2020-02-28Schools Remediation Programme (Department of Education and Skills)
The Minister for Education and Skills (the Contracting Authority), intends to establish a multi-party framework, of suitably qualified and experienced building contractors to deliver works contracts for the structural and architectural remediation and associated works of an envisaged 18 number schools across Ireland (Package B). It is intended that each works contract will comprise of a number of schools. Applicants should note that further/fewer projects may be carried out under the framework at the …
View the procurement » Mentioned suppliers:Duggan Brothers LtdFlynn Management & ContractorsJohn Sisk & Son (Holdings) Ltd
2020-02-28Coonagh to Knockalisheen Distributor Road Scheme — Main Works Contract (Limerick City and County Council)
The proposed works include:
— 2.2 km of new urban dual carriageway road with 2 x 7.0 m carriageways, footways, cycleways, verges and embankment construction works up to 9.0 m high and in cuttings 1.5 m deep;
— 0.6 km of new urban single carriageway road with footways, cycleways and verges;
— 2.0 km of major improvements to an existing urban single carriageway road with footways, cycleways and verges;
— 1.0 km of minor improvements to existing rural single carriageway roads;
— 2 road over railway bridges …
View the procurement » Mentioned suppliers:Roadbridge
2020-02-27Design, Construction and Maintenance new Electronic Parking Guidance System for Killarney Town (Kerry County Council)
Under this contract the successful tenderer shall be responsible for: the design, supply, installation, testing and commissioning of a new electronic parking guidance system (PGS) for Killarney Town, Co. Kerry and delivery of a service maintenance contract for the newly installed variable messaging signage, parking control/vehicle detection units and instalation software.
The successful tenderer will be required to act as project supervisor design process ‘PSDP’ and project supervisor construction stage …
View the procurement »
2020-02-19GMIT (CUA) Single Operator Framework Agreement Telecoms 2020 (Galway Mayo Institute of Technology)
GMIT wishes to establish a single party framework for Landline, PRA (initially), migrating to SIP and associated equipment supply, delivery, core equipment installation, project management and maintenance services.
Please note that the following contracting authorities may use this framework throughout its’ lifetime (within the 10 years). However, it is not envisaged that Letterkenny Institute of Technology and Institute of Technology Sligo will utilise this framework within the first 12 months.
— …
View the procurement » Mentioned suppliers:Hibernia Services Trading as Evros...Vodafone Ireland Ltd
2020-02-19Waterford City — North Quays Project — SAQ for Main Contractor (Waterford City and County Council)
Scheme includes 210 m long steel pedestrian bridge over river in SAC, train station including platforms, 2 road and 2 pedestrian bridges over railway, 800 m of realignment of existing dual carriageway and 250 m of new dual carriageway road; all in city center location to provide access to strategic development zone on the North Quays of Waterford City.
View the procurement »
2020-02-11DCU Glasnevin Campus Future Tech Building — Main Contractor (Dublin City University (DCU))
The aim of this project is to create an iconic, sustainable building focused around the school of health and human performance, other STEM subjects and general teaching facilities at the heart of the Dublin City University Glasnevin campus.
The building is anticipated to contain six levels including a small basement for heavy plant as well as mezzanine levels between ground and first floor.
The building is designed to comply with NZEB, EXEED design and BREEAM Excellent ratings.
View the procurement »
2020-02-07Phase 1 Improvement Works to the Great Southern Greenway, Limerick (Limerick City and County Council)
The project involves improvement works to over 40 km of existing greenway which runs from Rathkeale to the Kerry border. The main components of works included in phase 1 are:
— widening of the existing trail,
— resurfacing of the existing trail,
— drainage upgrades,
— upgrade of farm crossing points,
— repair of 5 No pedestrian bridges,
— improvements to public and private road junctions,
— construction of various ancillary works.
