (Cork County Council)
Cork County Council, County Hall, Carrigrohane Rd, Cork is seeking submissions for the creation of a framework agreement with suitable contractors for Greenway and Cycleway Civils, Paving and Ancillary Works in Co. Cork 2021. View the procurement »
2020-11-30   Works at Aonad 8, Eastat Tionscail Casla, Casla, Co. na Gailimhe (Udaras Na Gaeltachta)
Works at Aonad 8, Eastat Tionscail Casla, Casla, Co. na Gailimhe. View the procurement »
2020-11-20   IDA Advance Building Solution, Limerick (IDA Ireland)
A new advanced building solution which is a 3 748 m (gross area) two storey building consisting of offices and light industrial/production spaces, designed to achieve LEED certification. Permission is also sought for a vehicular/pedestrian entrance, signage, new timber post-and-rail boundaries, car parking, cycle shelters, landscaping, gas skid, underground storage tank, ESB substation, switch room, access road and all associated site works. The greenfield site is well serviced and is in close proximity … View the procurement »
Mentioned suppliers: JJ Rhatigan & Company Unlimited Company
2020-06-18   Multi-party Framework Agreement for Carrying out Roadworks in a City and Suburban Environment for Contracts greater... (Dublin City Council)
Works will involve general road construction works including: — roadway construction and repairs (flexible, rigid and permeable paving), — footway construction, repairs and refurbishment (including concrete, bituminous, brick, flags, granite, etc.), — installation of kerbing and road channels, — road resurfacing and high friction antiskid surfacing and associated work including planing, regulation course, geogrids, etc., — other ancillary works including installation of ducts, — pipelaying, — diversion … View the procurement »
Mentioned suppliers: Cairn Construction Circet Networks (Ireland) Limited Clonmel Enterprises Ltd Jons Civil Engineering Company Limited Murphy International Limited Siac Construction Ltd. Wills Bros Ltd
2020-05-22   Provision for Major Construction/Works Framework Agreement (An Post)
An Post is seeking to tender for the creation of a multi-party framework covering the provision of the major construction/works agreement for standard build works which may be required by An Post during the life time of the agreement. View the procurement »
Mentioned suppliers: Dunwoody & Dobson Ltd Kilcawley Construction Moston Construction Stewart Construction Walls Construction Ltd
2020-03-25   Waterford City — North Quays Project- SAQ for Main Contractor (Waterford City and County Council)
Waterford City and County Council is seeking a contractor to construct an employer — designed project in the center of Waterford City. There are three distinguishable components to the project: — Road and Bridge construction/realignment of c.1 km of urban dual carriageway to provide access to the North Quays Strategic Development Zone (SDZ) which includes two new road bridges over a live rail line; — Sustainable Transport Bridge: A 207 m long 8 m wide steel bridge with lifting centre section connecting … View the procurement »
Mentioned suppliers: BAM Civil Ltd
2020-03-05   Multi-party Framework Agreement for Carrying out Roadwork Contracts 2021-25 (less than 1 million) (Dublin City Council)
Dublin City Council (DCC) will be facilitating the establishment of a multi-party framework agreement with multiple operators for contracts less than EUR 1.0 million on behalf of itself and the local authorities listed hereunder who will be parties to the framework. Dublin City Council Dun Laoghaire-Rathdown County Council (DLRCC) This framework may involve some of the following work elements: • installation of ducts, gullies, drainage pipes; • roadway repairs including potholes; • footway repairs and … View the procurement »
Mentioned suppliers: Actavo Ireland Limited (formerly Sierra... Cairn Construction Clonmel Enterprises Ltd Coffey Construction (I) Ltd. dmmorris ltd Jons Civil Engineering Company Limited KN Network Services Richard Nolan Civil Engineering Ltd
2020-02-19   Waterford City — North Quays Project — SAQ for Main Contractor (Waterford City and County Council)
Scheme includes 210 m long steel pedestrian bridge over river in SAC, train station including platforms, 2 road and 2 pedestrian bridges over railway, 800 m of realignment of existing dual carriageway and 250 m of new dual carriageway road; all in city center location to provide access to strategic development zone on the North Quays of Waterford City. View the procurement »
2020-02-07   Phase 1 Improvement Works to the Great Southern Greenway, Limerick (Limerick City and County Council)