View the procurement » Mentioned suppliers:Roadbridge
2020-02-06Construction of a New 50 Bed Community Nursing Unit (CNU) at Tyone, Nenagh (Health Service Executive (HSE))
The development of this new 50 bed community nursing unit and associated landscaping/parking, at Tyone, Nenagh is to provide elderly care accommodation containing 50 bedrooms, to replace the existing St Conlon’s facility which currently has a capacity of 27 beds.
The new 50 bed community nursing unit is to be located on the 2,6 hectacre site, directly adjacent to the Nenagh Hospital campus, which has been selected to provide sufficient space provision for the construction of the new CNU and to also help …
View the procurement »
2020-02-05Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2020-02-05Merlin Park University Hospital Galway — Orthopaedic Theatres Mechanical Services (Health Service Executive (HSE))
The MPUH Orthopaedic Theatres comprise 711,90 m of clinical accommodation on the ground with an enclosed plant room of 342m2n over head. There are 2 stand alone structures associated with the development including a generator and gas storage compound. Due to the falls across the site a retaining wall is required to carry the path on the south side and a fire tender/waste collection road will also link to the internal MPUH road network.
It is intended that the works will be executed on a live Healthcare …
View the procurement »
2020-02-05Merlin Park University Hospital Galway — Orthopaedic Theatres Electrical Services (Health Service Executive (HSE))
The MPUH Orthopaedic Theatres comprise 711,90 m of clinical accommodation on the ground with an enclosed plant room of 342m2n over head. There are 2 stand alone structures associated with the development including a generator and gas storage compound. Due to the falls across the site a retaining wall is required to carry the path on the south side and a fire tender/waste collection road will also link to the internal MPUH road network.
It is intended that the works will be executed on a live Healthcare …
View the procurement »
2020-02-04Supply and Installation of Lifts and Escalators and related Associated Works (Iarnrod Eireann-Irish Rail)
This is a call by IE for the establishment of a single lot, multi-vendor framework agreement for the supply and installation of lift and escalators and related services to Irish Rail and the CIE Holding Company. This requirement is being advertised in the Irish Government tendering website www.etenders.gov.ie on 4.2.2020 and subsequently in the OJEU.
The current Iarnród Éireann lift and escalator landscape consists of 132 lifts and 11 escalators. It is anticipated that this framework agreement will be …
View the procurement »
2020-02-03Multi-Party Framework Agreement for the Provision of Basement Impact Assessment Auditor Services (Dublin City Council)
The successful tenderer (Auditor) is required to conduct a review of a basement impact assessment submission for compliance and adequacy and shall confirm whether the BIA has been completed and has addressed all DCC policies as specified and outlined in the Basement Development Policy and Basement Development Guidance documents. The Auditor is then required to prepare an audit report for submission to the DCC Environment and Transport (E&T) Department.
A multi-party framework agreement to audit basement …
View the procurement »
2020-02-02Merlin Park University Hospital Galway — Orthopaedic Theatres Main Contract (Health Service Executive (HSE))
The MPUH Orthopaedic Theatres comprise 711,90 m of clinical accommodation on the ground with an enclosed plant room of 342m2n over head. There are 2 stand alone structures associated with the development including a generator and gas storage compound. Due to the falls across the site a retaining wall is required to carry the path on the south side and a fire tender/waste collection road will also link to the internal MPUH road network.
It is intended that the works will be executed on a live healthcare …
View the procurement »
2020-01-31LEE764C — EPA — RFT for the Contract for Services for the NRMN Renewal Project (Education Procurement Service (EPS))
The Environmental Protection Agency (EPA) wishes to source and appoint a contract for services to provide a suitably qualified and experienced full-time resource to act as a project management co-ordinator and liaison. The bulk of this role will be in project coordination to implement the National Radiation Monitoring Network (NRMN) and to manage and create contacts and work on logistics and telemetry/telecomms to adapt new and existing partners into the renewed NRMN. Additional duties will include …
View the procurement » Mentioned suppliers:Inhouse Technologies Ltd
2020-01-31Extension, Refurbishment and Alteration Works to Kinsale Community Hospital (Health Service Executive (HSE))
The Health Service Executive now propose a new extension to Kinsale Community Hospital, with and including internal alteration and refurbishment works to comply with statutory regulation SI 415/2013 and SI 293/2016.