The project involves improvement works to over 40 km of existing greenway which runs from Rathkeale to the Kerry border. The main components of works included in phase 1 are: — widening of the existing trail, — resurfacing of the existing trail, — drainage upgrades, — upgrade of farm crossing points, — repair of 5 No pedestrian bridges, — improvements to public and private road junctions, — construction of various ancillary works. View the procurement »
Mentioned suppliers: Roadbridge
2020-02-04   Supply and Installation of Lifts and Escalators and related Associated Works (Iarnrod Eireann-Irish Rail)
This is a call by IE for the establishment of a single lot, multi-vendor framework agreement for the supply and installation of lift and escalators and related services to Irish Rail and the CIE Holding Company. This requirement is being advertised in the Irish Government tendering website www.etenders.gov.ie on 4.2.2020 and subsequently in the OJEU. The current Iarnród Éireann lift and escalator landscape consists of 132 lifts and 11 escalators. It is anticipated that this framework agreement will be … View the procurement »
2020-02-03   Multi-Party Framework Agreement for the Provision of Basement Impact Assessment Auditor Services (Dublin City Council)
The successful tenderer (Auditor) is required to conduct a review of a basement impact assessment submission for compliance and adequacy and shall confirm whether the BIA has been completed and has addressed all DCC policies as specified and outlined in the Basement Development Policy and Basement Development Guidance documents. The Auditor is then required to prepare an audit report for submission to the DCC Environment and Transport (E&T) Department. A multi-party framework agreement to audit basement … View the procurement »
2020-01-29   Limerick Urban Centre Revitalisation — O'Connell Street (Phase 1) (Limerick City and County Council)
The proposed works provide for the redistribution of space on O’Connell Street from Denmark Street to Cecil Street, between various modes of transport and the public realm. There are currently two southbound traffic lanes on O’Connell Street between Denmark Street and Cecil Street. Kerbside activities are provided for along both sides of the street, including parking, disabled parking, taxi ranks, loading bays and bus stops. General parking occupies the majority of this space along the full length of the … View the procurement »
Mentioned suppliers: Shareridge Ltd
2019-12-20   Refurbishment and Extension of a Training Centre for the use of Waterford and Wexford Education and Training Board... (Waterford and Wexford Education and Training Board)
This project will include the refurbishment and extension of an existing industrial building. The existing building consists mainly of a single storey 2-bay portal framed clad unit approximately 4 550 m and the extensions will be approximately 550 m (approx. 5 100 m total development size). The building will be refurbished to cater for a change-of-use from industrial to an educational facility. The procurement authority for this contract is WWETB and the contract will be concluded with Gortrush … View the procurement »
2019-12-04   Main Contractor for the Deep Retrofit Refurbishment of Tom Johnson House (Office of Public Works (OPW))
The proposed works consist of deep retrofit to Tom Johnson House — an existing 1970s 5 storey over basement (with a plant room on the roof) office building of approx 10 500 m, located in Dublin 4. This is not a protected structure but is adjacent to several protected structures (former Beggar’s Bush Military Barracks). View the procurement »
2019-10-21   Extension and Construction Works (Coillte CGA)
Daingean GAA propose to construct a 2 storey extension and changing rooms to Daingean Sports Hall at Daingean, Co Offaly — please refer to documents for floor plans, layout, conditions of contract, etc. View the procurement »
2019-10-15   IDA Advance Technology Building Carlow (IDA Ireland)
This notice relates to the development of an advance technology building for IDA Ireland, designed to provide high quality production and office accommodation, which will accommodate future manufacturing/technological businesses. General description of the proposal — the construction and completion of advance technology building, including reinforced concrete (RC) foundations and ground floor slab, blockwork and RC rising walls, steelwork frame, composite metal cladding and curtain wall glazing, RC and … View the procurement »
Mentioned suppliers: Kilcawley Construction
2019-09-12   Public Sector Data Centre (Works) (Office of Public Works (OPW))
Refer to suitability assessment questionnaire (SAQ) QW1. View the procurement »
2019-09-06   Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: (a) the change of use of the Phase 1 sports and community building to a library and community building; (b) refurbishment of the existing sports building to create a new library; (c) the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-07-05   IDA Advance Technology Building at Mullgharlin, Dundalk (IDA Ireland)