Works comprise new build accommodation comprising 14 No single occupancy bedrooms with ensuite facilities, recreation room, sitting room, physiotherapy room, quiet sitting room, nurse base and CNM office; also internal refurbishment of existing ward accommodation, ancillary support rooms, …
View the procurement »
2020-01-31Thermal Upgrade and Refurbishment Works Contractor Framework (Limerick City and County Council)
Limerick City and County Council intends to establish a contractor framework panel to carry out thermal upgrade and refurbishment works to residential units, mixed use units largely within regeneration areas in Limerick city. Interested contractors are now invited to express an interest by responding to this Stage 1 — Pre-qualification process. There will be a maximum of 8 No framework participants. For further information refer to the enclosed documents.
View the procurement » Mentioned suppliers:Henry Connolly Builder Ltd
2020-01-29Academic Hub Reserved Specialist 2 (Grangegorman Development Agency)
Academic Hub Library Complex procurement of works contractor and reserved specialists. Works includes new build and conservation works to an existing structure.
The initial phase of the TU Dublin Academic Hub and Library Complex is planned as a cluster of buildings and courtyards, both existing and new around the historic North House protected structure. The library and student support complex will sit at the heart of the new Grangegorman campus, addressing a large plaza and commanding views over the …
View the procurement »
2020-01-29Limerick Urban Centre Revitalisation — O'Connell Street (Phase 1) (Limerick City and County Council)
The proposed works provide for the redistribution of space on O’Connell Street from Denmark Street to Cecil Street, between various modes of transport and the public realm. There are currently two southbound traffic lanes on O’Connell Street between Denmark Street and Cecil Street. Kerbside activities are provided for along both sides of the street, including parking, disabled parking, taxi ranks, loading bays and bus stops. General parking occupies the majority of this space along the full length of the …
View the procurement » Mentioned suppliers:Shareridge Ltd
2020-01-21Proposed Extension, Refurbishment and Alteration Works to Macroom Community Hospital (Health Service Executive (HSE))
The Health Service Executive now proposes a new extension, with and including internal alteration and refurbishment works to comply with statutory regulation SI 415/2013 and SI 293/2016 at Macroom Community Hospital.
Accommodation comprises 22 No new build single occupancy bedrooms, 1 No new build double bedroom and 14 No refurbished beds all with ensuite facilities, residents family room, residents and visitors meeting room, ancillary support rooms, dinning room, store rooms, dirty utility rooms, …
View the procurement »
2020-01-21The N5 Ballaghaderreen to Scramoge Road Project (Roscommon County Council)
The N5 Ballaghaderreen to Scramoge Road Project comprises the design and construction of 34 km of Type 1 single carriageway from the tie-in point of the N5 Ballaghaderreen Bypass in the west, passing to the south of the village of Frenchpark, before crossing the existing N5 and passing to the north of Bellanagare and Tulsk villages. The route then passes to the north of Clooncullaan Lough, before turning in a southerly direction to pass east of Strokestown before re-connecting to the existing N5 at Scramoge.
View the procurement » Mentioned suppliers:Roadbridge
2020-01-17Rockcorry Scoil Mhuire Roll No 10429W — Extension and Refurbishment — M+E Engineers (Cavan and Monaghan Education and Training Board)
New build (2-storey)
5 x classrooms including WCs and storage (80 m)
1 x library and resourse area combined including storage (60 m)
1 x multipurpose room (20 m)
1 x general office (15 m)
1 x staff room (20 m)
1 x universal accessible toilet/shower for assisted users (10 m)
1 x adult toilets (4 m)
1 x general storage (20 m)
1 x DCC and electrical (4 m)
1 x boiler house (9 m).