This notice relates to the development of an Advance Technology Building for IDA Ireland, designed to provide high quality production and office accommodation, which will accommodate future manufacturing/technological businesses. General description of the proposal — the construction and completion of advance technology building, including Reinforced Concrete (RC) foundations and ground floor slab, blockwork and RC rising walls, steelwork frame, composite metal cladding and curtain wall glazing, RC and … View the procurement »
Mentioned suppliers: Kilcawley Construction
2019-07-05   Pre-Qualification of Contractors for IDA Advance Office Building at Finisklin, Sligo (IDA Ireland)
This notice relates to the development of an Advance Office Building for IDA Ireland at IDA Business and Technology Park Finisklin, Sligo designed to provide high quality office accommodation. The project involves the construction and completion of Advance Office Building, including Reinforced Concrete (RC) foundations and ground floor slab, blockwork and RC rising walls, steelwork frame, composite metal cladding, curtain wall glazing, RC and blockwork walls, stud partitions, composite floors and precast … View the procurement »
Mentioned suppliers: JJ Rhatigan and Company
2019-07-04   Construction of a New Carpark, Drainage Works, Public Lighting, Linemarking, Landscaping and all Ancillary Works @... (Carrick National School)
Project entails: 1) Laying of Type A granular material over the entire carpark site to levels shown on drawing 19-096-DWG-01. 1 layer of geogrid TX160 at base and 1 layer of Geogrid TX150 300 mm above base; 2) Installation of kerbing around the exterior of the carpark; 3) Installation of a drainage network (drainage channel, manhole, petrol interceptor); 4) Laying of a 125 mm base layer over the carpark; 5) Laying of a 60 mm wearing course over the carpark; 6) Installation of public lighting; 7) … View the procurement »
2019-06-10   Samuel Beckett Civic Campus Phase 2 (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following: (a) the change of use of the Phase 1 Sports and Community Building to a Library and Community Building; (b) refurbishment of the existing sports building to create a new library; (c) the construction of a new sports building, incorporating a 25 metre swimming pool, a … View the procurement »
2019-05-09   Redevelopment of Blocks K&L in the Shannon Free Zone, Shannon Co Clare. Construction of 3 No Advanced Manufacturing... (Shannon Commercial Properties DAC)
Construction of 3 No Advanced Manufacturing Units at Blocks K and L of approximately 153 000 ft. The buildings consist of a single storey high-bay industrial floor with ancillary office area and roof plant. Sites-works for all 3 buildings to include both a mix of new and upgraded vehicular entrances to service delivery/service yards and car parking spaces. The construction of new hard surfaced ancillary delivery/service yards, bicycle parking spaces, single storey refuse compounds, building signage, … View the procurement »
Mentioned suppliers: Conack Construction Ltd
2019-04-24   19/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following: A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11. This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. Please refer to PQQ document for scope of works. View the procurement »
2019-02-22   Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold... (Office of Public Works (OPW))
Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures for the OPW Event Management Unit. View the procurement »
Mentioned suppliers: Actavo Events (Ireland) Ltd
2019-02-15   Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following: A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11. This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document. View the procurement »
2019-02-13   Main Contractor — Development of Office Building at Leeson Lane, Dublin (The Commissioners of Public Works in Ireland)
The development will consist of: 1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445 m in area; 2) The construction of a new 7 storey (over basement) office building of c.6 333 m; 3) Site development works include hard landscaping, boundary treatment and all other ancillary site works. View the procurement »
2018-10-10   Mixed Tenure Residential Development at Ballymastone, Donabate, Co. Dublin (Fingal County Council)
The project is for the development of a site at Ballymastone, Donabate, Co. Dublin for a sustainable mixed tenure residential development, in accordance with the Fingal County Development Plan 2017 — 2023 and the Donabate Local Area Plan 2016 — 2022 and applicable planning legislation. View the procurement »
Mentioned suppliers: Glenveagh Living Limited
2018-09-25   construction of a New Railway Station and Pedestrian Footbridge Over the Royal Canal at Pelletstown (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE to award a contract for the construction of a new railway station at Pelletstown, located mid-way between Broombridge and Ashtown Stations on the Connolly to Maynooth Line, plus the construction of a pedestrian footbridge with access steps and ramps over the Royal Canal. It is anticipated that works will commence on site in May 2019, with an estimated completion date of November 2020. A pre-qualification questionnaire is attached to this notice and must be downloaded, … View the procurement »
Mentioned suppliers: John Sisk and Son (Holding) Ltd
2018-09-03   Expressions of Interest and Pre-qualification Questionnaire for the Commercial Development and Operation of The... (South Dublin County Council)
South Dublin County Council intends to award a Development agreement to the preferred bidder in respect of the development and operation Commercial development and operation of a c 0,35 HA site at ‘The Castle Stables and Courtyard at Rathfarnham’, Dublin 14 which shall include design, finance and construction. Upon satisfaction of the conditions set out in the Development agreement, South Dublin County Council intends to enter into a Long Term Lease Agreement for one hundred and fifty (150) years with … View the procurement »
2018-07-09   Multi Supplier Framework for the provision of Capital Works to Ervia (Ervia)
The framework agreement will establish the terms governing contracts to be awarded during the term of the framework agreement. The framework agreement will be established for a term of 4 years with the option to extend for a further 1-year period at the sole discretion of Ervia. Ervia currently has a building estate comprising of over 20 office buildings nationally, ranging in size from 250 m to 5 000 m. This portfolio is expected to grow substantially as part of the transformation programme being … View the procurement »
Mentioned suppliers: Conack Construction Ltd Cumnor Construction Ltd Glenman Corporation Ltd Kilcawley Building and Civil Engineering (Sligo) Maida Builders Ltd t/a Hanrahan Builders Walls Construction Ltd
2018-06-26   Minor Building Works — HSE Acute Hospital Environments (Health Service Executive (HSE))
The HSE as Contracting Authority is coordinating the establishment of a Framework Agreement of Minor Building Works Contractors for acute hospital environments. View the procurement »
Mentioned suppliers: See successful applicants file on the...
2018-06-05   A Contractor to provide building works and PSCS services for the fit-out of Fitzwilliam 27 (Building B) at ESB site... (Electricity Supply Board (ESB))
The Contracting Entity intends to procure a contract for the fit-out of Fitzwilliam 27 (Building B) of the new office development, c. 15 000 m (Net Internal Floor Area) of Grade A office / mixed use development on the Site at 27 Fitzwilliam Street Lower, Dublin 2 comprising part of a city block bounded by Fitzwilliam Street Lower to the west, Mount Street Upper to the north, James’s Street East to the east and Baggot Street Lower to the south. The building will be finished to a “Grey Box” standard by the … View the procurement »
Mentioned suppliers: Walls Construction
2018-04-23   Dublin Bus Broadstone Garage Project (Dublin Bus / Bus Atha Cliath)
Alteration, recladding and insertion of new roller shutters to an existing asbestos clad steel framed structure of 1250 m. View the procurement »
Mentioned suppliers: Purcell Construction Limited
2018-04-17   RDI Hub Design Led Innovation and Digitization Project (RDI Hub CLG)
This project relates to the refurbishment and complete fit-out of an existing building (including all associated specialist works incorporating mechanical and electrical works) at Anglont, Killorglin, Co Kerry in order to enable the consortium (RDI Hub CLG) to conduct its design led innovation and digitisation activities. View the procurement »
Mentioned suppliers: Vision Contracting Ltd
2018-01-29   Mixed Use Development at Dominick Street Lower, Dublin 1 (Dublin City Council, Housing and Community Services)
Works contract for a mixed use inner city development in Dominick Street Lower, adjoining neighbouring buildings, public roads and the LUAS. The development will be an exemplar for apartment living and social housing, built and finished to the highest quality and standards of materials and workmanship. It will comprise: 5 no. townhouses, 67 no. apartments over ground floor commercial and community uses, a basement car park, a community garden, public realm and pavement works. A piling solution is … View the procurement »