Refurb existing building
1 x general purpose room (140 m)
1 x general purpose room servery (8 m)
1 x P.E. equipment store (15 m)
1 …
View the procurement »
2020-01-14West Quad Development (Grangegorman Development Agency)
This is a key strategic project; part of current and future programmes of works by the GDA, on behalf of Technological University Dublin (TU Dublin) at the TU Dublin City Campus, Grangegorman. The c.21 000 sm/7-storey West Quad will comprise new third-level learning and working space, as well as TU Dublin's University exam and conferring hall.
View the procurement »
2020-01-14L.É. RÓISÍN Design of Galley Layout, Fit-out and Supply and Installation of Galley Equipment (Department of Defence)
Galley design to include most economical and user friendly layout in existing space, utilizing and installing all equipment, including supply of said equipment, but maintaining best value for money, cost effectiveness (in terms of the requirement of additional cabling, air supply, extraction ducting, etc.) and adhering to best practices in terms of fire safety (marine FSS Code) and HACCP regulations.
View the procurement »
2020-01-13Construction of a 600 Pupil Post Primary School and Sports Hall at Cloonmore, Tralee (Kerry Education and Training Board)
The project comprises the construction of a 600 pupil post primary school with connected sports hall and ESB sub station, 4 No ballcourts, new internal road with set-down for buses and cars and accessing 55 No car parking spaces and associated ancillary landscaping and siteworks.
The total development area is circa 7 159 m plus 80 m external store
New vehicular and pedestrian entrance of proposed Ballymullen Clash Link Relief Road. New internal access road for access to the East of St Brigid’s Community …
View the procurement »
2020-01-09Grove Hospital Tuam — Accommodation for Community Mental Health Team (Health Service Executive (HSE))
This project at The Grove Hospital, Vicar Street, Tuam, Co. Galway will consist of part-demolition, refurbishment and remodelling of The Grove Hospital along with new extensions and site works. This is to provide a mental health services facility, early intervention and disability services facility and shared services for The HSE West.
The site is the existing vacated buildings in Tuam, known as ‘The Grove’.
The project involves the renovation and extension of the current buildings on site to provide:
— …
View the procurement »
2019-12-23New Bailieborough Garda Station — Main Contract (Reserved Specialist Procedure) (Office of Public Works (OPW))
Demolition of a 3 storey rear extension to the north of the NIB building, a 1 storey concrete building to rear of NIB building and 2 No out-buildings; conservation and change of use of building; construction of a new 3 storey over basement building, linked to building at ground and first floor level, with a partial plant storey at roof level; provision of carparking, bicycle and motorcycle parking; landscaping of the external forecourt to include replacement accessibility ramp, set down area and revised …
View the procurement »
2019-12-20Development of 31 No Dwelling Houses at Ennell Court, Mullingar, Co. Westmeath (Westmeath County Council)
The development will consist of the demolition of 3 No houses and associated outbuildings and the construction of 31 No single and 2 storey dwellings in 2 phases including 2 No apartments. Phase 1 to consist of 19 No units and Phase 2 to consist of 12 No units. Proposed ancillary works include, but are not limited to — the construction of footpath kerbing and roadway, provision for ducting for utilities, construction of surface water and foul drainage system including utilities, provision of earthworks, …
View the procurement »
2019-12-20DCU Minor Works Contract Framework (Dublin City University (DCU))
Dublin Software Park DAC / Dublin City University ("DCU") intends to appoint six (6) nr Contractors to a Framework to carry out selected works on properties owned and operated by DCU, it's subsidiaries and all associated colleges in the Dublin region, consisting of, but not limited to DCU Glasnevin, DCU St Patrick's Campus, DCU All Hallows Campus, DCU Sports Campus - St Claire's and DCU Alpha Campus currently including 78 buildings and over 280 000 m2.
View the procurement »