Mentioned suppliers: Duggan Brothers (Contractors) Ltd
2017-12-18   North City Operations Depot Procurement of Works Contractor and PSCS (Dublin City Council)
North City Operations Depot Procurement of Works Contractor and PSCS. For further information please consult the associated documentation, which is available to download from www.etenders.gov.ie RFT ID 128151 View the procurement »
Mentioned suppliers: Purcell Construction
2017-12-13   Pearse Station Roof Project (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for renovation works to the existing roof at Pearse Railway Station, Dublin 2. Iarnród Éireann (IÉ), a subsidiary of Córas Iompair Éireann (CIÉ) — (a statutory body which provides bus and rail public transport for passengers and rail freight services) will shortly be issuing a tender on a design & build basis for the replacement of the existing supporting structure and roof covering to Pearse Railway Station, Westland Row, Dublin 2, Ireland. Pearse Station is a railway … View the procurement »
Mentioned suppliers: John Sisk and Son (Holdings) Ltd
2017-09-04   ESB Great Britain Wind Farms Electrical Balance of Plant Framework (Electricity Supply Board ( ESB ))
Please note: this notice is published on a voluntary basis for advertisement purposes. This procurement competition is to establish a framework agreement. ESB is now seeking expressions of interest for the provision of works, supplies and services related to electrical balance of plant for wind farms acquired or built in Great Britain (G.B.) during the term of this Framework, including Joint Venture or subsidiary developments. Please refer to the pre-qualification documentation for a further details. View the procurement »
2017-08-31   Pre-qualification for Specialist Office Fit-out Works for the NTMA at No 1, Dublin Landings, North Wall Quay, Dublin 1 (National Treasury Management Agency (NTMA))
The National Treasury Management Agency (NTMA) is seeking submissions from suitably qualified and experienced Contractors to pre-qualify for Specialist Office Fit-out Works for the NTMA at No 1, Dublin Landings, North Wall Quay, Dublin 1. Please see the Suitability Assessment Questionnaire (SAQ) attached to this notice for further information. View the procurement »
Mentioned suppliers: Mac-interiors Limited
2017-08-23   Pre-Qualification of Contractors for Construction of Advance Technology Building at IDA Parkmore Business and... (IDA Ireland)
This Questionnaire relates to the development of an Advance Technology Building for IDA Ireland, designed to provide high quality production and office accommodation, which will accommodate future manufacturing/technological businesses. View the procurement »
Mentioned suppliers: J.J Rhatigan and Company
2017-08-18   Single Party Framework Agreement for the Supply, Delivery and Installation of Sanitation Units for Traveller... (Dublin City Council)
Dublin City Council proposes to establish a framework agreement and enter into an initial contract for a period of two years and an option to extend on an annual basis for a maximum of an additional two years with the preferred bidder. This tender is for the Supply, Delivery and Installation of Sanitation Units (4.88m x 2.6m) to Dublin City Council (DCC), South Dublin County Council (SDCC), Dún Laoghaire-Rathdown County Council (DLRCC) and Fingal County Council (FCC). The delivery will be made to the … View the procurement »
Mentioned suppliers: Accommodation and Building Systems
2017-05-23   Tender for the Provision of a Retail Development at Main Street/ Quinnsboro Road/ Florence Road Bray (Wicklow County Council)
In June 2016, the Council lodged a planning application with An Bord Pleanala seeking approval for a development of shopping centre in Florentine, Bray, Co. Wicklow. The Council's vision is for the centre to be a driver for the regeneration and rejuvenation for the commercial centre of Bray. A key aim will be to attract established fashion retailers to the centre, with shops of a size necessary to achieve this. WCC now wish to conduct a competition for the Design and Provision of Retail Development at … View the procurement »
2017-05-11   Social Housing PPP Bundle 1 — Contract Notice PIM PQQ (National Development Finance Agency)
Following on from the Prior Information Notice (‘“PIN”’) (TED Reference 2017/S 074-141031), the National Treasury Management Agency, describing itself as the National Development Finance Agency, acting for and on behalf of the Department of Housing, Planning, Community and Local Government (‘DHPCLG’) (as Sanctioning Authority ) and Dublin City Council (‘“DCC”’) (as Sponsoring Agency), intends to procure the Social Housing PPP Bundle 1 (the Project) to design, build, finance, operate and maintain six … View the procurement »
Mentioned suppliers: Comhar Housing Ltd